Key Takeaways
- Volume growth met by realization pressure: Double-digit production growth across all segments was offset by falling realizations in pig iron, tubes and steel, pushing full-year EBITDA down to INR758 crores from INR868 crores.
- Cost-side levers are now live, not promised: PCI, oxygen enrichment, captive iron ore and 70 MW solar are all commissioned and delivering, with a further INR80 crores in solar benefit and INR40–45 crores from own ore expected this year.
- Tubes are the margin problem to fix: Segment EBITDA margins fell below 3% as the company chose to load mills with lower-margin line tubes rather than idle them; management insists a return to 15% EBITDA is possible and must happen quickly.
- A capex cycle is starting, not ending: Koppal steel furnace clearance is in hand, a 2-part foundry is being set up for high-value export castings, and FY26 capex is guided at INR500–600 crores for cost reduction and debottlenecking.
- What to watch next quarter: Whether tube realizations improve as oil & gas tenders arrive by July, the pace of Oliver foundry ramp-up toward 1,500 tons per month, and any quantification of post-tariff casting inquiry conversion.
Volume & Realization: The Quarter's Tension
- Production grew strongly: Pig iron output rose 14% YoY, castings 11%, tubes 22% and steel 15%, with all segments posting double-digit gains.
- Sales volumes followed: Pig iron sales up 13% QoQ and 22% for the full year; castings up 15% QoQ and 10% full year; tubes up 8% full year; steel up 52% QoQ and 5% full year.
- Realizations fell almost everywhere: Pig iron realization dropped 8% in Q4 and 6% for the full year; tubes fell 7% overall and 4% per ton; steel was marginally flat. Only castings held realization, supported by product mix.
- Value growth therefore lagged volume growth: Pig iron, steel and tubes all saw muted value growth because realization declines ate into the volume gains; casting value growth matched its 10% volume growth.
- EBITDA trajectory split: Full-year EBITDA fell to INR758 crores from INR868 crores on the realization and margin pressure, but Q4 EBITDA improved to INR199 crores from INR181 crores, helped by better pig iron margins and volumes.
Cost Structure: The Levers Now Delivering
- Power & fuel cost fell 190 bps: Reduced from 8.6% to 6.7% of revenue, with management aspiring to bring it further down to 4%.
- PCI and oxygen enrichment are commissioned: Pulverized coal injection is consuming ~5,000 tons and replacing coke; oxygen enrichment is running at full 3,000 Nm³/hr capacity. Carbon rate improved 60–70 kg to 535 kg, with potential for another 15–20 kg reduction.
- Captive iron ore benefit is scaling: Only 57,000 tons of own ore were consumed last year; this year 250,000 tons are expected, delivering INR40–45 crores in benefit. The ore cost reduction is INR700–800 per ton.
- Solar power benefit is phasing in: The 70 MW plant was fully commissioned in Q3/Q4 last year and is now delivering full benefit. Total solar benefit this year is expected at INR80 crores, roughly INR40 crores more than last year.
- Raw material cost lag works both ways: When coking coal prices fall, the company carries 3–3.5 months of inventory in order, ship, port and plant, so the benefit takes that long to flow through. Lower coal prices booked but not yet consumed will benefit Q1 and Q2 of the current year.
- 35 MW captive power generation is contributing roughly INR10 crores per month.
Gumaste: "I think we are quite competitive in our manufacturing cost setup. I think I only expect that some pickup on the steel overall is a requirement to support the pig iron prices."
Tubes: The Margin Recovery Bet
- Volumes are strong, margins are not: Tube PBIT margins fell below 3% despite strong volume growth, driven by product mix weighted toward lower-margin line tubes and Chinese import pressure on realizations.
- The deliberate trade-off: Management chose to load mills with line tubes rather than idle them, accepting lower per-ton realization to keep a positive contribution. The company calls this a conscious decision, not a structural margin reset.
- The path back to 15% EBITDA: Management insists restoration is possible and must happen quickly. Drivers include solar power (second phase of 55–60 MW in H2 this year), yield improvement, quality improvement, product mix improvement, oil & gas tenders, premium couplings, high-value exports and policy advocacy against Chinese imports.
- Oil & gas tender timing: Tender volumes got exhausted; the next tender is expected by July, with export oil & gas also supporting volumes.
- Premium couplings production has started: The company is already producing and supplying premium couplings, adding a higher-value product to the tube portfolio.
- Volume aspiration is 2 lakh tons: Management is confident but stops short of guaranteeing it, citing hardcore manufacturing challenges. The quarterly run rate target is close to 50,000 tons.
Gumaste: "It's better to load the mills than idle the mills. And that will affect the per ton realization, but it will keep the mill loaded and we get contribution positive."
Castings: The Bright Spot
- Realization held where others fell: Q4 casting realization of INR1,27,995 per ton was driven by product mix; tractor castings are less intricate and lower-priced, while auto and earthmoving equipment castings are more complicated and higher-cost.
- Realization outlook is stable: Expected to sustain in the INR125,000–126,000 range, with potential upside if the mix shifts toward more difficult castings.
- Demand is improving: Tractor industry demand improved seasonally, and loading is better across all foundries. Demand is running above 15,000 tons per month.
- Oliver foundry is ramping: After repairs, the foundry sold 600 tons in its first month, is targeting 700–750 tons next month, and aims for 1,500 tons per month in the next few months.
- Volume target is 1.6 lakh tons: Targeting close to 1.6 lakh metric tons for FY26, representing roughly 20% growth over FY25. Capacity utilization at that level would be 65% of 240,000 tons, which management calls achievable.
- Post-tariff opportunity is real but slow: The company is seeing increased inquiry and interest for castings from India following tariffs, and is working with customers. However, developing castings, machining, validation and running up engines takes time and cannot be changed overnight.
Gumaste: "Some of the customers wanted like yesterday. So it can't be. Unfortunately, developing the castings, machining, validation, running up the engines or whatever equipment, it takes time. It can't be changed overnight."
Growth Projects & Capex
- FY26 capex guided at INR500–600 crores: Spending is directed at cost reduction, productivity and production increases, and debottlenecking.
- Koppal steel furnace is advancing: MOEF clearance has been received; the company is waiting for state government consent to establish. Land development and civil work will start in FY26, with equipment orders already placed at 10–15–20% advance. Bigger capex outlays fall in years 2 and 3.
- Furnace strategy shift: The company has decided to convert one existing blast furnace into steel production rather than adding a fourth blast furnace, and will upgrade the Hiriyur blast furnace to match Koppal MBF 1 and 2 standards.
- 2-part foundry being set up: Based on existing customer needs, this foundry will supply large castings in the 25–250 kg range in machined condition: low volume, high value-added, better margins, and more oriented toward export.
- Renewable energy build-out continues: A 12.6 MW windmill is in installation and expected operational this year. 30 MW of solar is approved and expected to be commissioned this year. Phase 3 in Beed adds another 50 MW, though land acquisition is taking more time than expected. 35 MW of solar in Jalna is likely to close earlier than Beed.
- Tube capacity debottlenecking: Baramati and Ahmednagar debottlenecking is complete, enabling 2 lakh tons of tube production and sale. Additional machinery for retreatment, NDT, hydro testing and tube handling is being installed.
- Liquid metal production target: The company is attempting to move toward 7 lakh tons (700,000 tons).
Gumaste: "I think the most important thing is today, we are talking about producing and selling 2 lakh tons of tubes. I think we are nowhere nearer to those numbers. And we look forward that this year, we go very close to 200,000 metric ton of tube sales."
Margins: The 15% Company-Level Target
- Company-level EBITDA margin target is 15%: Management expects casting and tubes to operate at stable 15–16% EBITDA margins, with the overall company reaching 15% EBITDA.
- Power & fuel cost aspiration: From the current 6.7%, management wants to bring it down to 4%.
- Solar benefit this year: Total INR80 crores expected, roughly INR40 crores more than last year.
- Iron ore benefit this year: INR40–45 crores expected from consuming 250,000 tons of captive ore, versus only 57,000 tons last year.
- Coking coal benefit timing: Lower coal prices booked but not yet consumed will benefit Q1 and Q2 of the current year.
- Efficiency improvements are in place: Pig iron price behavior will determine the extent of overall EBITDA improvement from here.
Gumaste: "I expect that ultimately, end of the day, it should give us a similar EBITDA margin of at least somewhere between 15% to 16%, 17%. And if we establish well and we make a name, we are a differentiator, you can expect to 20%."
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Tube sales volume | Very close to 2 lakh tons | FY26 |
| Casting sales volume | Close to 1.6 lakh metric tons (20% growth vs FY25) | FY26 |
| Casting quarterly run rate | Beyond 40,000 tons per quarter | FY26 |
| Oliver foundry ramp-up | 1,500 tons per month | Next few months |
| Company-level EBITDA margin | 15% overall, with casting and tubes at stable 15–16% | FY26 |
| Power & fuel cost | Bring from 6.7% to 4% level | Aspirational, undated |
| Solar power benefit | INR80 crores total (INR40 crores incremental vs last year) | FY26 |
| Captive iron ore benefit | INR40–45 crores from 250,000 tons of own ore | FY26 |
| 12.6 MW windmill | Operational | During FY26 |
| 30 MW solar | Commissioned | During FY26 |
| Koppal steel furnace | Land development and civil work start; equipment orders placed | FY26 |
| NSE listing | Will put efforts to get it listed | No specific timeline |
Key Metrics
| Metric | Q4 FY25 |
|---|---|
| Revenue (pig iron) | ₹519 cr, up 4% YoY |
| Revenue (casting) | ₹412 cr, up 17% YoY |
| Revenue (tubes) | ₹613 cr, up 27.5% YoY |
| EBITDA | ₹199 cr, up from ₹181 cr in Q4 FY24 |
| EBITDA (full year) | ₹758 cr, down from ₹868 cr in FY24 |
| Power and fuel cost | 6.7% of revenue, improved from 8.6% YoY |
| Pig iron sales volume | 1,35,727 tons, up 13% YoY |
| Pig iron sales realization | down 8% YoY |
| Casting sales volume | 32,200 tons, up 15% YoY |
| Casting sales realization | ₹1,27,995 per ton, expected to sustain in ₹1,25,000–₹1,26,000 range |
| Tube sales volume | 51,555 tons |
| Tube sales realization | ₹1,18,074 per ton, down 7% YoY |
| Steel sales volume | 20,700 tons, up 52% YoY |
| Liquid metal production (full year) | 631,000 tons |
| Liquid metal production target (FY26) | ~700,000 tons |
| Captive iron ore consumed (full year) | 57,000 tons, target 250,000 tons in FY26 |
| Solar power benefit (full year) | ~₹40 cr, expected to reach ₹80 cr in FY26 |
| PCI consumption | ~5,000 tons of coke replaced by pulverized coal injection |
| Carbon rate | 535 kg, improved 60–70 kg; potential to improve another 15–20 kg |
| Tube segment PBIT margin | below 3% |
| Casting quarterly volume aspiration | beyond 40,000 tons per quarter |
| Tube annual volume aspiration (FY26) | ~2 lakh metric tons |
| Capex spent (FY25) | ~₹500 cr |
| Capex expected (FY26) | ₹500–₹600 cr |
| Renewable capacity addition (FY26) | 12.6 MW wind + 35 MW solar |