Key Takeaways
- Sharp realisation hit from non-trade exposure: Realisations fell Rs. 456/t QoQ as non-trade prices corrected more than 10% post-GST reduction, amplified by JK Lakshmi's concentrated western footprint and the Surat ramp-up priority.
- Trade share dip was temporary: Trade mix dropped from 53% to 49% on Gujarat non-trade volumes and post-GST confusion, but management says December-January trade share has already recovered to better than before.
- Cost tailwinds partially offset the pain: Input costs fell ~Rs. 150/t QoQ, driven by lower power cost and a sharp >Rs. 100/t freight decline as higher non-trade sales shifted mix toward ex-factory dispatches.
- Demand momentum intact into Q4: Management expects double-digit volume growth for both industry and JK Lakshmi in Q4, with non-trade prices already rising across most markets from late December.
- What to watch next quarter: Whether the promised realisation recovery materialises in similar quantum to the Q3 loss, and how the Durg expansion CAPEX ramp-up to Rs. 1,600-1,700 crores in FY27 stresses the 3-3.5x net debt/EBITDA ceiling.
Realisation & Pricing
- Non-trade price collapse: Non-trade realisations corrected more than 10% QoQ, while trade prices fell only 2-3%. The GST reduction on 22nd September created market confusion on price pass-through, and demand shifted toward the non-trade segment just as JK Lakshmi prioritised ramping up newly commissioned Surat capacity in the non-trade-heavy Gujarat market.
- Concentrated footprint amplifies volatility: JK Lakshmi operates in specific geographies (North: Rajasthan, Haryana, west UP; West: Gujarat, Mumbai; East: Chhattisgarh, Odisha). Any market movement hits harder than for peers with spread footprints where impacts average out. In Q2, all regions performed well together; in Q3, west India non-trade prices dragged disproportionately.
- Recovery underway: Non-trade prices have risen in almost all markets from late December onward, except Odisha. Trade prices are expected to follow on two counts: improved demand (strong December, continuing into January-February) and rising fuel costs. Management sees realisation recovering in similar quantum to the Q3 loss.
- Blended share held flat despite trade mix shift: Blended cement share stayed at 62% even as trade share fell 4pp, because institutional sales now include blended cement (PPC) supplied to Ready-Mix plants, not just OPC. Target is to reach 67% blended share, improving the clinker-to-cement ratio.
Management: "Almost in all markets post, I would say December onward, maybe in the latter part of December, non-trade prices have gone up everywhere. Trade prices have not gone up that much, but I see since demand has been very good in the month of December and that is still continuing in January and February also is a similar situation. I see that prices in trade also will go up from two counts. One, improved demand situation and also fuel prices are going up."
Volume & Demand
- Q3 disruption was temporary: Trade volume degrowth reflected post-GST price confusion, Diwali season labour shortages, extended rains keeping labourers off sites, and Bihar elections drawing workers back to home states. Management characterises the trade share dip as "extremely temporary," with December-January recovery already exceeding prior levels.
- Q4 outlook is strong: Management expects double-digit volume growth for both industry and JK Lakshmi in Q4, despite a higher base. Industry growth for full FY26 is estimated at ~7%.
- FY27 growth contingent on industry: JK Lakshmi expects similar volume growth in FY27 as the current year, with headroom available at Surat, Udaipur, Jhajjar/Jharli, and Cuttack. The Durg expansion adds further capacity from March 2028.
Management: "The Q4 being the base little higher. So, I think demand momentum is good. What we see definitely, double digit growth in Quarter 4 as well."
Costs & Margins
- Input cost relief: Raw material, power, fuel and chain-in-stock costs fell ~Rs. 150/t QoQ. Power cost declined from Rs. 5.52 to Rs. 5.37 per unit. Freight cost saw a sharp >Rs. 100/t drop, driven by higher non-trade sales (mostly ex-factory) and lower lead distances.
- Fuel cost to rise: Management expects fuel cost to increase to at least Rs. 1.58-1.60 per unit as old lower-cost stock is exhausted and new purchases at higher prices flow through.
- Employee cost optimisation: Employee costs declined due to productivity improvements, not salary cuts. A first phase of optimisation was completed last year; a second phase began 3-4 months back, focused on improving per-person cement revenue per ton. Employee cost is expected to stabilise or rise slightly as new sites (Surat) and an expanded Ready Mix footprint add headcount.
- Depreciation step-up: Depreciation rose from Rs. 78 crores to Rs. 85 crores QoQ, mainly from Surat commissioning (last week of September), normal CAPEX, and leasehold land depreciation.
Expansion Projects
- Surat grinding station: Commissioned 22nd September 2025. Testing and ramp-up were the priority in Q3, contributing to the non-trade volume surge in Gujarat. Interest and depreciation charges have begun flowing through the P&L.
- Durg project: Entire project including all spread locations to be completed by March 2028. CAPEX phasing: ~Rs. 400 crores in FY26, Rs. 1,600-1,700 crores in FY27, balance in FY28. Equipment mostly ordered; construction to start after excavation; operational timeline of 12-13 months from now. Railway siding Phase 2 also expected by March 2028.
- Conveyor belt: Still stalled on land issues; status unchanged from last quarter, in final stages of resolution.
- Alwar plant: Ramping up; currently produces Putty and small quantities of white cement.
- Longer-term pipeline: Stand remains unchanged on further expansion at Nagore, Kutch, and Assam to reach 3 crore tons.
Non-Cement Business
- Margin profile: Ready Mix operates at 3-5% EBITDA margin; Plaster of Paris is higher; AAC blocks sit in between. Management aims to improve margins but does not expect them to approach cement-level profitability.
- Timeline: Margin improvement will take at least 2 years.
Balance Sheet & Leverage
- Net debt to EBITDA ceiling: Management will try to maintain net debt/EBITDA at 3-3.5x and will not cross that limit, even as Durg CAPEX peaks at Rs. 1,600-1,700 crores in FY27.
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Realisation recovery | Recover in similar quantum as the Rs. 456/t Q3 loss | Q4 FY26 (implied) |
| Q4 volume growth | Double-digit growth for industry and JK Lakshmi | Q4 FY26 |
| Fuel cost | Rise to at least Rs. 1.58-1.60 per unit as old stock exhausts | Near term |
| Durg project completion | Entire project including spread locations and railway siding Phase 2 | March 2028 |
| Durg CAPEX | ~Rs. 400 cr FY26, Rs. 1,600-1,700 cr FY27, balance FY28 | FY26-FY28 |
| Blended cement share | Increase from 62% to 67% | Not specified |
| Net debt/EBITDA | Maintain at 3-3.5x, will not cross | Ongoing |
| Non-cement margin improvement | Improve from current 3-5% (RMC) but not to cement levels | At least 2 years |
| FY27 volume growth | Similar to current year, contingent on industry growth | FY27 |
Key Metrics
| Metric | Q3 FY26 |
|---|---|
| Revenue | Not stated |
| Realisation decline | ~9% QoQ |
| Operating margin | Not stated |
| EBITDA margin (non-cement business) | 4% |
| Net profit | Not stated |
| Trade share | 49%, down from 53% QoQ |
| Blended cement share | 62%, flat QoQ |
| Clinker utilisation | 90% |
| Clinker sales volume | 1,51,000 tonnes |
| Non-cement business revenue | ₹147 crores |
| RMC revenue | ₹67 crores |
| AAC blocks revenue | ₹56 crores |
| Power cost per unit | ₹5.37, down from ₹5.52 QoQ |
| Fuel cost (consumption basis) | ₹720 per 1,000 kcal, ₹1.56 |
| Total CAPEX FY26 (consol) | ₹650–700 crores |
| Durg Line-2 CAPEX (9M FY26) | ₹250–260 crores |
| FY27 CAPEX target | ₹1,600–1,700 crores |
| Durg project total CAPEX | ₹3,000 crores (excluding conveyor belt) |
| CC ratio | 1.44, target to improve to 1.54+ via blended cement push to 67% |
| Non-trade price increase (since Jan 1) | ₹10–15 per bag |
| Fuel price outlook (Q4) | 1.58–1.60 |
| Depreciation increase | ~₹7–8 crores QoQ (₹78 cr to ₹85 cr), ~₹6 cr from Surat commissioning |
| Maintenance CAPEX | ₹50 crores per year |
| Conveyor belt balance CAPEX | ~₹170 crores |