Key Takeaways
- Pig iron margins collapsed, casting held firm: Pig iron EBITDA contribution fell to ~₹3,000/ton from ₹10,000, with management stating "we don't cover our costs" on pig iron currently. Casting margins stayed above 15% EBITDA, supported by a mix shift toward auto and tractor components.
- Volume growth offset price weakness: Tube sales volumes rose 24% YoY, and overall EBITDA grew from ₹195 cr to ₹214 cr QoQ despite commodity headwinds, driven by volume traction and cost management.
- Renewable energy pivot from solar to wind: A Maharashtra government policy capping solar at 52% of consumption forced a shift; the company now plans ~₹200 cr on wind mills (16.8 MW this year) and deferred a 30 MW solar project to next year.
- Steelmaking commitment signals structural shift: Management is moving to make steel from at least one Koppal blast furnace, aiming to reduce pig iron dependency within two years, while also approving ~₹100 cr to expand Oliver foundry capacity to 48,000 tons.
- What to watch next quarter: Whether pig iron prices actually bottomed as management hopes, the pace of Oliver and Solapur foundry ramp-ups, and any progress on the deferred Hiriyur blast furnace upgrade.
Pig Iron: Margin Stress & Cycle
- Demand-supply imbalance: More pig iron supply in the market despite casting and steel production growing, with no shortage of steel scrap creating additional competition. Many producers are making losses.
- Cost coverage failure: Pig iron contribution has collapsed from ₹10,000 to ~₹3,000 per ton because iron ore prices have not dropped much and coal prices only marginally declined, while pig iron prices fell very substantially. Management confirmed the business does not cover its costs currently.
- Hiriyur inefficiency adds drag: The Hiriyur blast furnace lacks PCI and is inefficient relative to the Koppal units. An upgrade requires ~₹125 cr investment, but management will not execute it in the current low-realization environment. A 40-day maintenance shutdown at Hiriyur caused production loss of ~21,000-22,000 tons.
- Recovery optimism without a timeline: Management hopes pricing has bottomed out and expects to recover 10%+ EBITDA on pig iron, but gave no specific price forecast or cycle-end date, acknowledging the psychological trap of cycles.
R.V. Gumaste: "When we are in the down cycle, we don't see up cycle at all. When we are on up cycle, we definitely forget the down cycle. It's human nature."
Casting: Margin Resilience & Volume Ramp
- Product mix shielded margins: Casting segment maintained EBITDA margins above 15% despite the commodity downturn, driven by a favorable mix shift toward high-value castings for auto and tractor applications and new product development.
- Volume lagged industry growth: H1 casting volumes were negative YoY, partly because the tractor segment picked up only from May/June, extended monsoon affected equipment demand (down 6%), and some volume moved to Oliver (5,000 tons produced and sold, not yet consolidated in KFIL numbers).
- Oliver integration underway: Oliver foundry has started production and sales of close to 5,000 tons, expected to reach 15,000-16,000 tons. The board approved ~₹100 cr investment to expand Oliver capacity to 48,000 metric tons per annum, subject to environmental clearance. The entity is in the process of being merged with KFIL.
- Solapur ramp-up slow: Phase 2 of the Solapur foundry is commissioned but capacity utilization is slow due to teething issues. Line 1 is running at ~3,000 tons/month, Line 2 about to reach ~2,000 tons/month.
- Volume targets: Management expects to go very close to 170,000 tons this year and targets 2 lakh tons next year.
Tubes: Volume Surge, Margin Restoration Expected
- Strong volume, weaker realization: Tube sales grew 24% in volume but realization dropped 7%, so value growth was 18%. Volume traction was driven by winning tenders, including a recent order from ONGC.
- Seamless tubes scaling fast: The seamless tube facility is already at a 2 lakh metric ton annual run rate. Debottlenecking should add 10-12% next year, with a target of 3 lakh metric tons.
- Margin confidence: Management expressed confidence that tube margins will be restored in the coming days despite the commodity cycle, though it did not quantify the levers (operating leverage, product mix, backward integration) when asked.
- Volume trajectory: The company looks to reach close to 200,000 tons this year, with another 10% volume attempt next year before adding a bigger-size seamless tube manufacturing facility.
Power Costs & Renewable Energy Strategy
- Sequential power cost spike: Power cost rose by ~₹45 cr sequentially due to three factors: seasonal effect (monsoon clouds reducing solar generation), government power tariff changes, and higher production volumes, especially tube production up 33%.
- Solar-to-wind pivot forced by policy: A Maharashtra government policy change now caps solar at only 52% of power consumption, forcing a shift from solar to wind. The company plans ~₹200 cr investment in wind mills: 8 wind mills (16.8 MW) to be commissioned this year, 4 more (8.4 MW) next year.
- Solar project deferred: A 30 MW solar project has not yet started; connectivity permission was received with riders. Management expects it likely in the second or third quarter of next year and is working to see if something can be done earlier.
- Renewable energy trajectory: The company will keep adding renewable capacity for at least 2-3 years to reach 65% renewable power consumption. Wind mill benefits of ~₹40 cr are expected mainly next year, while total solar savings for FY26 are pegged at ₹70-80 cr.
R.V. Gumaste: "Two major changes, Sahil. One is the government of Maharashtra change in the time slots and a little bit setback on support for solar because now we have come to conclusion only 52% of the power consumption can be from solar. So we had to change our gear from solar to wind."
Steelmaking & Structural Shift
- Strategic pivot to reduce pig iron dependency: Management is moving fast to make steel from at least one Koppal blast furnace, a project that will take a couple of years. After two years, the company expects 3.5 lakh tons of pig iron to go into steelmaking.
- Hiriyur upgrade tied to steel project: The Hiriyur steel project will be upgraded so that despite one furnace going for steel, the company will continue to have 5 lakh tons of pig iron production.
- Mines operationalization: Management looks forward to operationalizing its mines to cut down costs, though no specific timeline was provided.
R.V. Gumaste: "It's a great idea to move on ourselves to high value-added product. We are very clear that we will make steel from at least one of the blast furnace and dependency on pig iron to be reduced."
Operational Efficiency & Cost Levers
- PCI and oxygen enrichment progressing: PCI injection is at 125 kg/ton of hot metal and oxygen enrichment is helping, but additional oxygen plant capacity is needed to reach 160-170 kg/ton.
- Hiriyur remains the efficiency gap: MBF 1 and 2 in Koppal are efficient, but Hiriyur lacks PCI and is inefficient. The ₹125 cr upgrade required is not being executed in the current low-realization environment; management will look for an opportunity time to execute.
- Maintenance impact: Baramati had routine maintenance of its heating furnace with slight production loss, but this should not majorly affect volumes.
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Casting volumes | Reach very close to 170,000 tons | FY26 |
| Casting volumes | Target 2 lakh tons | Next year (FY27) |
| Tube volumes | Reach close to 200,000 tons | FY26 |
| Tube volumes | Another 10% volume growth | Next year (FY27) |
| Seamless tube capacity | Add 10-12% via debottlenecking, target 3 lakh metric tons | Next year (FY27) |
| Oliver foundry capacity | Expand to 48,000 metric tons per annum (₹100 cr investment) | Over next 1 year, subject to environmental clearance |
| Wind mill commissioning | 8 wind mills (16.8 MW) commissioned | This year (FY26) |
| Wind mill commissioning | 4 more wind mills (8.4 MW) | Next year (FY27) |
| Steelmaking at Koppal | Make steel from at least one blast furnace, 3.5 lakh tons pig iron into steel | Within 2 years |
| Pig iron EBITDA recovery | Recover to 10%+ EBITDA on pig iron | No timeline given; conditional on price recovery |
| Renewable power share | Reach 65% renewable power consumption | Over next 2-3 years |
| Hiriyur blast furnace upgrade | ₹125 cr investment to add PCI and improve efficiency | Deferred; will execute when realization environment improves |
Key Metrics
| Metric | Q2 FY26 |
|---|---|
| Total sales | ₹1,736 cr, vs ₹1,683 cr last year Q2 |
| EBITDA | ₹214 cr, vs ₹195 cr last year Q2 |
| H1 EBITDA | ₹427 cr, vs ₹383 cr last year H1 |
| PBT | ₹126 cr, vs ₹115 cr last year Q2, growth of 9.4% |
| H1 PBT | ₹256 cr, vs ₹219 cr last year H1, 16.8% higher |
| Pig iron sales volume | 131,508 metric tons, 2% more than last year Q2; all 3 blast furnaces operated |
| Pig iron sales realization | ₹37,098 per metric ton, down 11% from ₹41,670 last year Q2 |
| Casting sales volume | 36,673 metric tons, slightly less than last year Q2 |
| Casting sales value | ₹456 cr, vs ₹458 cr last year Q2, drop of 0.3% |
| Casting sales realization | ₹124.466 per kg, vs ₹123.653 per kg last year Q2 |
| Tube sales volume | 49,588 tons, vs 39,866 tons last year Q2, growth of 24% |
| Tube sales value | ₹565 cr, vs ₹478 cr last year Q2, 18% growth |
| Tube sales realization | ₹104,690 per ton, down 7% from ₹112,440 last year Q2 |
| Steel sales value | ₹139 cr, vs ₹144 cr last year Q2, drop of close to 3% |
| Steel sales realization | ₹71,055 per ton, down from ₹76,362 last year Q2 |
| Hot metal production | 165,179 metric tons, of which 131,508 external sales, balance internal transfer for casting and steel |
| Power cost as % of sales | 8.5%, sequentially up by almost ₹45 cr in Q2 vs Q1 |
| Renewable power cost benefit (FY26 expected) | ₹70–80 cr total benefit for the year, vs ₹40 cr last year |
| Pig iron contribution margin | ~₹3,000 per ton, down from ~₹10,000 over last 2–3 years |
| Casting and tubes EBITDA margin | ~15–16% at operating level |
| Pig iron EBITDA margin | ~6–7%, positive but under pressure |
| Oliver foundry production | ~5,000 tons produced and sold in Q2, not included in KFIL casting sales |
| Oliver foundry run rate | ~1,850–1,900 tons per month, expected to reach 2,000+ shortly |
| Casting volume target FY26 | 160,000–170,000 tons (including Oliver), vs 132,000 tons last year |
| Tube volume target FY26 | ~200,000 tons, H1 volume at 98,049 tons, growth of 33% YoY |
| Wind mill capacity addition | 16.8 MW (8 mills) commissioning by end FY26, investment of ~₹200 cr; savings of ~₹40 cr mainly next year |
| Solar capacity addition | 25–30 MW planned, expected realization from mid-next year |
| Hiriyur maintenance shutdown impact | ~40 days stoppage, production loss of ~21,000–22,000 tons |
| PCI usage | 125 kg per ton of hot metal, scope to reach 160–170 kg with additional oxygen capacity |