Key Takeaways
- Volume-led quarter, margin under pressure: Volume grew on seeding of newer markets and clinker sales, but a rising lead distance and a dip in premium mix weighed on realizations.
- Northeast project restructured as a 100% owned asset: The acquisition is now a direct mine-ownership model, saving the balance consideration of Rs.190 crores and simplifying the corporate structure.
- Durg expansion CAPEX revised up to Rs.3,000 crores: The 20% increase reflects added equipment, cost escalation, and new railway sidings, with order placement set to begin this quarter.
- Cost-savings target of Rs.100-120 per ton intact: Management is betting on renewable energy, alternative fuels, and AI-led manufacturing to offset cost headwinds over the next 12-24 months.
- What to watch next quarter: The firming up of the Northeast project’s size and cost, the start of Durg expansion ordering, and any uptick in pricing after the monsoon trough.
Volume & Demand Dynamics
- Volume drivers: Growth was fueled by seeding in newer markets, specifically UP East and parts of Central India, plus clinker sales. Markets like M.P. East (served from Durg) and Maharashtra East contributed, while the North region was flat or declined in volume terms.
- Lead distance rose: The average lead increased from 393 km to 399 km as JKLC pushed into distant markets to build brand awareness ahead of future plant commissioning. This is a deliberate investment, not a structural cost creep.
- Premium mix diluted: The share of premium cement fell from 25% to 23% because incremental volume in newer markets was base product. Management stated the premium proportion in core markets remains intact.
- Pricing softness: Prices were more or less stable overall, but non-trade prices dipped a little in the North and East. Both trade and non-trade prices slid a bit compared to the June exit, with July-September typically a low-demand period.
Management: "Competition is going to be there in the market. It is all about how we are going to have our own strategy, which is going to really take on to those challenges and ascertain our objective, right."
Expansion Pipeline & Project Updates
- Durg expansion: The clinkerization unit and two grinding units (at Durg and Madhubani) are targeted for March 2027, with the remaining two grinding units following one year later. Total CAPEX is now Rs.3,000 crores, up from Rs.2,500 crores, due to additional equipment like a Triplex, cost escalation, and railway sidings at three grinding units. Order placement is expected to begin in Q2 FY26.
- Northeast project restructured: Two of three mines have come directly to JK Lakshmi as the 100% owner under a Mine Developer and Operator model. The third mine may be auctioned later. The project will now be executed in JK Lakshmi itself, not in the subsidiary Agrani. The balance consideration of Rs.190 crores payable to the erstwhile owner is no longer due, and the higher royalty cost (Rs.251 vs Rs.105 per ton) is offset by the saved acquisition cost, leaving the project IRR materially unchanged.
- Surat grinding unit: Commissioning is expected to be announced in the ongoing quarter (Q2 FY26).
- Railway siding and conveyor belt: Most CAPEX for the railway siding is already spent, with only some line revamping left. The overhead conveyor belt has SAIL board approval and is in the final stages of clearance from the Ministry of Industries and Steel; the delay is procedural.
- Land acquisition progress: For Nagore, one mining lease is almost through, while the second involves an exchange of gochar and forest land; plant land is identified and partly acquired. Kutch/Saurashtra is ahead of Nagore, with the public hearing done, environment clearance in process, and government land obtained. Madhubani and Prayagraj both have plant land in place, with Madhubani ahead on environmental clearances.
Management: "So, ultimately, this Northeast project, which was earlier supposed to have happened in a subsidiary, Agrani and other things, will happen in JK Lakshmi as 100% owner."
Cost Structure & Margin Levers
- East vs. North cost advantage: In the East, the plant uses linkage coal and about 80% renewable energy, with lower logistics leads because the plant in Chhattisgarh serves bordering areas of neighboring states. In the North, fuel is imported pet coke and coal. Management did not quantify the EBITDA per ton differential on the call.
- Other expenses: The increase is linked to volume growth and is not entirely fixed cost.
- Cost-savings program: A target of Rs.100-120 per ton in savings over the next 12 to 24 months remains intact. Levers include increasing renewable energy share from 49% to 52%, raising TSR/AFR usage in integrated units, AI-led manufacturing initiatives, and supply chain improvements like direct dispatches, alternative transportation modes, and lead reduction.
- Renewable energy target: The renewable portfolio is expected to reach around 52% this fiscal year.
Balance Sheet & Capital Allocation
- Leverage policy: Management’s endeavor is to keep net debt-to-EBITDA below 3x. It acknowledged the ratio may marginally exceed this during the expansion phase, when debt enters the balance sheet before commensurate EBITDA from ramp-up follows one to two years later.
- CAPEX plan: Total outlay of Rs.4,800 crores over three years: Rs.1,500 crores this year, Rs.1,800 crores next year, and Rs.1,500 crores the following year.
- Debt: The company may take on Rs.1,000 crores of additional debt this year.
- Non-cement revenue: Guidance of Rs.1,500 crores, Rs.1,800 crores, and Rs.1,500 crores over the next three years.
- Recovery of Rs.130 crores: Management will pursue legal possibilities to recover the amount from the erstwhile promoter once everything is streamlined.
Management: "Generally, our endeavor is to keep it below three. But when we do go for the expansion as we are doing, at the time when we are nearing the expansion, the debt comes on the balance sheet, whereas the commensurative EBITDA follows one year, two years later based on the ramp-up which we are able to do from that expansion."
Strategic Positioning & Market Share
- Market share: JKLC holds a reasonable 10-12% share in the markets where it operates, with 13-14% in Chhattisgarh and Gujarat, and a good share in Rajasthan.
- Top-line initiatives: The strategy includes consolidating the Green Plus brand, improving the premium product mix, and improving price positioning. The target is to reach a minimum of 27% premium cement by the end of this fiscal year.
- South market entry: Not a strategic fit currently, but management would not rule it out if an opportunity came at the right price.
- Capacity target: A clear roadmap to reach 3 crore tons by 2030.
- Expansion sequencing: The priority order is Durg expansion first, then Northeast, then Kutch, then Nagore. Nagore and Kutch are broadly planned at 0.3 crore tons each but are still far away.
Management: "Our target is to reach to minimum 27%-plus premium cement."
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Volume growth | Will do better than industry; at least incremental over industry growth | Ongoing |
| Durg expansion first phase | Clinkerization and two grinding units at Durg and Madhubani | By March 2027 |
| Durg expansion second phase | Balance two grinding units | One year after first phase |
| Surat grinding unit commissioning | Announcement expected | Q2 FY26 |
| Northeast project size and cost | To be firmed up and confirmed | By Q2 FY26 results call |
| Northeast order placement | Start placing orders | Immediately after Durg orders |
| CAPEX outlay | Rs.1,500 cr / Rs.1,800 cr / Rs.1,500 cr | FY26 / FY27 / FY28 |
| Additional debt | May take Rs.1,000 crores | This fiscal year |
| Premium cement mix | Reach minimum 27% | By end of this fiscal year |
| Renewable energy share | Reach around 52% | This fiscal year |
| Cost savings | Rs.100-120 per ton | Next 12 to 24 months |
| Madhubani start | May start | By March 2026 |
| Prayagraj start | Start | September/October FY27 |
| Patraru start | Start | Around March 2028 |
| Capacity target | 3 crore tons | By 2030 |
Key Metrics
| Metric | Q1 FY26 |
|---|---|
| Revenue | ₹144 cr non-cement revenue, operating margin 4%; cement revenue is total revenue less this |
| Volume growth | 5%–6% industry volume growth; company expects to outperform |
| Operating cost reduction target | ₹100–120 per ton over next 12–18 months, intact |
| Net debt-to-EBITDA | 1.5x; endeavor to keep below 3x |
| CAPEX incurred (Q1) | ₹100 cr |
| CAPEX guidance (FY26) | ₹1,500 cr; ₹1,800 cr in FY27, ₹1,500 cr in FY28 |
| Additional debt planned (FY26) | ₹1,000 cr |
| Durg expansion total CAPEX | ₹3,000 cr over three years, up from ₹2,500 cr due to additional equipment and railway sidings |
| Durg expansion capacity addition | 0.23 cr tons clinker, 4.6 (likely lakh tons) cement |
| East capacity utilization | ~100% |
| Premium cement share | 23% vs 25% QoQ; target 27%+ by year-end |
| Renewable energy share | 49%, target 52% in FY26 |
| Lead distance | 399 km, up from 393 km |
| Market share (key states) | 10%–12% in operating markets; Chhattisgarh 13%–14%, Gujarat 13%–14% |
| Northeast mines royalty | ₹251 per metric ton, up from ₹105 earlier |