Key Takeaways
- Production hit by stoppages, but casting grew: Full-year standalone casting production rose 7% (16% including Oliver), while pig iron and steel output fell due to a 3.5-month Hiriyur blast furnace stoppage and two steel plant shutdowns for environmental upgrades.
- Realization pressure masked volume growth: Top-line grew only 3% (5.1% including Oliver) because commodity price drops compressed realizations; pig iron and steel prices began recovering in Q4, and casting realizations are expected to improve as commodity-linked reductions flow back.
- Solapur ramp-up is the near-term margin lever: The new foundry is stuck at 4,200 MT/month against a 6,000 MT minimum expectation due to core productivity challenges with complex blocks and heads; management targets 5,000 MT/month average in FY27, which would unlock operating leverage toward the 15% EBITDA ambition.
- Power cost savings are building a structural advantage: Solar delivered ₹70 crores benefit in FY26; new 35 MW solar and 25 MW wind will add ₹45 crores in FY27, rising to ₹90 crores at peak, with battery storage to follow.
- What to watch next quarter: Whether Solapur output reaches the 5,000 MT/month run rate, the pace of pig iron price increases against rising coal costs, and any clarity on the unexplained jump in other expenses.
Production & Volume Recovery
- Hiriyur restart dragged Q4: The blast furnace was idle for 3.5 months because market conditions were not conducive; full volume did not return in Q4 due to start-up spillover and a 5-day stoppage at one furnace, pulling down overall productivity even as Koppal output rose.
- Pig iron volume target: Management expects to quickly return to 7 lakh metric tons or at least 680,000–690,000 with current productivity, supported by the oxygen plant upgrade that will lift enrichment from 2.5% to 5% and PCI from 130 kg to 160–170 kg.
- Steel production flat: Two major stoppages for erection of primary and secondary fume extraction systems kept output level; external steel sales reached 85,000 tons last year with efforts underway to increase that before the steel plant expansion comes online.
- Casting volume commitment: FY27 target is 180,000–190,000 metric tons, with Koppal at 105,000 tons, Solapur at 60,000 tons (5,000 MT/month), and Oliver at 25,000 tons.
- Oliver ramp-up on track: Rajpura plant produced 13,500 tons in FY26, reaching 1,700 MT/month by Jan–Mar; April already at 1,700–1,800, targeting 2,200–2,300 by year-end with order bookings already secured and machining setup in place.
Gumaste: "Basically, we struggle with the core productivity and complexity of casting. And it is nothing to do with the customer itself. These are complicated blocks and heads. They do take some time to stabilize the process and stabilize the output."
Casting Business Transformation
- Demand drivers are broadening: Robust demand from auto and tractor sectors continues, while the customer mix is shifting: export share rose from 20% to 28%, CV segment from 12% to 16%, and all customers are now seeking intricate castings like blocks and heads.
- Three new customers added: One diesel engine manufacturer supplying India and export markets, two others for tractor engines at the TREM V next level, plus direct export orders booked for earthmoving equipment.
- Realization poised to improve: New order bookings are at better pricing than conventional tractor housings and crankcases; management expects to cross ₹130 per kg within 2 years, with part of the ₹10–12 per kg commodity price reductions given earlier now flowing back.
- Sixth foundry and seventh foundry: The sixth foundry for large castings is being commissioned; management says there is "no choice but to immediately take up" a seventh foundry program to service customers without failure.
- Machining value add: All 22 HMCs are now operational with a couple more coming shortly; the next lot is being ordered, and machining value of about ₹100 crores is expected within a year.
Gumaste: "Definitely much more than that because the commodity price increases will also start coming in these quarters. And the reductions given by us were of the order of INR10 per kg or INR12 per kg. And I expect part of it at least flow back."
Solapur: The Critical Ramp-Up
- The bottleneck is process, not demand: Solapur is described as "ticklish" because complicated blocks and heads require time to stabilize core productivity and output; the issue is unrelated to customers or order availability.
- Current vs. target run rate: Output is at 4,200 MT/month against a 6,000 MT minimum expectation, meaning roughly 30% of utilizable capacity remains to be unlocked over the next 3–4 quarters.
- FY27 plan: Management targets averaging close to 5,000 MT/month, producing 60,000 tons and selling 55,000–56,000 tons; the run rate should "very shortly" reach ~15,500 per month, or 45,000–46,000 per quarter.
- Why it matters for margins: Solapur's ramp-up is the most direct path to operating leverage; EBITDA margin sits just above 12.5% today, and management says it is comfortable only at 15%.
Pig Iron & Steel: Pricing and Cost Dynamics
- Pig iron pricing lagged the recovery: Full benefit of Q4 price increases did not flow through because of 15-day to 1-month order book commitments; January was already booked at old prices when the increase was implemented, and some fine correction continued into April.
- Price increase called inevitable: International pig iron is at $475, and management stated a price increase "will go up for pig iron," though the timing and magnitude were not quantified.
- Coal cost headwind emerging: The dollar at ₹95 and coking coal prices up $25/ton will factor into costs; management has asked teams to work on coal purchase commitments and production cost analysis but offered no specific Q1 FY27 spread guidance.
- Long-term steel strategy: One Koppal blast furnace will shift to steel production, reducing pig iron sales to 5 lakh tons; the second blast furnace is earmarked for alloy steel, and the seamless tube plant in Baramati will expand so entire steel blooms are consumed internally.
- Rolling mill debottlenecking: The goal is to roll the entire 3 lakh tons, with 50,000–60,000 tons going to Ahilyanagar and the remaining 240,000 tons (20,000 tons/month) available for non-KFIL sales.
Gumaste: "I think price increase inevitable. It will go up for pig iron."
Power & Backward Integration
- Solar delivered, more coming: The existing solar plant gave about ₹70 crores benefit in FY26; 35 MW solar will be commissioned by July/August and 25 MW wind by September, adding ₹45 crores in FY27 and rising to ₹90 crores at peak capacity, for a total potential benefit of ₹160 crores.
- Wind complements solar: Wind generation is higher during monsoon, making the portfolio more balanced across seasons.
- Battery storage next: Preliminary work has started on a megawatt-level battery storage system to increase green power utilization, partly in response to new Maharashtra regulations.
- Oxygen plant upgrade: A 150 tons per day oxygen plant will be commissioned toward year-end, enhancing oxygen enrichment from 2.5% to 5% and PCI from 130 kg to 160–170 kg, which will increase pig iron output and reduce coal consumption.
- Mine-to-machine vision: Management is pursuing backward integration from Jambunath Gudda iron ore mines through beneficiation and a pellet plant, aiming for a "mine to machine castings and mine to seamless tubes" model with energy management as the key differentiator.
Gumaste: "What we are trying to do is mine to machine castings and mine to seamless tubes. And with energy management being the key thing and monetizing the energy cost today into energy savings tomorrow."
Seamless Tubes & Capex
- Tube volume grew, realization dropped: FY26 volumes reached 188,700 tons vs 168,800 tons; management targets 10–11% volumetric growth in FY27 and expects 5–6% realization recovery from the 10% drop last year, supported by rising pig iron, steel, and power/fuel prices.
- Capacity expansion underway: The target is 4 lakh MT per annum by adding an expanded mill of 150,000 tons to the existing 230,000 tons; basic study and design are done, the project will complete within 1.5 years, and investment will be "plus of ₹500 crores."
- Hiriyur blast furnace upgrade: A ₹125–₹150 crore investment will upgrade capacity to 250,000–300,000 MT per annum, with output usable as pig iron, for spun pipe, or for steel; payback is expected in less than 2 years.
- Capex run rate sustained: Management plans to continue investing ₹600–₹700 crores every year, with cash generation expected to be better than that.
- Oliver merger: The merger of Oliver Engineering into Kirloskar Ferrous is expected to close in the next couple of months, allowing benefit to be taken for FY26 itself.
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Casting volume | 180,000–190,000 metric tons (Koppal 105k, Solapur 60k, Oliver 25k) | FY27 |
| Solapur run rate | Average close to 5,000 MT/month, producing 60,000 tons | FY27 |
| Oliver Rajpura output | 24,000–25,000 tons for full year; exit at 2,200–2,300 MT/month | FY27 |
| Pig iron volume | Return to 7 lakh MT or at least 680,000–690,000 | Near term |
| Tube volumetric growth | 10–11% improvement | FY27 |
| Tube realization recovery | 5–6% recovery from the 10% drop last year | FY27 |
| EBITDA margin | Reach 15% (from just above 12.5% currently) | No date; "comfortable only at 15%" |
| Power cost benefit | ₹115 crores (₹70cr existing + ₹45cr new); ₹160 crores at peak | FY27 / peak |
| Solar and wind commissioning | 35 MW solar by Jul/Aug, 25 MW wind by Sep | FY27 |
| Oxygen plant | 150 TPD plant enhancing enrichment to 5% | End of FY27 |
| Hiriyur blast furnace upgrade | ₹125–₹150cr investment, capacity to 250k–300k MT, payback <2 years | No start date |
| Seamless tube expansion | Add 150,000 MT mill, total 4 lakh MT, investment ₹500cr+ | Within 1.5 years |
| Oliver merger | Merger into KFIL closed | Next couple of months |
| Machining value | ~₹100 crores | Within a year |
| Casting realization | Cross ₹130 per kg | Within 2 years |
Key Metrics
| Metric | Q4 FY26 |
|---|---|
| Revenue | ₹1,781 cr, total sales value for the quarter |
| Full-year revenue | ₹6,861 cr, vs ₹6,628 cr last year; 3% standalone growth, ~5.1% including Oliver |
| Profit before tax | ₹514.43 cr, vs ₹532 cr before exceptional item last year; after exceptional item ₹514 cr vs ₹432 cr |
| EBITDA margin | Just above 12.5%, management comfortable only at 15% |
| Pig iron production | 1,58,152 MT, down 3% YoY |
| Pig iron sales volume | 1,27,600 MT, down 6% YoY |
| Pig iron sales realization | Down 6% YoY |
| Casting production | 36,596 MT, up 13% YoY; full-year 1,48,564 MT standalone, up 7%, or 16% including Oliver |
| Casting sales volume | 34,980 MT, up 9% YoY |
| Casting sales realization | Down less than 1% YoY |
| Tube production | 56,119 MT, up 6% YoY; full-year 2,16,914 MT vs 1,99,443 MT |
| Tube sales volume | 51,106 MT, flattish vs 51,500 MT last year |
| Tube sales realization | Down ~10% YoY; NSR ended at ₹1,13,000 per ton |
| Steel production | 58,119 MT, down 10% YoY; full-year 2,40,000 MT vs 2,42,000 MT |
| Steel sales volume | 24,812 MT, up 20% YoY |
| Solapur foundry utilization | ~70%, 4,200 MT per month vs minimum expectation of 6,000 MT |
| Oliver Engineering FY26 revenue | ~₹118–119 cr (range of ₹120 cr) |
| Casting export share | 28%, up from 20% |
| Casting CV segment share | 16%, up from 12% |
| Casting customer count | 29, added 3 new customers this quarter after steady at 26 for 6 years |
| Power cost benefit from solar | ~₹70 cr in FY26 |
| International pig iron price | $475 per ton, encouraging level |