Key Takeaways
- Volume growth moderated but beat the industry: Consolidated volumes rose 8% against an estimated industry growth of 6–7%, though the earlier 12–15% aspiration was disrupted by a severe North Indian winter.
- EBITDA per ton hit a milestone: The company reached Rs. 1,000 EBITDA per ton, consolidating at this level and narrowing the gap with industry leaders, with further internal margin levers still in play.
- A multi-front expansion cycle is now fully underway: Board approvals for Durg, a Northeast acquisition, and the nearing Udaipur completion lock in a 30-30 roadmap that will stretch the balance sheet toward a peak net debt of ~Rs. 3,500 crore.
- Reporting is being reset, and not all restated data is ready: Management removed outsourced volumes to eliminate double-counting with UCWL, but declined to provide restated historical quarterly numbers on the call, asking analysts to follow up separately.
- What to watch next quarter: The Q4 volume growth print against the 8–10% expectation, the exact quarter-wise CAPEX breakdown promised on the next call, and any concrete timeline for the Northeast project.
Volume Growth & Demand Environment
- North disruption hit harder than planned: Severe cold and a graph restriction stalled construction activity in the North, pulling actual growth below the 12–15% assumption management had already begun moderating on the prior call.
- East is the engine: The Eastern region delivered the highest growth of any zone in India, driven by the individual home builder segment, and management believes this outperformance has room to run.
- Cement-only growth was a more modest 5%: The 8% consolidated headline includes clinker sales, which management actively discourages and which de-grew during the quarter.
- Q4 expectation set at 8–10%: January volumes were already tracking around that level, but peak-period capacity is nearly exhausted, so further growth must come from levers like increasing the blended cement mix to raise throughput.
- Durg capacity is effectively maxed out: Utilization at Durg is "almost done exhausted," which is precisely why the company chose the East for its next expansion phase.
Management: "If I look at Eastern market growth, I think growth of Eastern market is the highest in all zones in India, be it north, central, south or west. Moving forward also, I believe that this is going to be there for some time as to individual home builder segment which is ever growing."
Profitability & Margin Levers
- Rs. 1,000 EBITDA per ton is now the consolidated base: Management views JKLC and UCWL combined as the relevant metric, and the last two quarters show sustained improvement at this level.
- The ambition is to track the top 5: If industry leaders move to Rs. 1,500–1,600 per ton, the company intends to move in the same direction, with further consolidation of internal margin drivers still ahead.
- Fuel costs are still easing: Q3 fuel cost was ~Rs. 1.78 per unit; Q4 is expected marginally lower at ~Rs. 1.7, providing a small sequential tailwind.
- Green power is scaling toward a 50% company-wide share: Durg has already reached 80% green power after a recent arrangement, and the Sirohi 7 MW solar plant is on track for commissioning around mid-March 2024.
- AFR is contributing: The Sirohi AFR project clocked 11% TSR in the last month, with a Phase 2 plan to reach 16–17% in FY25, though management declined to quantify the savings from that ramp on this call.
Management: "Our endeavor Uttamji is to be amongst top 5 players because market dynamics keep on changing, right? So, our effort is EBITDA goes to even 1,500, 1,600 also for others, we should also be moving in the same direction."
Expansion Projects & the 30-30 Roadmap
- The 30-30 plan is on track: The sequenced roadmap, expand Durg, then add a line at Udaipur, then Nagor and Kutch, is being followed as originally prepared.
- Durg expansion is the centerpiece: A new clinker line of 0.23 crore tons and four grinding units with 0.46 crore tons aggregate capacity were approved. Phase 1 delivers clinkerization and two grinding units in two years; the two split-location grinding units follow one year later.
- Equipment ordering is the critical path: The board approval is in hand and the team is starting the ordering process now, but how fast equipment and accessories can be secured will determine the actual completion speed.
- Udaipur expansion is nearing the finish line: Completion is expected toward the end of Q4 FY24, and the unit has also acquired an additional mine, removing any limestone shortage risk.
- Northeast entry via acquisition: The company agreed to purchase an 85% stake in a Northeast entity for ~Rs. 300 crore, with an initial capacity of 0.1 crore tons. Existing promoters retain 15% and will contribute equity proportionally. The timeline is still being worked out.
- Surat grinding unit and Amethi tolling continue: The Surat brownfield expansion is proceeding as planned, while the Amethi grinding unit operates on a tolling basis with a JIRA-based contract, sharing roughly 50% of capacity with another industry player.
- Next after Durg is the Northwest: Once Udaipur stabilizes, the company will look at expanding in the Northwest, consistent with the 30-30 roadmap toward self-dependence in clinker and grinding.
Management: "The only thing is how fast we can get all those equipments and accessories to put that plant up. That is what is going to be on critical path."
Restructuring & Reporting Changes
- Outsourced volumes are now excluded: Management removed outsourced volume from reported numbers to eliminate double-counting from inter-unit sales between JKLC and UCWL. The company that ultimately sells to the market now shows that as sales, and outsourcing will be scaled down considerably going forward, making it negligible.
- A restructuring committee has been formed: The board will evaluate the possibility of restructuring or consolidating JK Lakshmi Cement and Udaipur Cement Works, with serious consideration expected next year.
- Historical restated data was not provided on the call: Analysts asked for restated quarterly volumes for FY23, Q1 FY24, and Q2 FY24 after the double-counting removal. Management declined to provide the numbers on the call, asking analysts to send a mail and promising the team will answer separately.
- Purchase of goods breakdown is pending: The Rs. 130–140 crore quarterly line (~8% of top line) primarily covers value-added products like RMC and AAC blocks, but management did not have the split between traded goods and value-added products readily available and said they will confirm later.
Management: "That's why it was very negligible and just because of the volume getting, distorting the actual real profitability of the company."
Balance Sheet & CAPEX
- A three-year fundraising plan is laid out: ~Rs. 500–700 crore in FY25, ~Rs. 1,000 crore in FY26, and the balance thereafter, with exact quarter-wise CAPEX numbers promised on the next call.
- Peak net debt is projected at ~Rs. 3,500 crore: After ~Rs. 1,000 crore in repayments, net debt is expected to increase by ~Rs. 1,000–1,500 crore over three years, with a firm target to keep net debt to EBITDA below 2.5x.
- Durg CAPEX is front-loaded: Roughly 40% of the Durg expansion CAPEX falls in FY25 and ~60% in FY26.
- State incentives will be pursued: For split-location grinding units in UP, Bihar, and Jharkhand, and for the Northeast project, the company will try to secure incentives as per each state's policy.
Management: "And our target for this would be to keep it net debt to EBITDA, anywhere between less than 2.5 max."
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Volume growth | 8–10% consolidated volume growth | Q4 FY24 |
| Udaipur expansion completion | New line operational | End of Q4 FY24 |
| Railway siding Phase 1 | Rs. 325 crore project, first phase | September 2024 |
| Sirohi solar plant | 7 MW, company-owned CAPEX mode | Mid-March 2024 |
| Durg expansion Phase 1 | Clinker line + 2 grinding units | By March 2026 (2 years) |
| Durg expansion Phase 2 | 2 split-location grinding units | One year after Phase 1 |
| Railway siding Phase 2 | Second phase of Rs. 325 crore project | March 2026 |
| Fundraising | ~Rs. 500–700 cr FY25, ~Rs. 1,000 cr FY26, balance thereafter | Over next 3 years |
| Peak net debt | ~Rs. 3,500 crore, net debt/EBITDA below 2.5x | Over next 3 years |
| Green power share | Graduate to 50% on a company basis | No date (in progress) |
| Sirohi TSR | Reach 16–17% | FY25 |
| Volume growth next year | "Early two-digit number" with additional Udaipur capacity | FY25 |
| Restructuring evaluation | Committee formed to evaluate JKLC-UCWL consolidation | Serious consideration next year |
Key Metrics
| Metric | Q3 FY24 |
|---|---|
| Revenue | Not stated |
| Operating EBITDA per ton | ₹1,000, achieved target earlier than envisaged |
| Volume growth (consolidated) | 8% YoY |
| Volume growth (cement only) | 5% YoY; clinker sales de-grew |
| Volume growth (9M FY24) | 6.6% YoY |
| Trade mix | 58%, up 3 ppt QoQ |
| Blended cement share | 65% of total sales |
| Premium cement share | 12% of overall volume, 25% of credit sales |
| Fuel cost (kCal) | ₹8,700, approx 1.7 at kCal |
| Fuel cost expected Q4 FY24 | ~₹1.7 per kCal |
| Green power share | 44% of total power |
| Lead distance | 377 km |
| Value-added products revenue | ₹134 cr, margins ~5%; RMC contributed ₹67 cr |
| Consolidated net debt | ₹1,150 cr as of Dec 31, 2023; gross debt ₹2,000 cr, cash ₹850 cr |
| Standalone net debt | ~₹50 cr as of Dec 31, 2023; gross debt ~₹700 cr, cash ~₹675 cr |
| CAPEX incurred (9M FY24) | ~₹250 cr (JK Lakshmi standalone), ~₹450 cr (UCWL) |
| CAPEX planned Q4 FY24 | ~₹500 cr consolidated: ~₹250 cr JK Lakshmi, ~₹300 cr Udaipur |
| Total CAPEX guidance (next 3 years) | ₹4,000 cr: Durg expansion ₹2,500 cr, ongoing projects ~₹200 cr, railway siding ₹300 cr, Northeast ~₹1,000 cr |
| Peak consolidated net debt target | ~₹3,500 cr over next 3 years; net debt to EBITDA target less than 2.5x |
| Durg expansion capacity | Clinker line 0.23 crore tons, grinding units aggregate 0.46 crore tons |
| UCWL new line ramp-up plan | ~60% utilization in first year, 75% next year, 80% thereafter |
| TSR at Sirohi | 11% achieved; Phase 1 target ~13%, Phase 2 target 16–17% |
| TSR savings at Sirohi | ₹25–₹28 per ton currently |