Key Takeaways
- Records across the board: Total income grew 2.3x YoY and EBITDA 2.6x YoY, both highest ever, while adjusted PAT swung to a INR 54 crores profit from a year-ago loss.
- The build-out is accelerating: Over 1 GWp of generation and ~500 MWh of BESS commissioned in the first seven months, taking operational capacity to 2.8 GWp plus 600 MWh of BESS.
- Balance-sheet strength is unlocking cheaper capital: An AA- corporate rating upgrade and INR 2,500+ crores of sub-8% refinancing pushed the weighted average cost of debt down to 8.46%.
- Battery arbitrage is printing, and management expects it to last: Standalone BESS capacity that was bid out at ultra-aggressive tariffs has not materialised, leaving a supply gap that Juniper is filling with merchant batteries while power demand grows at over 10%.
- What to watch next quarter: Whether the 4 GW of LOAs convert to signed PPAs in the next 1–1.5 months, the pace of BESS installation toward the 4.5 GWh June '27 target, and any movement on thermal mimic PPA signings with DISCOMs.
Operational Performance
- Generation doubled on new capacity and better wind: Q2 generation rose 127% YoY to 113 crore units, with fleet-wide CUF improving to 27% from 21% a year ago, driven by the wind portfolio where CUF jumped to 50% from 41.3%.
- Wind portfolio carried the CUF story: Specific projects delivered standout performance, with Beam at 58.3% and Kite at roughly 58%, while plant availability held at 98.7% and grid availability at 99.5% in H1.
- Curtailment was a 2.5% revenue drag, now resolved: The Stellar project faced curtailment because a couple of transmission lines were completed only in late August / early September; from September-October onward, no curtailment is being seen, and CTU curtailment is now well absorbed by the battery.
- Technology milestone reached: The company commissioned roughly 51 units of the Envision E-182, a 5 MW turbine with 181-metre rotor diameter and 130-metre hub height, the largest by rotor diameter in India.
- Portfolio quality remains defensive: 86% of capacity is contracted with central agencies, 98% with A-rated or above off-takers, and 98% under 25-year PPAs, with DSO at 25 days for H1.
Margins & Profitability
- EBITDA margin expanded to 91.4% in Q2, with operating EBITDA margin at 90.7%, as higher operating income flowed through to the bottom line.
- Adjusted PAT turned positive at INR 54 crores in Q2 versus a loss of INR 18 crores a year ago, while cash PAT grew 3.9x YoY to INR 153 crores, reflecting operating leverage as the portfolio scales.
- Other income will normalise downward: Other income is primarily interest on surplus funds from the roughly INR 2,000 crores cash balance as of 30 September; as those funds are deployed into capex, other income will decline.
Balance Sheet & Capital Structure
- Credit profile strengthened materially: ICRA upgraded the corporate rating to AA- stable, seven project-level ratings were upgraded, and three SPVs now sit at the AA category, all of which support a lower cost of debt on refinancing.
- Refinancing locked in at cheaper rates: More than INR 2,500 crores was refinanced across five projects in FY27 so far at a weighted average interest rate below 8% p.a., bringing the operational portfolio's weighted average cost of debt down to 8.46% from 8.58% last quarter.
- Net worth rose post-IPO: INR 1,800 crores of primary IPO proceeds received in August 2026 pushed net worth to INR 5,200 crores, and net debt to net worth improved to 2.22x.
BESS Strategy & Market Dynamics
- Standalone BESS arbitrage is delivering, and the supply gap is persisting: Strong BESS performance this year has been driven by merchant arbitrage, and management expects it to continue because the standalone BESS capacity that was supposed to come online under bidding has not materialised, largely due to ultra-aggressive tariffs bid by players without much electricity-sector experience.
- Short-term merchant, long-term FDRE: The strategy is to place batteries into short-term tenders (monthly, three-month, six-to-nine-month) for the near term; beyond a couple of years, every battery will have a long-term solution under FDRE contracts.
- Battery pricing is softening modestly: Lithium carbonate prices have retreated from a spike of 170,000 yuan per ton to around 100,000, and China removed a 6% export incentive from January onward; the net effect is a 1–2% softening on battery prices, with numbers that were around 68–70 now likely at 66–68.
- Installation targets are ambitious: The company plans to install close to 4.5 GWh of BESS by June 2027 and 10 GWh by March 2028, with power demand growing at over 10% in H1 and peak evening-hour pressure on the grid making storage a structural need.
Malik: "Power demand across the country has stayed strong this year with a 10.2% growth for H1. With peak demand continuing to rise and the evening peak hours in particular putting real pressure on the grid, we see battery storage as part of the solution here."
Project Pipeline & Commissioning
- FY27 commissioning on track: Full-year guidance is 2 GWp of generation capacity and 1.7 GWh of BESS; over 1 GWp and roughly 500 MWh were already commissioned in the first seven months.
- Juniper Green Beta transmission risk is manageable: Close to half of the 1,300 MWh merchant battery should be operational by March 2027, and even if there is a slippage of a couple of months, management is very confident there will be no curtailment because the partial capacity can cover it.
- FY28 capacity confidence rests on already-delayed transmission: Transmission dates for FY28 projects are not beyond June 2027 as of now, already six to nine months delayed from their original schedule; management is pretty confident FY28 capacity will come online, noting that STU capacity has not been hampered by transmission delays and helped growth in the current H1.
- 4 GW of LOAs are approaching PPA signings: Of the 4 GW of LOAs excluding the thermal mimic tender, more than 1 to 1.3 GW peak of capacity with further batteries is expected to be contracted pretty soon, with PSA and PPA signing expected over the next one to one-and-a-half months.
Malik: "I'll not give you green shoots, but the fact is that if you look at projects which are there for FY28 commissioning, you will actually see those transmission elements, the original date being at least 1 year earlier. ... So, we believe, I think we're pretty confident that the FY28 capacity would come online."
Thermal Mimic & Bidding Strategy
- Thermal mimic tender won: The company won a tender with 230 MW contract capacity, comprising 530 MW solar (close to 790 MW DC), 75 MW wind, and close to 2.2 GWh of batteries, delivering dispatchable energy on a 15-minute basis.
- DISCOM interest is high but PPA signings are taking time: SECI has indicated significant DISCOM interest, but the PPA is very different in terms of delivery, and DISCOMs are taking more time to understand what they are getting; management is very confident that what it is delivering on a 15-minute basis is better than anything currently available.
- Thermal mimic tenders expected to continue regularly: The format offers the lowest cost, dispatchable energy all round, 75–80% CUF post-waiver of transmission charges, and transmission charges that are much lower or comparable to conventional power, making it a recurring opportunity.
- Bidding discipline is explicit: The company will participate in tenders that include batteries but will not participate where tariffs are ultra-aggressive, citing a recent Rajasthan solar park tender with many foreign utilities bidding very low; on standalone batteries, it is waiting for numbers to correct to sustainable levels.
- Return thresholds guide new bids: Mid-to-high teens for new bids, with FDREs bid in 2023–24 close to 20%, hybrids in the high teens, and thermal mimic in the mid-to-high teen range.
Malik: "I think what they are right now, what we have been told by SECI is there are a lot of guys who are -- a lot of DISCOMs who are interested ... So because it's a PPA which is very, very different in terms of delivery and other things, probably DISCOMs are taking more time to just to understand what they're getting."
Module & Equipment Pricing
- Non-DCR modules are cheap: Available at INR 12 or lower, providing a favourable cost environment for non-domestic-content projects.
- DCR module prices are higher but expected to converge: A recent SECI procurement bid came in around INR 18; management expects INR 18 or below for larger utility projects in a year or so, with further declines a couple of years later.
- Renewable bidding expected to pick up on FDRE concepts: Significant tendering will be needed to manage night-time power given that new thermal capacity is still pretty far out, supporting a structural pipeline for hybrid and storage-linked projects.
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| FY27 commissioning | 2 GWp generation + 1.7 GWh BESS | FY27 full year |
| BESS installation | Close to 4.5 GWh operational | By June 2027 |
| BESS installation | 10 GWh operational | By March 2028 |
| Juniper Green Beta | Close to half of 1,300 MWh merchant battery operational | By March 2027 |
| LOA conversion | PSA and PPA signing for >1–1.3 GWp of capacity with further batteries | Next 1–1.5 months |
| Juniper Green Stellar transmission | Fatehgarh 3 Bhadla 3 line completed (constructed by Apraava) | December |
| DCR module price expectation | INR 18 or below for larger utility projects | In a year or so |
| Return threshold for new bids | Mid-to-high teens | Ongoing |
Key Metrics
| Metric | Q2 FY27 |
|---|---|
| Total income | ₹372 cr, 2.3x YoY and up 15% QoQ |
| EBITDA | ₹340 cr, 2.6x YoY and up 15% QoQ |
| EBITDA margin | 91.4%, expanded from Q2 FY26 |
| Operating income | ₹345 cr, up 2.4x YoY |
| Operating EBITDA | ₹313 cr, up 2.7x YoY at a margin of 90.7% |
| Profit after tax (adjusted) | ₹54 cr, versus loss of ₹18 cr in Q2 FY26 and ₹53 cr in Q1 FY27 |
| Cash PAT (adjusted PAT + depreciation) | ₹153 cr, 3.9x the ₹40 cr in Q2 FY26 |
| Generation | 113 cr units, up 127% YoY |
| Fleet-wide CUF | 27%, versus 21% in Q2 FY26 |
| Wind portfolio weighted average CUF | 50%, up from 41.3% a year ago |
| Capacity commissioned during the quarter | ~316 MWp of renewable capacity and ~100 MWh of BESS |
| Capex incurred during the quarter | ~₹2,600 cr, taking H1 FY27 capex to ₹3,800 cr |
| Gross block | ₹12,250 cr as of Sep 30, 2026 |
| Total debt outstanding | ₹13,700 cr as of Sep 30, 2026; net debt ₹11,600 cr |
| Net debt to net worth | 2.22x, improved following IPO |
| Weighted average cost of debt (operational portfolio) | 8.46% p.a., down from 8.58% last quarter |
| EBITDA run rate (commissioned capacity of 2.8 GW) | ₹1,900 cr |
| EBITDA run rate expected for March '27 capacity (~3.9 GWp) | ₹2,750 cr |
| Curtailment | ~2.5% of overall revenue, largely resolved by Sep–Oct |
| Days receivable outstanding | 25 days for H1 FY27 |