Key Takeaways
- North launch dominates the P&L: First full quarter of North operations added volume but produced a ₹40 crore operating loss, including ₹33 crore of planned marketing spend; management expects breakeven in September.
- Core business is solid, not spectacular: Excluding North, operating EBITDA rose 4% YoY to ₹336 crore (₹979 per ton), with cement realization up 6% QoQ to ₹4,951 per ton.
- GGBS guidance cut: Muted 2.6% YoY growth in Q1 forced management to revise FY27 GGBS growth down from mid-teens to high single-digits.
- Fuel costs are the margin swing factor: Blended fuel cost jumped to ₹1.80 per Mcal from ₹1.49; management expects Q2 flat with Q1, then relief from Q3 as domestic coal and lignite ramp up.
- What to watch next quarter: Whether North actually breaks even in September, the pace of Nagaur cost reduction as OLBC and alternate fuel systems commission, and whether GGBS volumes recover in Q2 as promised.
North Region: The Quarter's Defining Story
- First full quarter: North operations contributed meaningfully to the 15% YoY total volume growth, with cement volumes up 27% YoY including North. Excluding North, cement volume growth was 8% YoY.
- Utilization ramping: North region averaged 55% utilization in Q1, reaching almost 68% in June 2026. Management expects 60%+ utilization by year-end.
- The loss: North operations posted an operating loss of ₹40 crore in Q1, of which ₹33 crore was marketing investment around the launch campaign, Khel Mahotsav (10,000 villages, 10,000 teams in Rajasthan), Dangal in Haryana, and ground-level activation. The spend was planned in the business plan.
- Breakeven economics are temporarily inflated: Breakeven at 55-60% utilization is higher than it would otherwise be because limestone currently moves by road and WHRS is not yet operational; with those in place, breakeven would be at much lower levels.
- Cost reduction levers now commissioning: OLBC, alternate fuel handling, and WHRS (already commissioned) at Nagaur are expected to bring clinker costs down in Q2, alongside rotation toward domestic coal and increased lignite.
Narinder Singh: "By the end of September, or I can say in September is when we break even, and then we go in the positive territory."
Core Operations & Regional Performance
- Realization strength: Cement realization rose 6% QoQ to ₹4,951 per ton, with the highest increase in East, followed by South and West.
- GGBS realization is mix, not strategy: GGBS realization increased 3.4% QoQ to ₹3,807 per ton, which management attributes to geographic mix (dispersion effect), not a change in pricing strategy.
- GGBS volume weakness: Growth was muted at 2.6% YoY because of RMC closures in the West, aggregate availability issues in the South, low OPC/slag mix cost making GGBS unviable, and labor migration from operating geographies due to elections. Growth received was primarily in the West; South was impacted.
- Industry outperformance: Excluding North, industry growth was around 6% while JSW Cement did 8%. East and West performed significantly better than industry; South had headwinds due to topical reasons.
- Fujairah contribution: PBT included a positive contribution of about ₹13 crore from Fujairah operations.
- Demand timing: April and early May demand was affected by labor migration and state elections, but a strong rebound was seen in June.
Nilesh Narwekar: "Honestly, it's strongly correlated with the capex spend and the infra growth. And if that continues to incessantly be there and I think the investment that we've currently made in this specifically in quarter one in terms of getting approvals and getting these large infra projects all listed and registered, as a company we see very positive outlook going forward, which will play out not only in this year, which is FY '27, also in FY '28 onwards."
Costs & Margins
- EBITDA declined despite better realizations: Consolidated operating EBITDA fell 7.5% YoY because of cost pressures in fuel and packing, plus the ₹33 crore North marketing investment.
- Fuel cost spike: Raw material and power and fuel costs increased QoQ primarily due to higher fuel cost and the impact of Nagaur operations. Blended fuel cost rose to ₹1.80 per Mcal from ₹1.49 per Mcal.
- Fuel strategy shift: Company is switching to domestic coal and has already started buying it. No escalation expected beyond Q1 levels; Q2 expected to be almost same as Q1, with costs coming down from Q3 onwards.
- Logistics improvement: Logistic cost per ton reduced 2% QoQ due to a slight reduction in lead of 4 km and efficiency measures.
- Other expenses: Increased 4.5% QoQ in absolute terms, largely related to North marketing investment and higher packing cost.
- Other income anomaly: A ₹55 crore component in other income arose because JSW One (a JV) did a recent fund raise, moving its net worth into positive zone; this is the share of that net worth as per accounting standards. Earlier, JSW One losses had required writing down the entire investment over different quarters.
Nilesh Narwekar: "The real kicker for us that's going to happen now in terms of costs is once the clinker costs start to come down with the commencement of the OLBC, the alternate fuel, the waste heat recovery kicking in, the move from imported coal to lignite."
Capacity Expansion & Capex
- Long-term ambition: Intention to move from 2.41 crore tons current capacity to about 4.35 crore tons over the next few years, requiring about ₹7,500-7,600 crores capex.
- FY27 capex: About ₹2,300 crores; FY28 about ₹2,000 crores; balance in following years. Management is confident there will be no miss on the FY27 number.
- Nagaur grinding addition: Additional 0.1 crore ton grinding capacity in Nagaur on track, expected to be commissioned by end of Q2.
- Rajasthan capacity: Full-year expectation of 60%+ capacity utilization; capacity rising from 0.25 crore to 0.35 crore in September end/early October. Additional 2.5 MTPA line expected by end of FY28.
- Punjab status: Awaiting environmental clearance; a couple of rounds of discussion/hearing have happened in PCB. Most of plant land is with company; only approach road parcel remains to be purchased, which will be done very soon. Punjab is included in the capex numbers mentioned.
- Vijayanagar Phase 1 delay: Pushed beyond CY28; intent was to be prudent about maintaining overall company capacity utilization.
- Fujairah timeline: Up and running within 12 months from groundbreaking (July 2026).
- Dolvi timeline: Work starting very soon; 15 months from start.
- Net debt discipline: Internal guidance from board is to keep net debt to EBITDA below 3.0x.
Narinder Singh: "We will sequence them and maybe in a couple of months we will be in a better position to take that decision. But yes, the plan, the long-term plans are we finish off with the 4.3 crore first and then go for the balance 2.5 crore maybe in the next three-four years following the completion of 4.3 crore."
RMC & Downstream Strategy
- Aggressive scaling: Currently 15 RMC plants, adding 35 more, scattered across geographies including North, West, South, and East, mirroring cement operations and JSW group captive expansion.
- North entry: Operations have already started in the North, consistent with the symbiotic approach of setting up RMC wherever cement operations exist.
- Revenue target: Targeting north of ₹1,000 crores revenue this year including captive.
- Margin reality: Difficult to spell out margins now; captive has different economics than commercial/dedicated; in first 12 months of a new plant, RMC doesn't make money.
- Strategic logic: RMC business approach is symbiotic with footprint; set up RMC plants wherever company can supply cement and/or cementitious (GGBS); setup is largely commercial, dedicated, or captive (captive for JSW use).
Demand Environment & Project Pipeline
- Infra demand outlook: Very strong demand outlook on infra and large project side for rest of year, supporting non-trade cement and GGBS business.
- Project approvals: Received approvals for over 29 large infra projects in Q1.
- Key projects: Bullet train Maharashtra packages and Western Coastal Road project at Mumbai expected to gather pace post monsoons; Pune Ring Road project and new elevated road packages; new metro projects planned in Pune; Amaravati new capital development project gaining speed; NPCIL nuclear power plant expansion in North Karnataka; large road packages in Chennai and Kerala expected to generate substantial demand.
- Residential demand: Strong residential activity in Pune, Hyderabad, and Bangalore; substantial residential redevelopment in Mumbai and suburbs.
- Green energy progress: Added 56 MW of wind capacity in Q1 at Dolvi and Vijayanagar, taking RE share to 30%. Can hit 60%+ by end of FY27, implemented from Q3 onwards. Land issues for green energy are resolved; full capacities previously informed will be available in September.
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| North breakeven | Operating breakeven in North operations | September 2026 |
| North utilization | 60%+ capacity utilization | End of FY27 |
| Overall volume growth | High teens growth on overall company basis including North and GGBS | FY27 |
| GGBS growth | High single-digits growth (revised down from mid-teens) | FY27 |
| Fuel cost | Q2 flat with Q1; costs come down | Q3 FY27 onwards |
| Nagaur grinding capacity | Additional 0.1 crore ton commissioned | End of Q2 FY27 |
| Rajasthan capacity | 0.25 crore to 0.35 crore tons | September end/early October 2026 |
| Rajasthan additional line | 2.5 MTPA line | End of FY28 |
| Fujairah expansion | Up and running | Within 12 months from July 2026 groundbreaking |
| Dolvi expansion | Operational | 15 months from start (work starting very soon) |
| FY27 capex | Close to ₹2,300 crores, no miss expected | FY27 |
| Net debt to EBITDA | Below 3.0x | Ongoing board guidance |
| Green energy share | 60%+ | End of FY27 |
| RMC revenue | North of ₹1,000 crores including captive | FY27 |
| Marketing spend | ₹130 crores company-level | FY27 |
| North incentive recognition | Eligibility certificate expected | Within two months |
| Central/Northeast/North sequencing decision | Decision on expansion priority | In a couple of months |
Key Metrics
| Metric | Q1 FY27 |
|---|---|
| Consolidated revenue | ₹1,896 crores, +22% YoY and flat QoQ |
| Consolidated operating EBITDA | ₹299 crores, -7.5% YoY |
| Operating EBITDA per ton | ₹784 per ton |
| Operating EBITDA excluding North operations | ₹336 crores, +4% YoY; ₹979 per ton |
| Total EBITDA including other income | ₹372 crores |
| PBT | ₹190 crores, including positive contribution of about ₹13 crores from Fujairah operations |
| PAT | ₹153 crores |
| Total sales volume | 0.38 crore tons, +15% YoY |
| Cement volumes sold | 0.23 crore tons, +27% YoY; +8% YoY excluding North operations |
| GGBS volume growth | 2.6% YoY |
| Cement realization | ₹4,951 per ton, +6% QoQ |
| GGBS realization | ₹3,807 per ton, +3.4% QoQ |
| Blended fuel cost | ₹1.80 per Mcal, up from ₹1.49 per Mcal in Q4 FY26 |
| Logistic cost per ton | -2% QoQ, with lead reduction of 4 kilometers |
| Net debt | ₹3,856 crores at end of June |
| Net debt to EBITDA | 2.95x |
| Average cost of debt | 7.63%, stable QoQ |
| Capex incurred during quarter | ₹337 crores |
| North region average utilization | 55% in Q1; almost 68% in June 2026 |
| North operations operating loss | ₹40 crores, including about ₹33 crores marketing investment |
| Overall cement capacity utilization | 61% for Q1 |
| Clinker utilization | 61% including Nagaur; 87% excluding Nagaur |
| RE share | 30% in Q1, after adding 56 MW of wind capacity at Dolvi and Vijayanagar |
| RMC revenue | ₹180 crores in Q1 |
| Trade mix within cement | 51%, stable |
| Clinker to cement factor | 55%, increased with launch of North operations |
| Central capex growth | 24% YoY |
| FY27 capex budget utilized in Q1 | 28% |
| Approvals received for large infra projects | 29+ in Q1 |
| Other incentives booked during quarter | Slightly less than ₹6 crores |
| JSW One deconsolidation component in other income | ₹55 crores |