Key Takeaways
- Margin squeeze from power costs, not demand: EBITDA margin landed at 12–13% as a ₹58 crore power and fuel jump hit the quarter, split roughly evenly between rate increases and higher volumes. Casting demand stayed strong across every end market.
- Commodity cycle has turned, benefits lag: Management declared the southward commodity price trend reversed, with pig iron and steel prices rising and a break in coke dumping. Price increases and cost pass-ons were still being concluded in Q1, so the benefit lands in Q2 and Q3.
- Volume growth is the stated engine: Management targets at least 15% volumetric growth across all products this year, led by castings at 17–20% and steel at over 20%, with tubes recovering at least 10%.
- Capex is accelerating into a multi-year buildout: FY27 spend of ₹600–700 crores is the down payment on ₹3,000–3,500 crores of projects over four years, including the Koppal steel plant, a Baramati expander mill, and iron ore beneficiation.
- What to watch next quarter: Whether the promised Q2–Q3 price pass-through actually shows up in margins, the pace of tube volume recovery, and any movement on the Supreme Court forest development fee case.
Power & Fuel: The Margin Story
- The ₹58 crore hit: Other expenses jumped on power and fuel, with roughly half from rate increases (~₹28–29 crores) and half from quantity increases (~₹28 crores) as Rajpura castings ramped and Jejuri ran a full month versus last year's shutdown.
- Regulatory damage compounds the rate problem: Power trading is no longer allowed, eliminating a ~₹10 crore annual benefit, and green power usage was restricted from 17 hours to 8 hours, reducing the efficiency of existing green assets.
- Geography decides exposure: Koppal is completely self-sufficient on waste heat recovery power, while Maharashtra operations, Solapur and the steel and tube plants, carry the cost burden. LPG consumption cost in Solapur has doubled versus pre-war purchasing.
- The fix is structural but slow: A 35 MW solar plant is commissioning now, 12 windmills of 2.1 MW each land between June and September, and management is "very sure" it will start taking some power through battery storage "very shortly" at 50–70 MW scale.
- Cost pass-through is partial: Castings costs have been passed to customers, alloy steel is still under discussion, and tubes need a market pickup before the cost difference can be recovered.
Gumaste: "Now having come up to this, what do we do in terms of our vision to bring at least the power cost to a level like 5% to 6% company level."
Commodity Prices & Realizations
- The cycle has turned: Pig iron prices have risen, steel price increases have been announced by many manufacturers, and international pig iron prices have picked up enough to support exporting 30,000 metric tons at slightly better realization than domestic.
- Coke dumping has broken: A break in coke dumping into India is providing support and should stabilize the pig iron business, which management says has dragged overall company EBITDA for the last four years.
- Casting realizations held through the downturn: Even as commodity prices fell last year, casting realization did not go down, rather it was maintained or slightly improved.
- Tube realizations are the weak link: Tube sales dropped 14% because the company had to sell more line pipes in the absence of high-realizing export orders and oil and gas tubes, so product mix could not hold sales realization.
- Coal costs peak in Q2: The company carries three months of coal stock, so June–August will see high-cost coal working through, higher than April–June, though coal prices have slightly come down since.
Gumaste: "I feel that the commodity prices going southward is reversed."
Segment Performance
| Segment | Trend | Commentary |
|---|---|---|
| Castings | ▲ Strong | Demand strong across tractors, automobiles, earthmoving equipment, stationary engines. Rajpura sold out at ~2,200 tons per month; realization held or improved. |
| Steel | ▲ Full | Running at full capacity; external sales targeted at 1 lakh to 1.1 lakh tons, over 20% growth. Jejuri yield improved and other manufacturing costs reduced. |
| Pig iron | ▲ Recovering | Prices up, exports at better realization, coke dumping break. Visibility to go very close to 7 lakh tons this year. |
| Tubes | ▼ Soft | Volumes down 14% on subdued oil and gas activity and export weakness; auto and tractor markets doing well but not high-yielding for tubes. |
- Pig iron drag is structural: Steel and tube margins sit at 14–17% while pig iron has suffered, pulling down overall company EBITDA over four years. The current price recovery is the first real support in that period.
- Tube volatility is market-driven: Management says the volatility has nothing to do with welded tube substitution, and the fix is internal: processing capacity, premium couplings, and portfolio expansion to 18 inches all within 12 months except the expander mill.
- Casting EBITDA anchor: Management is a "firm believer" that 15% EBITDA plus/minus 1% is the right level to operate castings, implying current margins are near target and the focus is volume and mix, not margin expansion.
Capacity Buildout & Projects
- Three large projects anchor the medium term: A steel plant at Koppal, an expander mill for large-capacity seamless tubes at Baramati, and a beneficiation and pellet plant with operationalization of iron ore mines at Koppal, all at different stages of execution with the large ones at the start.
- Koppal steel expansion is committed: The decision to go ahead is taken, all government clearances are in place, and preliminary work, project report, timeline and technology partners are ready. Land clearance within factory premises is pending, with the next stage expected in 2–3 months and commissioning within 2 years.
- Rolling mill expansion is the bridge: Capacity goes to 25,000 tons per month, 3 lakh tons annually, with activity starting now and completion in ~18 months, timed to be ready for Koppal blooms.
- Rajpura doubles in 8 months: From the current sold-out ~2,200 tons per month, capacity expands to at least 40,000–45,000 tons per annum, with Phase 2 taking it to 6,000 tons per month or 70,000 tons per annum.
- No-bake foundry adds flexibility: Commissioning by October at 1,250 tons per month, opening segments beyond auto and tractors, including earthmoving equipment and high-value low-volume products. Management is already considering one more 2-part foundry in another location.
- Machining is the value-add: Machine shops have started in all three locations, Koppal, Solapur and Rajpura, supplying fully machined components ready for assembly, including a 6-cylinder head fully machined with child parts to an OEM.
- Large castings have a waiting customer: One customer wants the full capacity, and work has already started to build more large castings foundry, with 500–600 tons per month expected within 1 to 1.5 years.
Gumaste: "I think there's no point in waiting for anything."
Volume & Revenue Targets
- The headline commitment: At least 15% volumetric growth across all products this year, with price support driving decent top-line growth in the coming three quarters.
- Castings lead: Gross sales from 1,62,000 to ~1,88,000 tons, 17–20% growth, with capacity of 2,70,000 tons realizable this FY plus two more years, and 3 lakh tons in 3–4 years.
- Steel follows: External sales of at least 1 lakh to 1,10,000 tons, over 20% growth, with 2,40,000 tons external sale capacity once Koppal commissions in 2 years.
- Tubes recover: At least 10% volumetric growth YoY, with the 23,000-ton ONGC/Oil India order to be completed in the next 2 quarters and capacity reaching 3,50,000 tons per annum on expander mill completion.
- Medium-term aspiration: ₹14,000 crores revenue with 3 lakh tons casting sales and 4 lakh tons tube sales, carried over from the AGM.
- Pig iron stays steady: Visibility to go very close to 7 lakh tons this year, possibly slightly less, with 9 lakh tons liquid metal capacity after blast furnace upgrades and 0.05 crore tons external pig iron sales maintained.
Capex & Green Power
- FY27 is the ramp year: ₹600–700 crores of capex this year, with next year and the year after higher, totaling ~₹3,000–3,500 crores of projects over the next 4 years.
- Green power spend slows deliberately: Management will not have aggressive spend on green power due to regulatory constraints, and battery is an evolving technology, so it will start with 50–70 MW battery storage, not 500 MW.
- The committed benefits are large: 70 MW solar delivers ₹70–80 crores benefit, 35 MW solar ~₹30 crores, and wind plus solar combined ₹70–80 crores, though these are realizable projections requiring commissioning and regular operations.
- Hiriyur upgradation is underway: Working to produce pig iron up to 360,000 tons with reduced coal consumption via pulverized coal injection, bell-less top and features incorporated in the Koppal blast furnaces 1 and 2, with oxygen plant and enhanced PCI expected complete by February–March.
- Tube processing capacity is a near-term lever: Increased capacity for processing oil and gas tubes to execute large projects in 3–4 month windows, plus in-house premium couplings capacity at Baramati, with the project expected to be ordered in the next few weeks.
Gumaste: "There is a negative impact, but we continue to progress because still there is benefit. And we also already examining how quickly we can move on to battery storage systems on megawatt level so that we can continue with our journey of solar and wind power and not really go back on that commitment of green power and also thereby the commercial benefits coming."
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Volume growth | At least 15% volumetric growth across all products | FY27 |
| Casting volumes | 17–20% growth, gross sales from 1,62,000 to ~1,88,000 tons | FY27 |
| Steel volumes | External sales of at least 1 lakh to 1,10,000 tons, >20% growth | FY27 |
| Tube volumes | At least 10% volumetric growth YoY | FY27 |
| Pig iron volumes | Very close to 7 lakh tons, possibly slightly less | FY27 |
| Rajpura expansion | Expand capacity to at least 40,000–45,000 tons per annum | Next 8 months |
| No-bake foundry | Commission at 1,250 tons per month | By October |
| Oxygen plant and PCI | Completion at Koppal blast furnaces 1 and 2 | February–March |
| Rolling mill expansion | Capacity to 25,000 tons per month, 3 lakh tons annually | ~18 months |
| Koppal steel plant | Commissioning within 2 years; next stage in 2–3 months | 2 years |
| Expander mill | Full tube capacity of 3,50,000 tons per annum | 2 years to build, full capacity in 3–4 years |
| Large castings ramp | 500–600 tons per month | 1 to 1.5 years |
| ONGC/Oil India order | 23,000 tons completed | Next 2 quarters |
| Capex | ₹600–700 crores FY27; ~₹3,000–3,500 crores total | FY27 and next 4 years |
| Battery storage | Start with 50–70 MW | "Very shortly" |
| Power cost vision | Bring power cost to 5–6% at company level | More clarity in coming months |
Key Metrics
| Metric | Q1 FY27 |
|---|---|
| Revenue | Not disclosed as a consolidated absolute figure; medium-term aspiration of ₹14,000 crores with 3 lakh tons casting sales and 4 lakh tons tube sales |
| EBITDA margin | 12% to 13% for Q1, pulled down by pig iron business |
| Pig iron production | 1,65,120 metric tons, up 5% YoY from 1,57,112 metric tons |
| Pig iron external sales | 1,28,737 metric tons, down 3% YoY from 1,32,392 metric tons |
| Castings production | 43,800 tons, up 19% YoY from 36,929 tons |
| Casting sales | 41,345 metric tons, up 18% YoY from 34,941 metric tons |
| Tube production | 51,968 metric tons, down 8% YoY from 56,558 metric tons |
| Tube sales | 41,512 tons, down 14% YoY from 48,461 metric tons |
| Other expenses increase | ₹58 crores increase, of which ₹58 crores is power and fuel; split as ₹28–29 crores rate increase and ₹28 crores quantity increase |
| Power trading benefit lost | ₹10 crores per annum previously earned from power trading, now stopped due to regulatory change |
| Green power usage restriction | Previously allowed 17 hours, now only 8 hours |
| Green power benefit estimate | Instead of ₹100 crores benefit per year, may get ₹80 crores; payback period from 3 years may go to 3.6–3.7 years |
| Forest development fee contingent liability | ₹350 crores disclosed in annual report; fee is 8% levied by Government of Karnataka in 2016 |
| Pig iron price | Moved from ₹39,000 per metric ton to closer to ₹42,400 QoQ (analyst-stated, management acknowledged) |
| Pig iron volume guidance | Very close to 7 lakh metric tons for FY27 |
| Casting volume growth guidance | 17% to 20% growth expected; gross sales from 1,62,000 to ~1,88,000 |
| Steel external sales target | At least 1 lakh to 1,10,000 metric tons, more than 20% growth vs ~84,000 tons last year |
| Tube volumetric growth target | At least 10% YoY |
| Overall volumetric growth target | At least 15% across all products |
| Total realizable casting capacity | 2,70,000 metric tons across all 6 foundries; expected in this financial year plus 2 more years |
| FY27 capex expected | ₹600–700 crores |
| Total project pipeline | ₹3,000–3,500 crores over next 4 years |
| Tube order book | 23,000 tons from ONGC and Oil India including couplings (per annual report, analyst-referenced) |
| Current month pig iron sales plan | 58,000 tons including internal sales; remove 10,000 for internal |
| Foundry grade pig iron | Around 20,000–25,000 tons, not more |
| 70 MW solar expected benefit | ₹70–80 crores in power cost |
| 35 MW solar expected benefit | ₹30 crores |
| Windmill capacity | Equivalent to 55 MW; combined solar + wind expected benefit ₹70–80 crores |
| Power cost vision | Bring to 5%–6% at company level |
| Tube portfolio coverage | Currently up to 10 inches, covering ~60% of addressable market; going to 18 inches adds another 40% |
| 18-inch tube capability timeline | 2 years from now |