Kirloskar Ferrous Industries Ltd Q1 FY2026 Concall Summary

Source transcript PDF: https://assets.stockscans.in/docs/hb3g8suc4bucgil1ll41dp92.pdf

Key Takeaways


Segment Performance

SegmentTrendCommentary
Casting▲ Volume up, price flat6% growth driven by tractors; all foundries at full capacity. Realization down only 1% YoY, so margin retention was strong. Oliver Foundry added ~1,000 tons/month.
Tubes▲▲ Volume up, price down32% volume growth from Ahmednagar and Baramati, but realization fell 9% overall (Baramati down 13%). High-value OCTG sales yet to begin.
Pig Iron▼ Price-led pressureRealization down 8% YoY, 38% over two years. Manufacturing improved to 0.85 crore tons, but Russian imports and no dumping restrictions are compressing margins. Iron ore prices remain sticky due to Bellary-Hospet shortages.
Steel▼ Production down, sales steadyMaintenance shutdown cut production, but sales continued from inventory. Realization down 6%. Expansion to 650,000 MT planned.

Casting: The Volume Inflection Bet

Gumaste: "It is not as easy as we thought in the beginning."

Tubes: Volume Running Ahead of Margin

Gumaste: "There has been continuous dumping of the Chinese seamless tubes. We have been taking up with the government, but I think actions are awaited."

Pig Iron & Steel: Commodity Pressure Absorbed

Gumaste: "In spite of this we have been able to maintain or manage the profitability and margins only because of various cost reduction projects we have taken, and we continue to work on those projects."

Capex & Strategic Projects


Guidance & Commitments

CommitmentSpecificsTimeline
Casting volume40,000+ tons sales in Q2; 170,000 tons for FY26Q2 FY26 / FY26
Casting run rate16,000–17,000 tons per month (200,000 tons per annum)"Very shortly"
Ford block ramp-up5,000 blocks per month, replacing 50% of current engine manufacturingNext six months
Solapur Phase-II5,000 tons per month from current 1,200 tonsNext three to six months
Tube volume200,000 metric tons of salesFY26
Tube EBITDA14% at 200,000-ton run rate; 15–16% with steel cost optimizationAt 200,000-ton run rate
Koppal steel bloom projectOperationalize 3.6 lakh MT per annum capacity2 to 2.5 years
Two-part foundryCommission first phaseWithin one year
Capex₹500–600 crore (FY26); ₹2,000–2,500 crore totalFY26 / next 3–4 years
Jambunatha mineComplete mining developmentWithin three years (conditional on approvals)
Incentive income₹15 croresFull year FY26

Key Metrics

MetricQ1 FY26
Revenue₹1,685 cr, +8.5% YoY
EBITDA₹214 cr, +14% YoY
PBT₹130 cr, vs ₹104 cr in Q1 FY25
PAT₹96 cr, vs ₹76 cr in Q1 FY25
Power and fuel cost6.1% of sales, vs 8.9% in Q1 FY25
Pig iron realizationdown 8% YoY
Casting realizationdown 1% YoY
Tube division realizationdown 9% YoY; Baramati tube down 13% YoY
Steel realizationdown 6% YoY
Casting sales volume growth+6% YoY
Tube sales volume growth+32% YoY (Ahmednagar and Baramati combined)
Pig iron sales volume growth+5% YoY overall
Steel and tube sales volume growth+42% YoY
Oliver Foundry sales~1,000 tons per month
Solapur Phase-II production1,200 tons per month; total Solapur at 4,200 tons per month
OCTG contribution to tube sales mix~20%
FY26 CAPEX plan₹500 cr to ₹600 cr
Expected full-year incentives₹15 cr