- Volume surge, mix masks pricing: Total volumes grew 26% Y-o-Y, among the highest in the industry, but a geographic mix shift toward the lower-priced East market drove a 3% Q-o-Q realization decline, not aggressive price cuts.
- North nears self-sufficiency: Nagaur achieved EBITDA breakeven with a small positive contribution, utilization hit 75%, and costs are set to fall INR550–600/ton as WHRS, AFR and the overland belt conveyor come online.
- Expansion capex is loading the balance sheet: Net debt rose on continued North capex, land acquisitions and IPO cash drawdown; management expects net debt/EBITDA to stay around 3x for another year or so before declining.
- Fuel cost headwind is priced in, not panicked over: Blended fuel cost will rise from INR1.84 to INR2.10/MCal (~INR90/ton), but management expects green power share rising past 50% and H2 price increases to hold margins.
- What to watch next quarter: Whether the October price increases stick across all regions, the pace of Nagaur’s cost reduction, and any demand signal from the US election outcome on fuel prices.
Volume Growth & Geographic Mix
- Cement volumes exploded, GGBS steady: Cement volumes grew ~40% Y-o-Y (13% ex-North), while GGBS volumes improved from 2.3% in Q1 to 7% Y-o-Y in Q2, supported by infrastructure and RMC demand.
- East pulled the average down: East volumes grew ~20% Y-o-Y versus ~13% in the South, and because East pricing was under pressure, the mix shift alone drove the 3% Q-o-Q realization decline. Management explicitly stated no aggressive price cuts were taken.
- October demand running healthy: Early Q3 volumes are fairly positive across both GGBS and cement in all regions; Maharashtra is not seeing drought impact, and Karnataka/Andhra catchment areas are also holding up for now.
- Full-year cement volume call: Management guided high-teens volume growth over last year, implying confidence the H1 momentum carries through.
Narwekar: "We have not taken any aggressive price cuts if that's what you were alluding to because of which the volume increase has happened. That's not what has led to it. In terms of price, we maintain ourselves as what we were in quarter 1 as well. And it's primarily the geographic spread, which has led to the kind of numbers that we're looking at."
North Operations: The Turnaround Story
- Nagaur hit EBITDA breakeven: The unit delivered a ~INR3 crores profit in Q2, up from losses, despite clinker line underutilization (running ~0.22–0.23 crore tonnes against 0.33 crore tonnes capacity).
- Cost reduction levers now operational: WHRS, AFR co-processing and the overland belt conveyor were all commissioned in Q2 or early October, together expected to cut costs by INR550–600 per ton.
- Grinding capacity just expanded: An additional 1 MTPA grinding unit was commissioned at Nagaur in early October, taking total grinding to 0.35 crore tonnes, which should lift utilization from Q2’s ~5.8 lakh tonnes.
- Trade share push underway: North trade share is ~53% now, targeting close to 60% by year-end, with no extraordinary marketing spend planned; a Q4 push may be considered.
- Clinker sales a necessary bridge: The Nagaur kiln will run at full capacity, forcing clinker sales at least until December 2027; Q2 saw ~0.01 crore tonnes of clinker sold from Nagaur.
- Q4 EBITDA target: Management expects North EBITDA to hit around INR650–700/ton in Q4 FY27, with a much higher number (close to industry levels) once the next 0.25 crore tonnes of grinding is ready.
Costs, Fuel & Margin Resilience
- Raw material and power costs eased Q-o-Q: Raw material and power & fuel costs fell 2% Q-o-Q, with slightly higher fuel cost offset by product mix changes; employee and other expenses per ton were stable.
- Fuel cost step-up is coming: Blended fuel cost will move from INR1.84 to INR2.10/MCal in Q3, translating to ~INR90/ton higher cement cost.
- Green power is the offset: Green power share rose to 41% after 36 MW of wind capacity was added at Nandyal and Vijayanagar; management expects it to move past 50%, toward 55%, reducing power cost.
- AFR systems now fully geared: Alternate fuel systems are commissioned and running across all plants, which helps hold the blended fuel number despite the spot price move.
- Logistics cost held flat: Higher lead distances were offset by a railway busy-season surcharge waiver and volume reallocation between Vijayanagar and Dolvi plants.
- Margin call: the impact will be held: Management expects the fuel cost headwind to be absorbed by green power savings and H2 price increases, keeping margins broadly intact.
Narwekar: "We believe that the impact, primarily on margins, which is where I think you were taking this argument, would probably be held, and we'll be able to maintain that."
Pricing Strategy & Outlook
- September/October price increases seen: Price increases were marked in October, and with industry-wide cost pressure, management believes the targeted price table will hold.
- Trade prices lag non-trade: Non-trade price increases have begun to set in; management expects trade prices to follow and look healthier as the supply-side dynamic tightens.
- East remains the soft spot: Trade prices in regions other than East are yet to see increases, but the view is they should hold firm due to cost pressure across the industry.
- GGBS pricing deliberately held flat: No price hikes taken in GGBS; the strategy is to maintain the price point to drive penetration toward the 50% BIS-approved ceiling and potentially beyond for certain applications. If the arbitrage becomes significant, pricing may be revisited.
Narwekar: "And with the kind of cost pressures that the industry is facing, we believe the price table that we and that the industry is targeting will hold on."
Expansion Pipeline & Capex
- Three expansions announced: 2.5 MTPA at Nagaur (Q4 FY28 timeline), 2 MTPA at Dolvi (work starts January 2027, 20–21 months to completion), and Vijayanagar (starting December 2026, 1.5 years to commissioning) to capture additional slag from JSW Steel’s ramp-up at Vijayanagar from 1.8 to 2.4 crore tonnes.
- Dolvi land solution unlocked: JSW Steel cleared land at the existing Dolvi location, enabling a 0.2 crore tonne grinding unit on a lease rental/premium basis, supplementing the earlier plan to build across the creek next to PNP Jetty.
- Dolvi urgency tied to steel timeline: The initial 0.2 crore tonnes of GGBS capacity is being set up urgently because JSW Steel’s blast furnace is ready in calendar 2028; the balance 0.2 crore tonnes depends on land at PNP Jetty, which the company is still working on.
- GGBS expansion gated by utilization: Work on the next 0.2 crore tonnes at Dolvi will start only after utilization on the first 0.2 crore tonnes hits 65–70%.
- FY27 capex spend: Actual spend expected close to INR2,200–2,300 crores, with some payments potentially deferred to April.
- Debt discipline articulated: Management has a self-imposed mandate to keep net debt/EBITDA below 3x; it will stay around 3x for maybe a year or so more, then decline as new capacity starts generating cash.
Kahlon: "I do not want my debt to go up beyond a certain number. At the same time, I want to do my capex. So, there is a lag between when I spend and when I start generating cash from the investment."
GGBS & RMC: The Long-Game Bets
- GGBS volume guidance maintained: Full-year FY27 guidance is high-single-digit growth; with Q2’s 7% Y-o-Y momentum, management expects to meet that and hopes to improve. FY28 is also guided to high-single-digit, with a small slowdown before growth resumes when additional slag comes from Dolvi and Vijayanagar.
- GGBS penetration ambition: The stated goal is to drive GGBS to 50% of cementitious content (the BIS-approved limit) and potentially beyond for certain applications where standards permit.
- GGBS costs stable: No major cost pressure beyond a marginal increase in power/fuel for drying; procurement prices are flat year-on-year.
- RMC still in setup mode: Margins are minimal because units are just being established and volumes have not yet ramped enough to cover fixed costs. Management declined to provide full-year FY27 revenue guidance for RMC, saying operations are still being sorted out.
Narwekar: "We maintain our stance of continuing the price point so we guys can drive more penetration of GGBS across all the applications of concrete."
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Cement volume growth | High-teens Y-o-Y growth over FY26 | FY27 full year |
| GGBS volume growth | High-single-digit Y-o-Y | FY27 full year |
| GGBS volume growth | High-single-digit Y-o-Y (small slowdown) | FY28 full year |
| North EBITDA/ton | ~INR650–700 | Q4 FY27 |
| North EBITDA/ton | Close to industry numbers | After next 0.25 crore tonnes grinding ready |
| North trade share | Close to 60% (from ~53% currently) | End of FY27 |
| Nagaur cost reduction | INR550–600/ton from WHRS, AFR, OLBC | As systems ramp through H2 FY27 |
| Green power share | 50%+ (toward 55%) | FY27 |
| Net debt/EBITDA | Below 3x | "Coming years" (around 3x for ~1 more year) |
| Nagaur clinker sales | Kiln at full, clinker sales necessary | At least until December 2027 |
| Dolvi grinding unit (0.2 crore tonnes) | Work starts January 2027, 20–21 months to completion | Commissioning ~Q3 FY29 |
| Nagaur expansion (2.5 MTPA) | Commissioning | Q4 FY28 |
| Vijayanagar expansion | Work starts December 2026, 1.5 years to commissioning | Commissioning ~Q2 FY29 |
| Rajasthan incentive recognition | Revenue recognition upon entitlement certificate receipt | Next meeting ~1 month; recognition follows |
| Trade payables reduction | Substantial drop expected | Q4 FY27 or Q1 FY28 |
Key Metrics
| Metric | Q2 FY27 |
|---|---|
| Consolidated revenue | ₹1,912 cr, up 33% YoY and 0.8% QoQ |
| Consolidated operating EBITDA | ₹278 cr, up 4% YoY |
| Consolidated operating EBITDA per ton | ₹708 |
| Total EBITDA (including other income) | ₹295 cr |
| Profit before tax | ₹101 cr, including nearly ₹20 cr positive contribution from JV |
| Profit after tax | ₹77 cr |
| Total volume | 0.39 crore tons, up 26% YoY |
| Cement volumes sold | 0.23 crore metric tons, up almost 40% YoY |
| Cement realization | ₹4,781 per ton, up 3% YoY, down 3% QoQ |
| GGBS volumes growth | 7% YoY |
| GGBS realization | ₹3,749 per ton |
| Trade mix | 52%, stable |
| Clinker-to-cement factor | 58%, increased with ramp-up of North operations |
| Lead distance | 294 km, increased by 9 km QoQ |
| Blended fuel cost | ₹1.84 per MCal, up from ₹1.80 in Q1; Q3 expected at ₹2.10 |
| Green power share | 41%, up after adding 36 MW wind capacity; expected to move above 50% |
| Net debt | ₹4,287 cr at end of September |
| Net debt to EBITDA | 3.2x |
| Average cost of debt | 7.67%, stable QoQ |
| Capex incurred (cash outgo) | ₹483 cr in Q2, ₹820 cr in H1; full-year spend expected close to ₹2,200–2,300 cr |
| North plant utilization | 75% during Q2 |
| North region EBITDA | ₹3 cr profit, achieving breakeven |
| RMC revenues | ₹170 cr |
| Employee cost | ₹100 cr, run rate expected to continue |