KSB Ltd Q1 FY2027 Concall Summary

Source transcript PDF: https://assets.stockscans.in/docs/0enm81r6uv4i2smalzfu6woy.pdf

Key Takeaways


Nuclear: The Anchor of the Investment Case

Patil: "So whenever the next orders come, we will be prepared for that."

First-Half Weakness: What Broke and What Is Fixing

Jain: "I cannot predict what external factors would come because these dynamics change very fast in the external."

Localization & Product Breakthroughs

Jain: "And in the first half, we were successful in breaking the jinx of the boiler circulating pumps. This was a big achievement for us."

Growth Engines Beyond Nuclear

SegmentTrendCommentary
Energy Conventional▲ BuildingBoiler feed pump packages, CTP packages, refinery and hydrocarbon packages; thermal orders started last year with visibility over 2–3 years.
Data Centres▲ Early tractionOrders from an international OEM in India for liquid cooling; dedicated teams for OEMs and product adaptation; portfolio spans HVAC, fire-fighting, plumbing, liquid cooling.
SupremeServ▲ SteadyDedicated Chinchwad unit, warehouse for standard products, value engineering, non-KSB pump parts; complete boiler circulation pump builds now coming in.
Mechanical seals▲ Building baseSignificant product range localized; installed base being built; segment to grow in next 3–5 years.
Marine▬ SelectiveProducts developed and approved in some Naval areas; KSB will target specific critical pumps, not general purpose; ₹100 crore by next year would make management happy.
BP&CL▬ Slow grindPSU-based business requires proven track record and references; making inroads into ONGC and Oil India; EIL approval for reciprocating pumps requires a pump running supplied first in 12 months.
JJM 2.0▬ WaitingPositive due to product range but still struggling with past projects; traction not yet visible on ground.
Water & Wastewater▲ GradualProduct development ongoing: vertical turbine pumps, big-size split case, big-size submersible; KSB out of this project market for decades, re-entry will be gradual.
Jain: "If you ask me in our company, if we would reach a figure of INR 100 crore by next year, we would be happy."

Margins, Costs & Capital Allocation

Jain: "I never keep a cap on the highest margin."

Guidance & Commitments

CommitmentSpecificsTimeline
Full-year growthDouble-digit top-line and bottom-line growth, with low risk seen on nuclear test-bed issueFY27
GHAVP testingTesting to start after test-bed fix expected by end of AugustSeptember 2026
Valves margin recoveryReturn to good double-digit margin once out of current situationNo date, tied to commodity and export normalization
Export order bookGrow from 15% to 20% of orders/salesNo date, tied to external situation
SupremeServ mixReach 25–30% of revenue, growing 15% per annumNo date, ongoing
Marine revenue₹100 crore would make management happyNext year
Solar order book shareTarget 10–12%, currently 5–7%No date, tied to KUSUM resumption
BP&CL scale₹40–50 crore annually once stabilized and able to participate in all tendersMedium-term, 3–5 years or 5+ years
CapEx₹80–120 crore annually for sustenance and growthComing years
S/4HANA cost impactOpEx impact, amount to be discussed in boardNext year

Key Metrics

MetricQ1 FY27
Revenue from sales₹1,292 crore, H1 FY27 (half year ended June 2026)
EBITDA₹146.5 crore, H1 FY27
Profit before tax₹127.9 crore, H1 FY27
Revenue growth2% to 3% over last year, below planned sales
ROCE22.8%, or 24% excluding one-time labour code impact
Dividend declared last year220%
Order intake₹1,530.7 crore, H1 2026 excluding Nuclear
Orders on hand₹2,744.5 crore, as of June 2026
Nuclear order on hand₹1,235 crore, includes GHAVP 1 and 2, Kaiga 5 and 6, and Kudankulam safety package
Order intake mixStandard 51%, Engineered 14%, SupremeServ 16%, Valves ~19%
Solar revenue₹50 to ₹60 crore, H1 FY27, much below expectations due to KUSUM 2.0 delay
Solar share of order book5% to 7%, target 10% to 12%
Export revenue last year₹467 crore, grew 33%
Export order book15% of orders or sales, target 20%
Shirwal plant capacity utilization80% to 90%
Shirwal plant capacity1,200 to 1,300 pumps, expected increase of ~20% post-expansion
SupremeServ growth15% per annum, goal to reach 25% to 30% of revenue
Foundry supply stability85% to 90% resolved
Foundry price increases given12% to 15%, while price hikes to standard markets remain single-digit
Annual CapEx intent₹80 crore to ₹120 crore annually
EBITDA target13% to 14%
Top-line growth outlook15% to 17% on average, volume growth 10% to 15%
Nuclear capacity in India8.8 gigawatt, 24 operational reactors; plan 23 GW by 2031 and 100 GW by 2047
Reactors under construction8, with 10 in pre-project stage
Government announced SMRs5 indigenous SMRs, Bharat Small Reactors of 220 megawatt each
NTPC and NPCIL JV addition~30 gigawatt, part of the 100 GW target
Nuclear pump delivery cycle48 months from order to NPCIL delivery, standard cycle 24 to 36 months
Nuclear pump testing duration500 hours, typically 2 to 3 months
Nuclear pump dispatch planOne pump every quarter, can maximize to 6 pumps per year
BP&CL business run rate₹15 to ₹20 crore, medium-term expectation ₹40 to ₹50 crore annually
Marine business target₹100 crore by next year, or 3% to 5% of sales turnover
Pump portion of project value3% to 5% of total project value, ballpark figure
Spare parts gross margins2 to 3 times higher than normal new-pump business
Import cost burden on non-local products15% to 20%, including surcharges, excluding logistics
S/4HANA cost impactNext year in OpEx, amount not yet determined
APA validity5 years, signed this year