Key Takeaways
- Triple-digit growth, structurally higher margins: Standalone total income rose 104% YoY and PAT rose 120% YoY, while EBITDA margin expanded 418 bps to 33.77% as value-added products, the slurry pipeline, and operating leverage permanently lifted profitability.
- The mix shift is the margin story: Value-added products (pellets, DRI) grew from 20% to 32% of standalone revenue and from 11% to 30% of EBIT, reducing earnings volatility even as iron ore realizations move with the steel cycle.
- Thriveni delivered a step-change in profitability: EBITDA nearly doubled to INR1,990 crores, with margins expanding from 16% to ~25%, driven by iron ore ramp-up, better equipment utilization, and cost discipline.
- The capex cycle is accelerating into FY27–28: Standalone capex of INR10,000–INR11,000 crores is guided for FY27, rising to INR12,500 crores+ in FY28, with the steel plant, BHQ beneficiation, copper scale-up, and second slurry pipeline all in motion.
- What to watch next quarter: BHQ construction milestones against the December 2027 deadline, the pace of Chemaf copper-cobalt ramp toward meaningful production by July 2027, and whether pellet realizations stabilize as new markets absorb the higher volumes.
The Margin Transformation: From Mining to Value-Added Products
- Structural margin uplift, not cyclical: Standalone EBITDA margin reached 33.77% for FY26, up 418 bps YoY, and Q4 margin hit 33.73%, up over 1,000 bps YoY. The improvement is built on higher share of pellets and DRI, slurry pipeline cost savings flowing into the P&L, better utilization across mining, pellets, and DRI, and operating leverage from volume scale.
- Pellets proved the model: Plant 1 hit 100% capacity utilization within four months of commissioning, producing 0.3 crore tons in nine months at an EBITDA of INR4,040 per ton, nearly 2.1x the INR1,930 per ton earned on iron ore. Realization was INR9,590 per ton.
- DRI added another layer: Sales volume rose 56% YoY to 480,000 tons, with realization of INR27,306 per ton and EBITDA of INR7,999 per ton, further concentrating the value chain.
- Pellet realizations softened sequentially as higher volumes forced the company to search new, more distant markets, some tenders were not re-established, and more material was exported. This is a volume-absorption risk that comes with the ramp-up.
- The second pellet plant was commissioned in May 2026, taking total capacity to 0.8 crore tons per annum. Debottlenecking studies are underway, with government permissions expected by FY27 year-end, targeting a combined 1 crore tons capacity thereafter, though management gave no formal guidance on that timeline.
Rajesh Gupta: "In the last 5 years, our CAGR on revenue is up by 109%. And on PAT, the CAGR is a whopping 139%. This shows that we are a 50-year-old start-up."
Thriveni: The Second Engine Fires
- Profitability nearly doubled: Thriveni EBITDA rose to INR1,990 crores in FY26 from INR1,062 crores in FY25, with margins expanding from ~16% to ~25%. Q4 was particularly strong at INR910 crores EBITDA and 36% margins, driven by better operating leverage, higher equipment utilization, and cost discipline.
- Iron ore drove the improvement: The margin expansion came from iron ore ramp-up, while coal volumes are being deliberately slowed due to lower margins.
- Odisha operations scaling fast: Gwalior mine capacity enhanced to 0.9 crore tons per annum; Sarojini Pradhan mine scaled to 0.49 crore tons. Two new mines, Dalpahar (target 0.3 crore tons) and Lasarda-Pacheri (target 0.15 crore tons), are expected to commence operations in Q1 FY27. Combined Odisha volumes are expected to rise 39% YoY to 3.4–3.5 crore tons in FY27.
- Coal operations earned top recognition: PB West ranked #1 among 383 open cast mines by the Ministry of Coal, with record overburden removal, coal production, land acquisition of 420+ acres (103% of target), and housing for 1,400+ families (143% of target).
- Indonesia rationalization underway: Lower-margin Indonesian operations are being wound down, with equipment redeployed to higher-return opportunities in Congo and PNG.
- Geomysore gold mining commenced in January 2026 under an MDO and exploration contract, with targeted EBITDA contribution of ~INR60 crores in FY27.
- Receivables jumped on consolidation, not stress: Consolidated receivables rose from INR171 crores to INR1,480 crores because Thriveni was consolidated for only nine months this year versus not at all last year. Thriveni’s standalone receivable days are 15–30 days, and 15 days in coal.
BHQ Beneficiation: The Next Margin Lever
- Phase 1 targets December 2027: The beneficiation plant will take 3 crore tons of low-grade BHQ input and produce 1.2 crore tons of high-grade output, unlocking a structural cost and revenue advantage. Land is acquired, construction equipment is mobilized, crushing of material has started, and 85–90% of main equipment ordering is complete with top-tier suppliers.
- The economics are compelling: Management estimates a cost upside of INR200–INR300 per ton from reduced royalties on lower-grade ore under a new government notification, plus a selling-price or internal-use upside of INR700–INR800 per ton. Overall EBITDA is expected to rise once BHQ is commissioned.
- This is a trailblazer project with no domestic precedent at this scale, and management frames it as central to greening the company within the steel cycle.
Rajesh Gupta: "The cost upside is around INR200, INR300… The upside on the selling price or on the usage level, even if we do it internally, will be at INR700, INR800. So we think that the EBITDA will go up once the BHQ is commissioned."
Copper: Building the Third Leg
- Surya mine is producing, but below capacity: The 12,000 tons per annum copper cathode plant in Congo was commissioned in March 2026 and has produced ~700–750 tons since. The plant can do 40–45 tons per day, but sulfuric acid shortages in the landlocked location have constrained volumes. Synergy with Chemaf’s sulfuric acid plant is expected to resolve this.
- Chemaf acquisition adds scale and operational control: Lloyds acquired a 49% stake with operational control, securing a large operating copper-cobalt platform in the Katanga copper belt with 50+ permits. Debt settlement agreements with key creditors have been reached, with USD47.5 crore of debt negotiated down and the remaining USD33 crore structured as non-recourse.
- The ramp-up pathway is defined: Surya is expected to produce ~9,000–10,000 tons in FY27. Chemaf is targeting meaningful production by July 2027, eventually reaching ~5,500–6,000 tons per month. Combined with Surya, total copper production would reach ~8,000 tons per month. Cobalt capacity is expected to scale to ~20,000 tons across two operating plants. The ambition is 100,000 tons of copper over the next three to five years from both assets.
- Capex is material but not yet precise: Management gave a broad estimate of 20-26 crore for incremental copper and cobalt capex but stated, "We are still working on the exact numbers." The majority of copper investment falls in FY27, with revenues and profitability expected from FY28.
- The Congo plant is ~85–90% complete, and the company is engaging world-class EPC players to resume work, aiming to get them back on the ground within the month.
Rajesh Gupta: "Copper, which is a new gold and Congo, which is our new Surjagarh is led by Surya."
Logistics Transformation: INR2,000 Crores in Annual Savings
- The slurry pipeline is already delivering: The 85-kilometer pipeline was commissioned and is contributing cost savings and operational stability.
- Phase 2 targets the big prize: A 195-kilometer pipeline from Hedri to Ghugus via the Chandrapur stockyard is in advanced planning. It will eliminate trucking for 1.6 crore tons of material, saving INR500–INR600 per ton, or over INR1,000 crores annually from that segment alone. The entire capex is to be completed within two years.
- Total logistics and sustainability savings are expected to surpass INR2,000 crores per annum as all initiatives, including pipelines, solar projects, and other green measures, mature by March 2028.
- The LNG hybrid conversion of a 100-ton diesel dumper at Surjagarh signals the operational commitment to cost and sustainability.
Steel Plant: Vertical Integration Nears
- Commissioning is imminent: The blast furnace, arc furnace, coke oven, and 0.12 crore tonne wire rod mill are scheduled for commissioning in the last quarter of FY27.
- FY28 is the first full-production year: Management expects the steel plant to operate at 75–80% of capacity, producing 0.1 crore tons, alongside 0.8–0.9 crore tons of pellets and corresponding DRI and pig iron volumes.
- A third pellet plant is in advanced engineering in Chandrapur, adding further capacity downstream.
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Iron ore production | 2.6 crore tons production, 2.7 crore tons dispatches | FY27 |
| Pellet production | 0.78–0.8 crore tons | FY27 |
| DRI production | 825,000 tons | FY27 |
| Wire rod mill production | ~150,000 tons (first partial year) | FY27 |
| Odisha volumes (Thriveni) | 3.4–3.5 crore tons, up 39% YoY | FY27 |
| Dalpahar mine operations commence | Target 0.3 crore tons production | Q1 FY27 |
| Lasarda-Pacheri mine operations commence | Target 0.15 crore tons production | Q1 FY27 |
| Geomysore gold EBITDA contribution | ~INR60 crores | FY27 |
| Standalone capex | INR10,000–INR11,000 crores | FY27 |
| Consolidated capex | ~INR15,000 crores | FY27 |
| Standalone capex | INR12,500 crores+ | FY28 |
| BHQ beneficiation plant Phase 1 | 3 crore tons input, 1.2 crore tons output | December 2027 |
| Steel plant commissioning | Blast furnace, arc furnace, coke oven, wire rod mill | Last quarter FY27 |
| Surya copper production | ~9,000–10,000 tons | FY27 |
| Chemaf meaningful copper production | ~5,500–6,000 tons per month at full scale | July 2027 |
| Combined copper target (Chemaf + Surya) | 100,000 tons | 3–5 years |
| Cobalt capacity (Chemaf) | ~20,000 tons across two plants | No date; scaling underway |
| Annual logistics and sustainability savings | Surpass INR2,000 crores per annum | By March 2028 |
| Slurry pipeline Phase 2 | Entire capex completed | Within 2 years |
| Thriveni debt reduction | INR2,000 crores automatically repaid | Over next 3 years |
| Debt-to-EBITDA target | 1–1.5x | Ongoing; no equity planned in near future |
| Pellet plant debottlenecking permissions | Expected; enables increased production | FY27 year-end |
Key Metrics
| Metric | Q4 FY26 / FY26 |
|---|---|
| Standalone total income | ₹4,977 cr, +310% YoY |
| Standalone EBITDA | ₹1,679 cr, +498% YoY |
| Standalone PAT | ₹1,066 cr, +368% YoY |
| Standalone EBITDA margin | 33.73%, improved more than 1,000 bps YoY |
| Full-year standalone total income | ~₹13,838 cr, +104% YoY |
| Full-year standalone EBITDA | ₹4,673 cr, +133% YoY |
| Full-year standalone PAT | ₹3,194 cr, +120% YoY |
| Full-year standalone EBITDA margin | 33.77%, up 418 bps YoY |
| Consolidated revenue | crossed ₹17,000 cr |
| Consolidated PAT | ₹3,829 cr |
| Return on capital employed (ex CWIP) | 56% for FY26 |
| Return on equity | 37% for FY26 |
| Iron ore production | 0.91 cr tons in Q4, +529% YoY; 2.2 cr tons for FY26, +120% YoY |
| Iron ore sales volume | 0.62 cr tons in Q4, +271% YoY; 1.62 cr tons for FY26, +71% YoY |
| Iron ore realization per ton | ₹5,848 in Q4; ₹5,806 for FY26 |
| Iron ore EBITDA per ton | ₹1,894 in Q4; ₹1,930 for FY26 |
| Pellet production | 0.11 cr tons in Q4; 0.3 cr tons for FY26 (plant commissioned fag end of Q2) |
| Pellet realization per ton | ₹9,590 in Q4 |
| Pellet EBITDA per ton | ₹4,040 in Q4 |
| DRI sales volume | 188,000 tons in Q4, +171% YoY; 480,000 tons for FY26, +56% YoY |
| DRI realization per ton | ₹27,306 in Q4 |
| DRI EBITDA per ton | ₹7,999 in Q4 |
| Value-added products share of standalone revenue | 32% in FY26, up from 20% in FY25 |
| Value-added products share of EBIT | 30% in FY26, up from 11% in FY25 |
| Standalone net debt | ₹3,901 cr as on 31st March 2026 |
| FY26 standalone capex | close to ₹8,100 cr |
| Total capex invested (FY24–FY26) | ₹13,500 cr; of which ₹5,100 cr capitalized, ₹1,850 cr capital advances, rest CWIP |
| Thriveni FY26 total income | ~₹7,997 cr |
| Thriveni FY26 EBITDA | ₹1,990 cr; margin ~25%, up from ~16% in FY25 |
| Thriveni Q4 FY26 EBITDA | ₹910 cr; margin 36% |
| Thriveni FY26 cash PAT | ₹1,196 cr; PAT margin ~15% |
| Surjagarh environmental capacity | 5.5 cr tons per annum, increased from 1 cr tons |
| FY27 iron ore production guidance | 2.6 cr tons |
| FY27 iron ore dispatches guidance | 2.7 cr tons |
| FY27 pellet production guidance | 0.78–0.8 cr tons |
| FY27 DRI production guidance | 825,000 tons |
| FY27 wire rod mill production guidance | ~150,000 tons |
| Annual cost savings expected by March '28 | surpassing ₹2,000 cr per annum |
| FY27 consolidated capex guidance | ~₹15,000 cr (standalone ₹10,000–₹11,000 cr, Thriveni ~₹1,000 cr, copper ~₹2,000 cr) |
| Target net debt-to-EBITDA | 1–1.5x |
| Surya copper plant capacity | 12,000 tons per annum; commissioned March 2026 |
| Copper produced at Surya as of call date | ~700–750 tons |
| FY27 copper production target (Surya) | ~9,000–10,000 tons |
| CHEMAF expected commercial production start | July 2027 |
| CHEMAF full capacity copper production | ~90,000 tons per annum |
| CHEMAF cobalt capacity expected | ~20,000 tons in 2 operating plants |
| Copper capacity target (CHEMAF + Surya) | 100,000 tons over next 3 to 5 years |
| CHEMAF total plant capex | ~$1.1 bn; $800 mn+ already spent; additional $200–$260 mn required |
| CHEMAF debt on books | ~$80 cr; negotiated reduction of $47.5 cr; remaining non-recourse debt ~$33 cr |
| BHQ beneficiation first phase readiness | December 2027; 3 cr tons input, ~1.2 cr tons output |
| BHQ beneficiated ore grade | 66%–67% |
| Odisha operations FY27 volume growth | 39% YoY to 3.4–3.5 cr tons |
| Thriveni FY27 volume growth (including BHQ) | more than 75% |
| Geomysore Gold Mining targeted FY27 EBITDA | ~₹60 cr |
| PB West coal production (FY26) | 1.75 cr tons |
| PB West OB removal (FY26) | 7.28 cr BCM |