- Triple-digit quarter, export-led: Consolidated revenue grew 119% YoY with exports up 177% YoY, driven by North America data center demand and a global shortage of heat exchanger capacity.
- Data center is the breakout segment: Q1 data center revenue hit ~₹65 crore, nearly 3x last year's ~₹20 crore, and management sees FY27 at 3x to 3.5x the prior year.
- Margins held, upside promised: Operating leverage, product mix (bar and plate, bus AC) and export contribution maintained margins; PLI and RIPS incentives add upside next year.
- North America is the growth engine, not UAE: UAE revenue will decline this year, but overall exports should still double to ~₹200 crore as North America and Europe fill the gap.
- What to watch next quarter: Whether the Vertiv sample order converts to mass production, the Bangalore plant's revenue potential disclosure, and any movement on the L1 bar-and-plate tender.
Data Center: The Breakout Story
- Scale arrived fast: Q1 data center revenue grew from ~₹20 crore last year to ~₹65 crore this quarter, almost 3x. Management's full-year view is 3x to 3.5x including domestic and export.
- Product scope today: Currently only fin-and-tube heat exchangers on the chiller side and indoor side. Microchannel joins the portfolio in about one year for the chiller side; plate-and-plate heat exchanger timing is still unknown and will target CDU or indoor applications.
- Air cooling is not going away: Management sees liquid cooling being added as first cooling, with air cooling continuing as secondary cooling. Fin and tube will continue in data centers and other applications.
Yadav: "It will be not like that air cooling will be finished. Air cooling will be continue, and of course, this liquid cooling will be add as a -- maybe you can say secondary -- on first cooling, and secondary cooling will be air cooling only."
- Order book is not a valid metric here: Orders are rolling, with firm POs open only for about 20 days. Some customers provide six-month forecasts, but management says order booking is not a meaningful indicator for this business.
Yadav: "We have a rolling, like once they order open only for 20 days to firm PO. But that forecast, of course, we have some -- from some of customer for six month. So, order booking, I think, not value -- valid for us."
- Vertiv entry underway: A new data center customer (Vertiv, per an analyst) completed quality audit, KRN is already registered as a vendor, and a sample order arrived last week. Samples ship in two to three weeks; mass production follows sample approval.
North America: The Export Engine
- Structural shortage favors KRN: Data center demand in North America grew sharply last year, and local manufacturers (Modine, Direct Coil, Cancoil) have capacity gaps. They must supply other applications, leaving room for KRN.
Yadav: "Their manufacturing capacity and requirement, I think there is the gap because data center requirement in last one year is increased a lot. So, they have to supply to other application. And then they are able to supply to some quantity to data center. So, that's why we have good chance."
- Lead time beats duty: Even with a 25% duty, KRN wins on lead time. Price savings to customers may be limited because duty absorbs margin, but speed of supply is the deciding factor.
- Customers already on board: Two to three North American data center customers are active, with supply running for the last three to four months.
- Demand runway: Management expects the North America data center shortage to continue for two to three years, supported by good forecasts and orders.
- UAE fades, North America rises: UAE revenue will decline this year due to the global war situation, but overall exports should still almost double because growth comes from North America first, then Europe, then UAE.
Margins: Held Now, Upside Next Year
- Q1 margin drivers: Operating leverage, product mix from bar and plate and bus air conditioning, and export contribution kept margins stable this quarter.
- Customer structure matters: Main customer Daikin has a nearly fixed bottom line with no percentage on costing. New customers carry better margins, so new customer and new product additions pull margins slightly up.
- Subsidiary leverage building: Q1 showed operating leverage that will increase as utilization rises. PLI and RIPS incentives add further upside in the coming financial year.
- Margin band intact: Management reaffirms the 18% to 20% EBITDA margin band, with PLI and RIPS pushing it higher next year "for sure."
Yadav: "I think it will be remain same, or as per, if you see our other things, like if you add PLI and of course RIPS, so it will be increasing next year for sure."
- Product-level margins: Bar and plate and bus AC carry slightly higher gross margins than coil/heat exchanger; refrigeration is slightly lower.
- Microchannel margin view: Total product value will be lower since it is fully aluminum, but margin should remain same or slightly up versus fin and tube because it is new to the India market.
New Products & Capacity Build-Out
- Microchannel is the next launch: Already in machine-ordering stage; the machine will be ordered in the next four to five weeks, then delivery and setup follow. Product enters the portfolio within one year from now.
- First-mover position: No manufacturer exists for commercial microchannel in India today. Automobile applications have many players, but commercial lengths (around 3 meters, width like 1.5 meters) have no supplier. KRN expects to be first.
Yadav: "As of now, there is no manufacturer for microchannel for commercial application. Of course, for automobile application, many manufacturer is there. But for commercial means, the length is quite high, around 3 meter, or width is like 1.5 meters. So, there is no manufacturer. So, I think we will be the first manufacturer as of now."
- Plate heat exchanger is next after microchannel: Work is at a very early stage, mainly for CDU units. Microchannel comes first, then PHE.
- Bar and plate traction: Tender submitted two to three weeks ago; KRN is L1 but no PO yet. Small POs of ₹2–3 crore have already been supplied.
- Bangalore plant: One additional unit in the same HVAC space, planned to start one year from now. Capacity for fin and tube plus backward integration (sheet metal, header manifold). Revenue contribution likely from the third year.
- New Rajasthan facility: Land purchased; building to be constructed in the next one year. Will shift complete bus AC operations and add railway complete HVAC systems.
- Railway entry: Received one or two development tenders last week for complete cab air conditioning from BLW. Process expected to complete in two to three months. Railway team is on board and participating in tenders.
Segment Targets & Roadmap
| Segment | FY27 Target | Growth Outlook |
|---|---|---|
| Data center | 3x–3.5x prior year (~₹65 crore in Q1 alone) | Domestic and export both rising |
| Exports (all segments) | ~₹200 crore | Double last year's ~₹100 crore |
| Bus AC | ~15% market share | 30–40% YoY growth; market ₹1,000 crore growing 30%+ |
| Refrigeration | ~₹150 crore across four-product mix | 40%+ growth from big OEMs and existing customers |
| Bar and plate | ₹40–50 crore | 20–40% growth thereafter; capacity ₹150–200 crore |
| Subsidiary utilization | ~50% this year | 80% next year |
- Fin-and-tube export mix: In three years, management plans to reach 50% of fin-and-tube revenue from exports only.
- Three-year product roadmap: Complete commercial HVAC system line, backward integration (sheet metal, manifolds), oil heat exchanger. Defense stays HVAC-only for now.
- Product complexity constrains speed: Management cautions that the product is technical, not a catalog item or injection-molded part, so scaling requires infrastructure before volume.
Yadav: "Actually our product is quite technical. It's not catalog item and not the injection molding part, we can maybe just increase the three, four times in single year. So, before to increase the good numbers, we need good infra."
USA Expansion: Paused on Policy Uncertainty
- Warehouse-cum-office on hold: Earlier plans for a USA warehouse-cum-office are paused due to shifting Trump policy. Once policy settles, KRN will start with warehousing and a sales office, then expand based on market requirements.
Yadav: "Earlier we thought we can have one our warehouse-cum-office in USA, but honestly, due to the Trump mind every day changing, so we are now in pause mode. So, once Trump will settle down, then of course we will see something in USA."
- Raw material pass-through protects margins: All customer price contracts are linked to metal prices (LME copper, LME aluminum, USD-to-INR), allowing quarterly pass-through. KRN keeps two-and-a-half months of inventory plus about two weeks in transit.
- Finance cost focus: Management is pursuing factoring for export customers and other working capital platforms to reduce finance costs through better management.
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| FY27 revenue | ₹1,000 crore-plus (old guideline) | This year |
| Exports | ~₹200 crore, double last year's ~₹100 crore | FY27 |
| Data center revenue | 3x–3.5x prior year | FY27 |
| Subsidiary utilization | ~50% | FY27 |
| Subsidiary utilization | 80% | FY28 |
| EBITDA margin band | 18–20%, rising with PLI and RIPS | Next year "for sure" |
| Bus AC market share | 10–15% of total market | This year |
| Bus AC growth | 30–40% YoY | FY27 |
| Refrigeration revenue | ~₹150 crore | FY27 |
| Bar and plate revenue | ₹40–50 crore | FY27 |
| Microchannel in portfolio | Machine ordered in 4–5 weeks; production within one year | ~1 year from now |
| Bangalore plant start | One additional unit, same HVAC product plus backward integration | 1 year from now |
| Rajasthan facility | Building complete; bus AC and railway HVAC shifted | 1 year |
| Railway HVAC | Start with cab AC, then complete systems, then Vande Bharat and metro | ~1.5 years from now |
| Fin-and-tube export mix | 50% of fin-and-tube revenue from exports | 3 years |
| North America demand runway | Shortage of heat exchangers to continue | 2–3 years |
Key Metrics
| Metric | Q1 FY27 |
|---|---|
| Consolidated revenue growth | 119% YoY |
| Export growth | 177% YoY |
| Export revenue target | ₹200 crore for FY27, double last year's ₹100 crore |
| Data center revenue | ₹65 crore, up from ₹20 crore in Q1 last year, almost 3x increase |
| Data center export share | 20% to 30% of data center revenue |
| FY27 revenue guidance | ₹1,000 crore-plus |
| New facility utilization target | 50% this financial year, 80% next year |
| Bus AC market size | ₹1,000 crore total India market |
| Bus AC market share target | 10% to 15% this year |
| Bus AC growth expectation | 30% to 40% YoY |
| Bar and plate FY27 target | ₹40 crore to ₹50 crore |
| Bar and plate capacity | ₹150 crore to ₹200 crore |
| Refrigeration FY27 target | ₹150 crore across all four-product mix, growth 40% plus |
| Fin-and-tube export mix target | 50% of revenue from exports in next three years |
| USA duty on product | 25%, paid by company or customer |