Key Takeaways
- Volume target reset, not abandoned: FY24 volume growth guidance cut to 12–15% from 19% after H1 delivered only 9.4%, making the original target mathematically unreachable. The Rs. 1,000/ton EBITDA ambition over ~22 months remains intact.
- Pricing tailwind building into H2: East prices rose in September–October, and management expects a Rs. 50–100 QoQ realization improvement, with North and West recovering post-Diwali.
- Udaipur clinker live, grinding to follow: The 1 crore ton clinker unit is commissioned; the 0.25 crore ton grinding unit targets March–April, leaving a 5–6 month window where surplus clinker will be sold externally.
- Trade mix shift is deliberate, not defensive: Trade sales jumped to 68% from 58% QoQ, paired with a geo-mix tilt toward low-credit-zone, better-realization markets. Management calls it designed, not default.
- What to watch next quarter: Whether the promised QoQ price increase materializes across North and West, the pace of the second Udaipur line ramp toward 70–80% utilization, and any announcement on the Durg brownfield expansion.
Volume & Pricing
- Why the target was cut: H1 volume growth of 9.4% meant hitting the original 19% full-year target would have required 27%+ growth in H2, which management judged unrealistic. The revised 12–15% range embeds a more achievable H2 acceleration.
- Pricing by region: East prices moved first, rising mid-September and into October, so Q3 will capture the full benefit. North and West are expected to stay flat through November (a seasonally weak Diwali month) and improve from December onward.
- Demand by region, ranked: East led YoY percentage growth last quarter, followed by North, West, and South. Management sees East sustaining 8–10% growth, driven predominantly by the individual house builder segment.
- Lead distance as a margin lever: Lead was reduced by 13 km to 387 km, which shifts the modal mix toward road and away from higher-cost rail, directly lowering logistics expense.
Management: "I think 18 to 40, 22 months' time period for Rs. 1,000 EBITDA, that remains intact."
Expansion Projects
Udaipur (commissioned and in progress)
- Clinker unit: 1 crore ton capacity reached and operational. During the 5–6 month gap before the grinding unit arrives, 40–50% of clinker output will be consumed internally at Rajpura, Gujarat, and Surat grinding stations; the balance will be sold as clinker.
- Grinding unit: 0.25 crore ton, commissioning targeted for March or April.
- Second line ramp: Management aims to push utilization to 70–80% by Q4.
Surat grinding unit (newly announced)
- Capacity and timeline: 0.14 crore ton, with a 2-year timeline targeting 1H FY26. Management is exploring a phased approach: an initial tranche followed by the full 1.35 crore tons within 6–8 months.
- Strategic logic, three reasons: (1) Surat's existing capacity is nearly exhausted; (2) South Gujarat delivers better pricing than North Gujarat; (3) the unit opens access to the Mumbai market. Net of clinker freight, Surat is a higher-realization, more profitable market.
- Clinker sourcing: A combination of efficiency gains at Sirohi with minimal capex, clinker from Udaipur, and imports if needed. Import and domestic clinker costs have been broadly comparable, with domestic slightly better after recent fuel cost softening.
- Incentives: Application submitted; management is hopeful but has no confirmation yet.
Durg (next in line)
- Railway siding: Approval received, construction begun, commissioning expected Q2/Q3 next fiscal.
- Conveyor belt: The larger railway-siding approval is in hand; the conveyor belt green signal is expected this quarter, with ~8–9 months to completion thereafter. Together, these will enable access to high-price western markets, cheaper inbound raw material, and cheaper clinker transfer to Cuttack and Amethi grinding stations.
- Brownfield expansion: Clinkerization at the mother plant plus grinding at split locations to be announced this financial year.
Management: "We are trying to see if we can do it in phases instead of entire 1.3 coming in one shot, if we can do initially a bit off of that and then within 6 to 8 months do the complete 1.35."
Costs & Efficiency
- Fuel cost tailwind: Pet coke inventory covers 3 months. kcal is expected to drop from 2.04 to 1.9 next quarter, implying a ~5% reduction in fuel cost. Fuel mix currently stands at 46% pet coke, 38% coal, balance other.
- Renewable power ramp: Durg's renewable share will jump to 80% from 36% once 40 MW of solar power sourcing begins. Overall JK Lakshmi standalone plants ran at ~35% renewable this quarter and will inch up as the Durg sourcing kicks in from October.
- AFR (alternative fuel and raw material): TSR (thermal substitution rate) target is to rise from the current 4% to 12% and ultimately 20% in phases. Durg will reach ~6%; Sirohi's first AFR phase may start in the last quarter of this financial year, also reaching ~6%.
- Profitability improvement is gradual by design: Management cited a combination of better volumes YoY, realization improvement (price increases, trade mix, geo mix, premium products), manufacturing and logistics actions, AFR improvement, and fuel cost softening. Some actions are still work in progress, so the full effect plays out over 18–24 months.
Management: "Some of the actions are still work in progress. So, you will see that gradual improvement, and that is why I took that time of 18 to 24 months."
Non-Cement & Value-Added Businesses
- AAC blocks (Aligarh): Plant commissioned and stabilized, running at ~75% utilization and producing ~11,000 cubic meters per month.
- Wall putty (Alwar): Delayed by the NCR ban on construction activities; trials now targeted by end of Q3.
- Value-added products ambition: Grow from the current Rs. 500 cr level to Rs. 1,000 cr by end of FY27/FY28.
- Non-cement margin profile: Margins in the non-value-added segment are low; EBITDA margin was 3% this quarter.
Balance Sheet & Capex
- Standalone gross debt (JK Lakshmi): Expected to reach ~Rs. 880 cr in the coming 6 months and ~Rs. 1,000 cr by March 2025. Net debt to remain at ~Rs. 140–150 cr.
- Consolidated gross debt: Expected to peak at ~Rs. 2,400 cr by March 2024 and ~Rs. 2,600 cr by FY25. Consolidated net debt to reach ~Rs. 1,600 cr then ~Rs. 1,800 cr.
- Capex outlay: Current year consolidated: Rs. 1,200 cr; next financial year: Rs. 600 cr. If the Durg brownfield expansion is announced, that will be additional.
- Leverage guardrail: Long-term guidance of peak net debt to EBITDA around 3x remains unchanged and is not recalibrated on a quarterly basis.
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Volume growth | 12–15% for FY24 | FY24 full year |
| EBITDA per ton | Rs. 1,000/ton | 18–40 months (~22 months) |
| QoQ price increase | Rs. 50–100/ton | Q3 FY24 onward |
| Udaipur grinding unit | 0.25 crore ton commissioned | March–April 2024 |
| Surat grinding unit | 0.14 crore ton (phased to full 1.35 cr) | 1H FY26 (~2 years) |
| Durg railway siding | Commissioned | Q2/Q3 next fiscal |
| Conveyor belt (Durg) | Approval this quarter, then 8–9 months | ~9–12 months from approval |
| Fuel kcal reduction | 1.9 (from 2.04), ~5% fuel cost reduction | Next quarter |
| Renewable share (Durg) | 80% (from 36%) | From October onward |
| AFR (TSR) | 12% (from 4%), ultimately 20% | Phased, Sirohi start Q4 FY24 |
| Alwar putty plant | Trials begin | End of Q3 FY24 |
| Value-added products revenue | Rs. 1,000 cr (from Rs. 500 cr) | End of FY27/FY28 |
| Durg brownfield expansion | Announcement | This financial year |
| Peak consolidated gross debt | ~Rs. 2,600 cr | FY25 |
| Net debt to EBITDA ceiling | ~3x | Long-term (no quarterly reset) |
Key Metrics
| Metric | Q2 FY24 |
|---|---|
| Consolidated volume growth (H1) | 9.4% YoY |
| Full-year volume growth guidance | 12–15% (revised from 19%) |
| Trade share | 62% (up from 58% QoQ) |
| Blended cement ratio | 65% |
| Premium product share | 23% of trade sales |
| Lead distance | 387 km, down 13 km QoQ |
| Non-cement revenue | ₹130 cr, EBITDA margin 3% |
| EBITDA per ton target | ₹1,000 over 18–40 months |
| QoQ realization increase expected | ₹50–100 per ton |
| Standalone gross debt | ₹680 cr; net debt ₹140 cr |
| Consolidated gross debt | ₹1,975 cr; net debt ₹1,175 cr |
| Consolidated peak gross debt guidance | ₹2,400 cr by Mar ’24, ₹2,600 cr by FY25 |
| Consolidated CAPEX (current year) | ₹1,200 cr (₹500 cr JKLC + ₹700 cr UCWL) |
| Fuel mix (pet coke) | 46% pet coke, 38% coal |
| kCal cost | 2.04 overall, expected 1.9 next quarter |
| Green power share | ~35% of JKLC plants’ consumption |
| AFR thermal substitution rate | ~4%, targeting 12% then 20% |
| UCWL clinker production | 3.84 lakh tons |
| UCWL cement sales | 4.68 lakh tons; clinker sales 0.92 lakh tons |
| Value-added business revenue ambition | ₹1,000 cr by FY27–28 (currently ₹500 cr) |