Key Takeaways
- Volume growth offset price weakness: Casting production rose 16% (incl. Oliver) and pig iron would have neared 7 lakh MT but for a blast furnace stoppage, yet top-line grew only 3% as realizations fell across pig iron (-6%), castings (flattish) and tubes (-10%).
- Profit up ~INR 100 crores despite the price drag: PBT improved on casting volume growth and cost management, with a ~INR 70 crore benefit from the solar plant. The EBITDA margin sits just above 12.5%, with a stated ambition to reach 15%.
- The casting order book is building a better mix: New orders are booking at better pricing than conventional tractor housings, driven by export castings, complex blocks and heads, and machining value addition. Management expects realizations to cross INR 130 per kg within two years.
- A capex cycle is accelerating across the board: A sixth foundry is commissioning shortly, a seventh is planned, the biggest-ever tube mill is a ~INR 500 crore project, and a Hiriyur blast furnace upgrade is planned. Annual capex is guided at INR 600–700 crores, with cash generation expected to exceed that.
- What to watch next quarter: Whether Solapur foundry utilization climbs toward the 5,000-ton-per-month target, the pace of pig iron price realization catching up to the $475 international price, and any clarity on the EBITDA margin trajectory that management declined to quantify.
Casting: The Volume and Mix Engine
- Production growth was broad-based: Standalone casting production rose 7%, and including Oliver the increase was 16%. Growth came from new castings moving from development to serial production and robust demand from auto and tractor sectors.
- Realization held despite commodity givebacks: Realization was flattish after passing commodity price reductions of INR 10–12 per kg to customers. The offset came from a richer mix: export castings, complex blocks and heads, and machining value addition are sustaining and improving realizations.
- New customers are adding visible volume: Three new customers were added: one diesel engine manufacturer supplying India and export markets, and two for stationary engines and tractors aligned with TREM V norms. Direct export orders for earthmoving equipment were also booked. Management claims a clear volume growth plan with fixed SOP deadlines and visibility for the next 3–4 years.
- Machining is becoming a material revenue stream: 22 HMCs have been absorbed into operation, with more being commissioned and the next lot on order. Management expects ~INR 100 crores in machining value within a year.
- Solapur remains the bottleneck: The foundry is running at ~70% utilization (4,200 MT vs a 6,000 MT target). The issue is core productivity on complicated blocks and heads, not customer demand. Management expects to reach a 4,500-ton-per-quarter run rate very shortly and average close to 5,000 tons per month in FY27.
- Oliver integration is imminent: The merger of Oliver into Kirloskar Ferrous is expected to close in the next couple of months, adding 1,700 tons per quarter to KFIL books. Oliver's Rajpura plant is targeting 2,000 tons per month, or 24,000 tons for the year, and should reach 2,200–2,300 per month by year-end.
- The foundry pipeline is stretching: A sixth foundry for large castings is being commissioned shortly. Management stated there is "no choice" but to immediately take up a seventh foundry program to service customers without failure, targeting completion within 2–3 years. The aspirational volume target is 3 lakh MT per annum over the next 2–3 years, growing 10–15% every year.
Gumaste: "Our effort to grow 20%, 25% are not realistic. As I have been talking many, many years, we keep looking forward to growing volumetric growth of, say, 15%, which I consider as reasonably good."
Pig Iron and Steel: Price Pain, Volume Ambition
- Production was held back by a deliberate stoppage: Pig iron production fell 3% YoY because the Hiriyur blast furnace was stopped for ~3.5 months when market conditions were not conducive. MBF1 and MBF2 at Koppal produced more than last year, and total output could have been close to 7 lakh MT if realizations had been better.
- Realizations dropped 6% and the Q4 price pickup was partly missed: Commodity prices were low through most of FY26, with pig iron and steel prices picking up only in Q4. Because of 15-day to one-month forward order book commitments, January was already booked when the price increase was implemented in late December, so the full benefit did not flow through. A further correction happened in April.
- Management is bullish on a price recovery: International pig iron prices are at $475, and management is closely watching for conversion to Indian price increases. The stated view: "price increase inevitable. It will go up for pig iron."
- The long-term plan shifts the mix toward steel: One Koppal blast furnace will move to steel production, reducing pig iron sales to 5 lakh tons. The second blast furnace is planned for alloy steel production. The seamless tube plant in Baramati will be expanded so the entire steel bloom output is consumed internally.
- The Hiriyur blast furnace will be upgraded: A INR 125–150 crore plan will upgrade capacity to 2.5–3.0 lakh metric tons per annum, with a payback period of less than two years. The output may continue as pig iron or be directed into spun pipe or steel.
- Steel external sales are set to grow: Last year's external steel sales were 85,000 MT. A rolling mill debottlenecking will enable rolling the entire 3 lakh tons, with ~2,40,000 MT available for non-KFIL sales (20,000 MT per month).
Gumaste: "I think price increase inevitable. It will go up for pig iron."
Tubes: Volume Recovery, Partial Price Recovery
- Revenue was hit by a 10% drop in NSR per ton: The value decline was the primary drag on the tube segment's top line. Management expects roughly half of that drop, or 5–6%, to recover in FY27.
- Volume growth is expected at 10–11%: A volumetric improvement is anticipated, supported by pending orders from past tenders, growing exports, and reconstruction demand driven by high fuel prices. New ONGC tenders are expected this year, and management believes the domestic and export oil and gas segment should be robust.
- The biggest-ever tube mill is a ~INR 500 crore bet: A new mill project is expected to complete within the next 1.5 years, adding 1,50,000 MT of expanded capacity. Combined with the existing 2,30,000 MT capacity, which management aims to fully realize in the coming year, the target is 4 lakh MT per annum.
Power and Raw Material: Self-Help on Costs
- Solar delivered ~INR 70 crores in FY26 savings: The existing solar plant provided a material cost benefit that supported PBT despite the revenue headwinds.
- A wind-plus-solar build-out is underway: A 25 MW wind and 35 MW solar project will begin commissioning in June and complete by September. The full-year benefit is estimated at INR 70–90 crores, with roughly half of that accruing in FY27. Total green power capacity will reach ~90 MW.
- Battery storage is the next step: Preliminary work has begun on a megawatt-level battery storage system to increase green power utilization, partly in response to new Maharashtra regulations.
- An oxygen plant will lift pig iron productivity: A 150-ton-per-day oxygen plant will be commissioned toward the end of this year. It will enhance oxygen enrichment from 2.5% to 5% and PCI from 130 kg to 160–170 kg, increasing pig iron output and reducing coal consumption.
- Iron ore security is progressing: The Jambunath Gudda iron ore mines are progressing well on operationalization, with plans for a beneficiation and pellet plant.
Margins: The 15% Target, Without a Timeline
- EBITDA margin sits just above 12.5%: Management's stated comfort zone is 15% EBITDA, and the effort is to reach that level across all products through volume growth. No specific trajectory or timeline was provided when an analyst pressed for one.
- Cost management offset the price drag in FY26: PBT improved by ~INR 100 crores despite lower realizations, driven by casting volume growth and cost control. The solar benefit of ~INR 70 crores was a meaningful contributor.
- Management declined to quantify one-off items: When asked about a rise in other expenses to INR 465 crores and other income at INR 44 crores, management said it did not have ready numbers and referred to a colleague who was traveling.
- Q1 FY27 spread clarity was deferred: When asked about spreads given rising coking coal prices, management deflected, saying it had asked its team to work on three things and would bring more clarity as the year progresses.
Gumaste: "I have been talking about that we are comfortable only when we are at 15% EBITDA. And in all products, we continue to look for the volume growth."
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Casting production volume | 1,80,000–1,90,000 metric tons | FY27 |
| Overall volume growth | At least 15% | FY27 |
| Solapur foundry utilization | Average close to 5,000 tons per month | FY27 |
| Oliver Rajpura production | 2,200–2,300 tons per month by year-end; 24,000–25,000 tons full year | FY27 |
| Tube volumetric growth | 10–11% improvement | FY27 |
| Tube NSR recovery | 5–6% recovery of the 10% value drop | FY27 |
| Machining revenue | ~INR 100 crores | Within a year |
| Casting realization | Cross INR 130 per kg | Within 2 years |
| Casting capacity aspiration | 3 lakh MT per annum | 2–3 years |
| Seventh foundry | Must be created or will fall short of capacity | Within 2–3 years |
| Biggest tube mill | INR 500+ crore investment, 1,50,000 MT added capacity | Within 1.5 years |
| Hiriyur blast furnace upgrade | INR 125–150 crores, capacity to 2.5–3.0 lakh MT; payback under 2 years | Not specified |
| Green power commissioning | 35 MW solar by Jul/Aug, 25 MW wind by Sep; full-year benefit INR 70–90 crores | FY27 (half-year benefit) |
| Oxygen plant | 150 TPD, enhancing oxygen enrichment and PCI | End of this year |
| Annual capex run-rate | INR 600–700 crores, with cash generation expected to exceed it | Ongoing |
| Oliver merger into KFIL | Close and realize benefit | Next couple of months |
Key Metrics
| Metric | Q4 FY26 |
|---|---|
| Revenue | ₹1,781 cr (Q4); ₹6,861 cr (FY26), +3% YoY standalone, +5.1% including Oliver |
| Profit before tax | ₹514.43 cr (FY26) vs ₹432 cr last year (after exceptional item), improvement of ~₹100 cr |
| EBITDA margin | Just above 12.5%; management comfortable only at 15% |
| Pig iron production | 1,58,152 MT, -3% YoY |
| Casting production | 36,596 MT, +13% YoY; including Oliver, FY26 growth 16% |
| Tube production | 56,119 MT, +6% YoY |
| Steel production | 58,119 MT, -10% YoY |
| Pig iron sales volume | 1,27,600 MT, -6% YoY |
| Casting sales volume | 34,980 MT, +9% YoY |
| Tube sales volume | 51,106 MT, flattish YoY |
| Steel sales volume | 24,812 MT, +20% YoY |
| Pig iron sales realization | -6% YoY |
| Tube sales realization | -10% YoY; management expects 5–6% recovery in FY27 |
| Casting customer count | 29, 3 new customers added in Q4 after 6 years steady at 26 |
| Casting export share | 28%, up from 20% |
| Solapur foundry utilization | ~70% (4,200 MT/month vs 6,000 MT target) |
| Oliver Engineering revenue | ~₹118–120 cr (FY26) |
| Power cost benefit from solar | ~₹70 cr (FY26) |
| Net debt reduction | Borrowings brought down substantially; cash generation better than ability to invest |