Key Takeaways
- Record quarter, mix-driven: Export revenue grew 76% YoY and specialized wire grew 113% YoY, pushing EBITDA per ton to a record ₹93,000, but management itself flags the CTC mix as temporarily front-loaded.
- The ₹75,000 anchor: Management says it is "comfortable delivering" ₹75,000 EBITDA per ton for full FY27 while explicitly stating this is not a committed guidance number.
- Hitachi framework agreement signed: A five-year supply framework with Hitachi Energy Global covers Indian and some global plants, improving visibility as Phase 2 capacity comes online, though quantities and prices are still being finalized.
- Capacity story is the real story: Phase 2 completion by end-FY27 takes installed capacity to ~59,000 metric tons, making KSH the second-largest winding wire manufacturer in India, with a 10-acre land parcel now being evaluated for expansion beyond that.
- What to watch next quarter: Whether CTC mix normalizes as guided, whether the Hitachi agreement converts into defined volumes, and whether the delayed transformer OEM order pickups actually resume.
The Record Quarter: What Drove It
- Export engine: Q1 export revenue grew 76% YoY and 12% QoQ, driven by wallet share gains with existing customers and new OEM customers added over the past two quarters; growth remained strong across all key geographies.
- Specialized wire dominance: Specialized wire revenue grew at a record 113% YoY, versus 62% in FY26, driven by higher CTC contribution and exports; CTC's contribution to total revenue reached record levels in the last several years.
- Volume growth: Q1 volume of just under 8,000 metric tons represented 30% YoY growth and 5% QoQ growth; specialized wire volume significantly outpaced standard wire volume growth.
- Utilization lift: Consolidated utilization improved to ~73.5% in Q1 from 70% in Q4 FY26 on unchanged capacity of 43,445 metric tons.
- Order delays: A few transformer OEM customers in active capacity expansion mode delayed picking up orders by a few weeks due to bottlenecks in making new facilities operational; management believes this will normalize.
Hegde: "We do, however, believe that this will normalize as soon as they are able to resolve the bottlenecks and make their new facilities operational."
EBITDA Per Ton: The ₹93,000 Question
- The headline number: Q1 EBITDA per ton of ~₹93,000 compared with ₹74,000 in Q4 and ₹66,000 a year ago, driven by record CTC contribution, higher export contribution, improved utilization, and a persistent weaker rupee.
- Mix was the dominant driver: Management attributed the main impact to mix and higher CTC contribution, with CTC reaching historically record levels within specialized wires; all three factors (inventory gains, value mix, operating leverage) contributed, but management declined to give a full breakup.
- New customer pricing helped: Some new customers executed in Q1 were onboarded at higher value addition than existing customers because the company had opportunity to link pricing to market price rather than pre-negotiated rates.
- Standard wire improvement: As standard/round wire capacity utilization went up, EBITDA per metric ton of standard wires improved marginally from earlier quarters.
- Higher kV mix: Quantity of higher value-added products (765 kV class) was higher compared to both earlier quarters.
- The normalization caveat: Record CTC contribution was partially driven by front-loading of Phase 1 capacity addition towards specialized wires; expected to normalize to previous levels over the next two to three quarters as Phase 2 completes.
Chopra: "In this particular quarter, the contribution from CTC reached historically record levels, and that was a much bigger driver of the higher EBITDA per ton than any of the individual components."
The ₹75,000 Anchor: Comfort, Not Commitment
- The stated level: Management feels comfortable with ₹75,000 per ton for the remainder of FY27, or for the full FY27, though actual performance will depend on product mix, exports, and currency.
- Explicitly not guidance: Management stated clearly that ₹75,000 is a level they are comfortable delivering, not a number they are committing to deliver.
- Long-term framing: ₹75,000 per ton was also described as a "long-term sustainable EBITDA" level.
- Mix shift mechanics: EBITDA will grow on an absolute basis for both CTC and non-specialized/standard businesses; mix shift may lower average EBITDA per ton as standard wire capacity comes in.
- Higher value-added support: Quantities of higher specialized value-added products expected to go up, helping sustain or improve EBITDA going forward; above 25% of overall CTC volume from large power transformers expected to continue holding.
Chopra: "We have mentioned that this is not a, a guidance in that this is a number we are going to deliver. We have said that 75,000 is a level we are comfortable delivering."
Capacity Expansion: Phase 2 and Beyond
- Phase 2 timeline: Phase 2 of Supa expansion expected to be complete by end of FY27, bringing installed capacity to roughly 59,000 metric tons, making KSH the second largest winding wire manufacturer in India.
- Next wave: Remaining Phase 2 capacity expected to be completed by March 2027; next wave of capacity expected to be added in Q2 FY27.
- Phase 2 capex: Large part of the ₹150–160 crore phase two project cost has been incurred, with some sitting in advances.
- Upcast commissioned: Last week completed commissioning of upcast backward integration facility in Chakan; 5,000 metric tons capacity to recycle own copper scrap, expected to provide modest operating efficiency and strengthen sustainability efforts.
- Upcast contribution minimal for now: Upcast capacity came up only in the last month, so current-year benefit is minimal ("a few rupees to the bottom line, to the gross profit") because capacity relative to total is not high.
- Land acquisition authorized: Board last night authorized management to evaluate acquiring an additional 10 acres of land within Supa MIDC for long-term expansion requirements.
- Beyond 59,000 tons: Additional 10,000–12,000 tons possible on existing land; new 10-acre plot is for expansion beyond that.
- Expansion trigger: Management will start thinking about future capacity expansion once utilization reaches 85% on the installed base.
- No quarterly timeline: Management declined to commit to Q2/Q3 FY28 timing for capacity expansion decisions, saying "get the 59,000 installed, and then start pushing that utilization up."
Chopra: "I think when we see utilization rates on the fully installed base trending up, we will start looking at which machines we need under which products, and at that point in time we will be able to give you, it's Q2, Q3 '28 is four, six quarters away. So, I don't think on a quarterly basis we'll be able to provide you any specific timelines."
Hitachi and the OEM Supply-Lock Trend
- Five-year framework: Entered into a five-year supply framework agreement with Hitachi Energy Global to supply winding wires to their Indian plants as well as some of their global plants; details still being finalized.
- Scope: Covers specialized winding wires: CTC, paper-insulated, and enamel-insulated rectangular conductors.
- No quantities or prices yet: Broad construct decided but no quantity or price defined yet.
- EBITDA expectation: Expected to be similar to company average; five-year agreement may include clauses that could move EBITDA per ton going forward, but work in progress; management confident they can "maintain it."
- Broader OEM trend: Multiple OEMs are in ongoing discussions to lock in capacity given global transformer manufacturers' 3–4 year order books; management will report back when more agreements are finalized.
Hegde: "Long-term agreements such as this further improves visibility for us to ramp up utilization as we complete the Phase 2 expansion at Supa."
Demand Environment: T&D, EV, and Localization
- T&D demand: Volumes expected to remain strong going forward; customer capacity additions coming every year, some this financial year, some around 2029.
- EV demand: 2-wheeler and 3-wheeler winding wire demand "very, very strong"; passenger car and bus meaningful volumes expected around FY28–FY29; company needs to be part of programs now to supply when they mature.
- BIS-driven localization: BIS implementation shifting standard wire supply base from imports to Indian companies, creating localization opportunity.
- Data center demand: Data centers require transformers (higher kV and distribution) and UPS systems, representing potential markets for both special and standard winding wires.
- Standard wire growth: Standard wire revenue grew 83% YoY in Q1, similar to 80% in Q4; domestically added a number of standard wire clients as capacity ramped up in Supa; focus is on select end-user industries (EVs, AC compressors, motors, alternators for DG sets) where precision technology plays a critical role.
- Export share target: Over time (not specifically FY27), target is to increase export share back to historical peak of ~40% of total revenue.
- Future capacity mix: Future capacity additions will include more standard wire and some special wire for EV; CTC capacity is already available for rest of the year and is the focus for utilization.
Working Capital and Balance Sheet
- Five more days: After a five-day average working capital day improvement in Q4, improved by another five days in Q1, resulting in 60 days average working capital days vs 71 days a year ago.
- Drivers: Progress on both payables (five-day improvement) and receivables (two-day improvement) vs Q4; inventory days flat given nature of business.
- Target: Aim to reach 30–35 net working capital days, consistent with industry standard; described as "fairly achievable"; multi-quarter process, not multi-year.
- Interest expense: Q1 interest cost rose to ~₹17 crores because turnover went up significantly versus Q1 prior year, requiring higher working capital borrowing; cost of capital itself has not gone up.
- Operating cash flow goal: Goal of being operating cash flow positive even in a high-growth environment; will keep looking for further efficiencies over the next several quarters.
- Copper pass-through mechanism: Business is make-to-order with value addition contracts; copper is booked at LME price upon purchase order receipt, and that becomes the invoice price for the copper portion, insulating the company from copper price and exchange rate fluctuations; manufacturing takes 15–20 days after order.
Hegde: "We do this because we want to insulate ourselves from the copper price as well as the exchange rate as well."
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Phase 2 completion | Installed capacity reaches ~59,000 metric tons | End of FY27 (March 2027) |
| CTC mix normalization | CTC contribution reverts to previous levels as Phase 2 completes | Next two to three quarters |
| EBITDA per ton comfort | ₹75,000 per ton (explicitly not committed guidance) | Full FY27 |
| Volume growth | Trailing 12-month volume growth of 26% sustained for full year | FY27 |
| Working capital days | Reach 30–35 net working capital days | Multi-quarter process |
| Export share | Return to historical peak of ~40% of total revenue | Over time, not specifically FY27 |
| Capacity expansion trigger | Begin planning additional capacity when utilization reaches 85% | Conditional on utilization |
| Hitachi framework update | Provide update when in a position to do so | No date |
Key Metrics
| Metric | Q1 FY27 |
|---|---|
| Revenue from operations | ₹1,164 crores, +108% YoY |
| EBITDA | ₹74.4 crores, up from ₹40.3 crores in Q1 FY26 and ₹56.3 crores in Q4 FY26 |
| EBITDA per ton | ₹93,000 per metric ton, up from ₹66,000 a year ago and ₹74,000 in Q4 FY26 |
| PAT | ₹42.2 crores, quarterly record, +86% YoY and +22% QoQ |
| Sales volume | ~8,000 metric tons, +30% YoY and +5% QoQ |
| Specialized wire revenue growth | +113% YoY, compared to +62% in FY26 |
| Standard wire revenue growth | +83% YoY, similar to +80% in Q4 FY26 |
| Export revenue growth | +76% YoY, +12% QoQ |
| Export share of revenue | ~27% of operating revenue excluding other operating revenue |
| Installed capacity | 43,445 metric tons, unchanged QoQ |
| Capacity utilization | 73.5%, up from 70% in Q4 FY26 |
| Working capital days | 60 days, improved from 65 days in Q4 and 71 days in Q1 FY26 |
| CTC share within specialized wires | 50% to 75% of segment |
| 765 kV and HVDC share of CTC volume | Above 25%, consistent for last 2–3 quarters |
| Supa expansion completed | 14,400 metric tons of scheduled 30,000 metric tons |
| Upcast facility capacity | 5,000 metric tons, commissioned in Chakan |
| FY27 EBITDA per ton outlook | ₹75,000 per ton, level management is comfortable sustaining |
| Trailing 12 months volume growth | 26% |
| Trailing 12 months EBITDA per ton | ₹74,000 |
| Phase 2 project cost | ₹150–160 crores, part funded through IPO proceeds |
| Interest cost range on working capital products | 6% to 9.5% |
| LME copper price range | $10,000 to $14,000 per metric ton |