Key Takeaways
- Demand tailwinds strengthen the thesis: Power demand grew ~11.1% YoY, and management now sees its 5–6% long-term CAGR view as potentially conservative, underpinned by structural drivers like data centres and electric mobility.
- Execution engine delivers at scale: 1.7 GW of capacity added so far this fiscal, including the Maruti acquisition, putting the 3 GW FY27 target firmly on track and lifting installed capacity above 15.1 GW.
- Merchant strategy is paying off: Realisations hit ₹6.9/unit, a 20% premium to the day-ahead market, and Q3 is already fully booked at similar or better pricing.
- The balance sheet is strengthening: Net leverage fell to ~4.94x from ~5.2x, debt cost dropped ~51 bps to 8.28%, and ₹10,150 crore of capital was unlocked this calendar year.
- What to watch next quarter: The pace of curtailment reduction as temporary GNA converts to permanent, closure of the 2 GW group captive capacity under advanced discussion, and any movement on the minority stake buyout at KSK Mahanadi.
Demand & Market Backdrop
- Power demand surge: Q2 FY27 demand grew ~11.1% YoY, driven by a strong economy, industrialisation, urbanisation, rising per capita consumption, data centres, and electric mobility, with an additional boost from a ~13% below-normal monsoon keeping cooling demand high.
- Structural view turning conservative: Management's long-term power demand CAGR assumption of 5–6% now appears to be on the low side given the sustained strength of the last two quarters.
- Complementary, not competing: Management framed renewables and thermal as complementary: renewables deliver the cheapest energy, while thermal and storage ensure dispatchable power through the evening peak.
- Energy security as a strategic necessity: The call positioned secure, domestically sourced, dispatchable power backed by a domestic manufacturing base as no longer optional for India.
Sharad Mahendra: "If I were to sum up this quarter in one line, it would be this: the market is moving towards exactly what we have been building."
Operational Performance
- Hydro outperformance: Generation rose 13% YoY to 342.1 crore units against an All-India hydro decline of ~15%, helped by Sutlej/Ravi basin outperformance; Kutehr more than doubled generation to ~40.8 crore units at 78% PLF in its first full monsoon, and Tidong, commissioned ahead of schedule, generated 199 MUs at 61% PLF.
- Thermal strength: Generation up 13% YoY to 890 crore units with consolidated PLF of 75% versus All-India 67.8%; Mahanadi ran at 90% PLF and Utkal at 82% PLF.
- Utkal turnaround: EBITDA more than tripled YoY to ₹368 crore, driven by better plant performance and PPA realisations well above day-ahead market prices, a sharp contrast to the prior year when power was sold into the merchant market; Q1 operational issues that limited merchant sales were resolved in Q2, enabling improved financials through merchant sales alongside fixed cost recovery under the Karnataka PPA.
- Renewables generation: Wind output up 25% YoY and solar up 36% YoY, supported by ~1.5 GW of YoY capacity increase; wind PLF of 46% beat the All-India average of ~37%, while solar PLF of 19% was roughly in line with the national ~18%.
- Curtailment contained: Portfolio curtailment was ~4.8% in H1, below the national average of ~5.4%; Q2 saw ~225 MUs curtailed with a ₹59 crore revenue impact, and ~60% of the curtailed capacity on temporary GNA is expected to move to permanent GNA by the end of Q3 FY27, materially reducing exposure.
- Merchant realisation and visibility: Q2 merchant realisation stood at ₹6.9/KWh, a ~20% premium to the day-ahead market average of ₹5.7/unit, driven by strategic bilateral contracts; 1.1 BUs were sold in the merchant market during Q2, representing ~7% of total energy sold and ~4% of total capacity, all from thermal assets; Q3 is fully booked at similar or slightly better pricing, and Q4 discussions are ongoing.
Sharad Mahendra: "Renewables and thermal are not competing; they are complementary. Renewables deliver the cheapest energy, while thermal and storage keep the lights on through the evening peak."
Capacity Addition & Project Pipeline
- FY27 commissioning on track: 1.4 GW of organic RE commissioned since April, with Q2 adding 513 MW (301 MW solar, 212 MW hybrid); total additions including the 300 MW Maruti thermal acquisition stand at 1.7 GW, taking installed capacity above 15.1 GW; the remaining 1.6 GW toward the 3 GW FY27 target is fully secured on land, transmission, equipment, and PPAs.
- Maruti acquisition: Completed August 6 at an enterprise value of ₹1,410 crore; the plant has ~195 MW under a long-term PPA with Rajasthan discoms and ~64 MW of merchant capacity; it generated ~₹45 crore of EBITDA in 55 days and was EBITDA- and PAT-accretive from day one, also lowering net leverage.
- KSK Mahanadi expansion: The 600 MW fourth unit is on track for FY28, with the balance 1,200 MW expected by FY29; management is confident in the 3-year commissioning timeline because balance-of-plant infrastructure for 3.6 GW (coal handling, ash handling, railway, transmission) is already in place, and capex per MW is expected to be at least 25–30% below the industry benchmark.
- Salboni thermal: Phase I site work is progressing well, with the first unit expected by 2030; the boiler order for the entire project has been placed with the Durgapur facility, which is part of the GE Power India acquisition that received NCLT sanction on October 1st, and Phase II turbines were ordered from Toshiba JSW in September.
- 30 GW by 2030 visibility: The locked-in pipeline gives a clear line of sight to the 30 GW target, and the growth runway extends beyond 2030; four pillars for the post-2030 period were identified: C&I, group captive, hydro pump storage, and thermal.
- Annual RE addition sacrosanct: The plan to add 2.5–3 GW of RE every year is described as sacrosanct, with no obstacle or hurdle expected; additions are structured across three insulated categories: off-grid/group captive (insulated from grid curtailment), utility-scale with secured connectivity, and projects where land and connectivity are being proactively secured.
Sharad Mahendra: "So keeping that thing in mind, we are absolutely certain that there will be no obstacle or hurdle in achieving our annual plan of whatever, 2.5 GW to 3 GW capacity addition every year, wherein wherever required, battery energy storage is going to be to play a major role. So that capacity addition is sacrosanct. It is going to be there."
Commercial & Industrial (C&I) and Group Captive Strategy
- C&I portfolio growth ambition: The C&I portfolio is expected to grow from 3.7 GW to over 8.5 GW by 2030, with Group companies contributing a large share; C&I third-party is a focus area because of energy transition tailwinds, RPO obligations, and attractive pricing and returns, with commissioning for customers including Amazon expected in H2 FY27.
- Group captive demand doubling: The Group's round-the-clock power requirement is expected to more than double to ~7 GW by 2032 as JSW Steel expands to up to 80 MTPA and other Group businesses scale; of the 6.2 GW of MoUs signed in Q2 FY24, 4.5 GW is yet to be tied up, and 2 GW of group captive capacity is under advanced discussion and expected to close soon.
- BESS for evening peak: Battery energy storage will play a key role in the strategy, with solar coupled with BESS enabling evening peak sales using existing solar connectivity for evening discharge; BESS investments will be over and above the 3.2 GWh already planned, and the company will definitely participate in the evening peak opportunity.
- Differentiated BESS approach: Management contrasted its approach with peers who have commissioned large BESS capacity without a PPA in sight, characterising that as invested capital not giving desired returns; JSW's strategy is to deploy BESS specifically to capture evening peak prices being discovered in the market.
Financials & Balance Sheet
- Top-line and profitability: Revenue rose 24% YoY to ₹6,658 crore, EBITDA grew 23% YoY to ₹3,907 crore, and PAT jumped 38% YoY to ₹1,141 crore, with PAT attributable to shareholders up 50% YoY to ₹1,056 crore, all backed by robust capacity addition and healthy plant performance.
- KSK Mahanadi EBITDA run rate: The ₹650 crore run rate reflects post-tariff-adjustment levels and includes ~100–115 MW sold in the merchant market; management considers this a reasonable base run rate.
- Debt cost and interest rate insulation: The cost of debt fell ~51 bps to 8.28% from ~8.79% a year back; the debt book is well insulated because ~25% of term debt is at fixed rates and ~90% of the floating portion is linked to MCLR, which tends to lag Repo increases; even if the RBI hikes 75 bps, management expects transmission of only ~40 bps, taking the rate to ~8.58%, and is working with banks to refinance with a target of not more than 8.50%.
- Net leverage improving: Net Debt to TTM EBITDA (excluding CWIP debt) stood at ~4.94x, down from ~5.2x in FY26.
- Capital unlocking and fundraising: ₹10,150 crore was delivered in this calendar year, and fundraising plus steel shares monetisation added ₹7,150 crore to equity funding.
- Project IRR discipline: New projects use a conservative assumption of a 9% interest rate for the full 25-year project life; management reiterated that all projects must meet a minimum mid-teen IRR threshold, and no impact is seen on ongoing projects even if rates rise from 8.28% to 8.50%.
C. Prabhakaran: "So, overall, I think what I was kind of referring to was even though the repo kind of decreased in the last 1 year to close to 100 bps, the actual transmission was not more than about 50 bps. So I think similarly, if you look at it, even assuming that, say, for example, another 75 happens, we are kind of foreseeing that basically not more than, say, 40 bps kind of should kind of translate."
Strategic Moves & New Opportunities
- GE Power India boiler business: NCLT sanction was received on October 1st, and the transaction is expected to close soon; the Salboni boiler order has already been placed with the Durgapur facility that is the acquisition target, demonstrating vertical integration intent.
- Toshiba JSW stake increase: Stake was raised to 10.7% in July, and Salboni Phase II turbines were ordered from Toshiba JSW in September.
- Bhutan hydro entry: An agreement was signed with the Bhutan government for a 920 MW hydro project; a joint venture company is being finalised and DPR work is ongoing, with details on project cost and timelines expected by June 27 after DPR finalisation.
- West Bengal PPA: A 3.2 GW PPA was signed with the state of West Bengal for the greenfield plant at Salboni; Phase I (800 MW) is included in the 30 GW plan, while the balance 2.4 GW sits beyond the 30 GW target.
- Credit rating affirmation: ICRA and India Ratings affirmed the long-term rating at AA with a Stable outlook.
- Backward integration in wind: The Halol wind blade facility has been producing blades for wind projects since commissioning in June, and the Chitradurga wind blade facility is on track for completion in Q3 FY27.
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| FY27 RE commissioning | 3 GW total; 1.4 GW done, remaining 1.6 GW fully secured | FY27 |
| FY27 capex | ~₹20,000 crore | FY27 |
| Energy storage commissioning | ~1 GWh of projects | FY27 |
| Curtailment reduction | ~60% of curtailed capacity on temporary GNA to move to permanent GNA | End of Q3 FY27 |
| KSK Mahanadi Unit 4 | 600 MW commissioned | FY28 |
| KSK Mahanadi expansion balance | 1,200 MW commissioned | FY29 |
| Annual RE capacity addition | 2.5–3 GW every year | Ongoing |
| Salboni Phase I first unit | First unit operational | By 2030 |
| 30 GW installed capacity | Locked-in pipeline gives clear line of sight | By 2030 |
| C&I portfolio growth | From 3.7 GW to over 8.5 GW | By 2030 |
| Group RTC power requirement | More than double to ~7 GW | By 2032 |
| Bhutan hydro project details | Project cost and timelines | By June 2027 (post DPR) |
| Debt cost ceiling | Not more than 8.50% even if RBI hikes 75 bps | Medium term |
| Project returns threshold | Minimum mid-teen IRRs on all projects | Ongoing |
Key Metrics
| Metric | Q2 FY27 |
|---|---|
| Revenue | ₹6,658 cr, up 24% YoY |
| EBITDA | ₹3,907 cr, up 23% YoY |
| EBITDA margin | 58.7% (per an analyst's math) |
| Profit After Tax | ₹1,141 cr, up 38% YoY |
| PAT attributable to shareholders | ₹1,056 cr, up 50% YoY |
| Depreciation | ₹943 cr, up 17% YoY |
| Finance costs | ₹1,615 cr, up 14% YoY |
| Net Debt to TTM EBITDA | 4.94x, down from ~5.2x in FY26, excluding CWIP debt |
| Debt cost | 8.28%, down ~51 bps from ~8.79% a year back |
| Cash and cash equivalents | ~₹15,700 cr |
| Net generation | 1,750 cr units, up 17% YoY |
| Installed capacity | Above 15.1 GW, renewables ~61% of portfolio |
| Capacity added since April | 1.7 GW, comprising 1.4 GW organic RE and 300 MW Maruti thermal acquisition |
| Thermal PLF (consolidated) | 75%, vs All-India thermal PLF of 67.8% |
| Hydro generation | 342.1 cr units, up 13% YoY |
| Wind PLF | 46%, vs All-India wind PLF of ~37% |
| Solar PLF | 19%, vs All-India solar PLF of ~18% |
| Merchant realisation | ₹6.9 per unit, ~20% above DAM average of ₹5.7 per unit; 1.1 BUs sold |
| Curtailment (H1 FY27) | ~4.8% of total generation, vs national level ~5.4%; Q2 revenue impact ₹59 cr |
| Utkal Plant EBITDA | ₹368 cr, more than tripled YoY |
| Maruti EBITDA contribution | ~₹45 cr in 55 days from acquisition on Aug 6 to quarter end |
| CO₂ emissions avoided (Q2) | ~0.84 crore tonnes |
| Credit rating | AA with Stable outlook, affirmed by ICRA and India Ratings |