- Volume up, revenue down: Standalone revenue fell 3% QoQ despite 7.5% volume growth, as prices declined and product mix shifted away from higher-margin export OEM.
- Export OEM still hostage to chips: Export OEM quantity dropped from 4.5 to 3.5 lakh meters QoQ because automakers continue routing scarce chips to higher-profit models, starving Mayur’s existing programs.
- The pipeline is the story: BMW regular supply confirmed for February 2024 at ~₹4 crores/month, new model wins across domestic and export auto, and a stated ambition to 2.5x export volumes in two years.
- Margins under double pressure: Falling PVC prices mean high-cost inventory is still flowing through, while competitive intensity forces immediate price cuts; management expects stabilization in one to two quarters.
- What to watch next quarter: Whether export OEM volumes begin recovering as guided, the pace of new-model ramp-ups, and any margin relief as lower-cost raw material inventory starts flowing through.
Export OEM: The Chip Shortage Drag
- The mechanism: Automakers facing chip shortages prioritize chips for models with higher profit margins, reducing or halting production of other models. Mayur’s existing programs sit on the losing side of that allocation, so volumes fall even when underlying demand is intact.
- The diversification answer: Management is actively qualifying for more models across more OEMs so that no single model shutdown can crater volumes. New model wins have already been secured, with supply starting in FY23-24 and FY24-25.
- Chrysler tier-1 expansion: Previously supplying through 2 tier-1 manufacturers; now adding 2 more, which will increase sales to that program.
- Ford RFQs: Three RFQs received from Ford; pricing is underway. If won, volume will add but will take at least one year to materialize.
Management: "The problem is the chips problem is still going on and all the car manufactures they are using those chips on the models where they make more money. Net profit items they are reducing when they have a shortage, so that is why it is happening."
The BMW Ramp & New Model Pipeline
- BMW: Already approved and supplying ~4,000 meters/month through a Thailand vendor. Regular direct supply of ~40,000 meters/month expected from February 2024 (last quarter FY24), translating to at least ₹4 crores/month in business, roughly 10x the current pilot run-rate of ~₹33 lakhs/month.
- Mercedes and Volkswagen India: Already approved; supply started to both for their modules. Mayur is the sole supplier to Volkswagen India.
- Hyundai/Datsun: Cell agreement signed with Datsun India for supplies to Hyundai Motors plants within and outside India; supply started in India in the June quarter.
- High-solid PU automotive win: One item sanctioned from a motor customer; their Malaysia plant has already started buying at $22–$23 per meter. Supply to begin from January at 25,000 meters/month. An American factory is also trialing the product; if successful, an additional 25,000 meters/month expected in 6–9 months. Combined PU automotive potential: 60,000–70,000 yards/month within 6 months to 1 year, or ~₹9 crores/month.
- Timeline caveat: BMW supply was earlier expected in Q4 FY23 but has been pushed to 2024. Management declined to explain the delay, calling it difficult to pinpoint reasons in automotive, but stated the timeline is now 100% confirmed with the order received and supply must start by the last quarter of FY24.
Management: "It is difficult to say any reason for automotive business and when they keep on changing sometime suppose they told for after 1 year but starts early itself, whatever information we are getting accordingly we are trading. This is now confirmed 100% we have got the order also, but by 2024 first quarter we have to start supplying."
Domestic Auto & Footwear
| Segment | Trend | Commentary |
|---|---|---|
| Domestic auto OEM | ▲ Strong growth | Volume up 18% QoQ, value up 19% QoQ, driven by improving chip availability and strong festive demand in October. Growing 15–20% every year automatically, though margins are low. |
| Auto replacement | ▲ Strong growth | Quantity increased 30% QoQ. |
| Footwear domestic | ▼ Slightly lower | Volumes at 22 lakh meters vs 23.80 lakh meters in Q1. November expected down due to post-Diwali labor shortages and festive stock buildup; pickup from December third week, with January much better as 2023 models launch. |
Margins: The Price-Cost Squeeze
- The raw material lag: When PVC and resin prices fall, Mayur carries high-cost inventory that takes time to work through. Margins are compressed until lower-cost material enters production, a lag management expects to persist for one or two more quarters.
- The competitive pass-through: In the Indian market, manufacturers immediately reduce prices when raw material costs fall to gain business. Mayur partially insulates itself by focusing on top-range quality products and specific quality-conscious buyers, but cannot fully escape the dynamic.
- Export OEM margin structure: Auto OEMs are intensely competitive with many players, structurally limiting margins in that segment. The margin uplift from export OEM volume growth comes from mix and scale, not from high per-unit margins.
- Stabilization path: Management expects margins to improve after one or two quarters as lower-cost inventory flows through and PVC prices stabilize, but declined to give a specific stabilized margin number, calling it “very difficult to tell about margins in advance.”
Management: "The problem in Indian market is where so many Indian manufactures who supply to this OEMs and then whenever the price is down they immediately reduce the prices to get more and more business but this does not happens, get the business once."
New Initiatives: Lamination, Perforation, Polishing, PU
- Flame lamination line: Forward integration now operational in own plant, allowing direct supply of laminated material to customers instead of them using third-party laminators. Management declined to quantify the realization or margin uplift, saying it depends on thickness and density.
- Perforation expansion: New perforation machine ordered from Europe, expected delivery in ~6 months, driven by increasing demand.
- Polishing business: Recently launched; 220 dealers already onboarded, targeting 1,000. Current sales ~15,000 meters/month with good margins. Within 2 years, expects to start importing in this segment also.
- PU business headwinds: Gwalior plant faced problems with under-invoicing and misdeclaration, where PU was cleared as PVC to avoid ₹46/meter anti-dumping duty. Situation improving slowly.
- Furnishing material reselling: A longer-term build expected to take 3–4 years, carrying 30–40% margins but ramping gradually.
Competitive Positioning & Pricing
- The quality premium: Management argues Mayur earns better margins than peers because it focuses on top-range products. Per management, top-5 industry players in India show PBT of only 5–6%, while Mayur’s PAT margin was 14% this quarter.
- Pricing is half raw material, half demand-supply: Falling global demand is driving PVC, resin, and plastic fiber prices down. When demand is good, pricing power exists; when demand is weak, it does not, regardless of input costs.
- Geographic shift: Even with European and Far East companies setting up plants in India, management believes business will shift to Asian countries. Mayur’s auto OEM has grown 15–20% every year for the last 3–4 years despite competitive intensity.
- Market share opacity: When asked about market share in footwear and auto and how it might change with new competition, management deflected, saying market share will increase or decrease and “we cannot say, because competition is more,” without providing any figures.
Management: "Nowadays, the price is not dependent totally on raw material. The prices are dependent on demand and supply, how is your demand? If the demand is good, you better get better price, if demand is less, then you won't get a better price."
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| BMW regular supply | ~40,000 meters/month, at least ₹4 crores/month | February 2024 (last quarter FY24) |
| Export OEM volume | 2.5x current levels, minimum 300,000 yards/month (other than current business) | By FY24-25 |
| New model supply start | Newly awarded models across export and domestic auto OEM | FY23-24 and FY24-25 |
| Margin stabilization | Improvement as lower-cost RM inventory flows through and PVC prices stabilize | One to two quarters |
| Chip shortage recovery | Export OEM to come in line | Next 1–2 quarters |
| Perforation machine delivery | New machine from Europe | ~6 months |
| PU automotive scale | 60,000–70,000 yards/month (~₹9 crores/month) | 6 months to 1 year |
| Polishing business import | Begin importing in the segment | Within 2 years |
| Overall volume growth | 15% per year; reaching 1 crore meters | By FY24-25 |
| Ford RFQ materialization | If won, volume addition | At least 1 year |
Key Metrics
| Metric | Q2 FY23 |
|---|---|
| Consolidated revenue | ₹204.51 cr, up 2% QoQ |
| Standalone revenue | ₹194.5 cr, down 3% QoQ |
| Consolidated PBT | ₹35.09 cr, up 4% QoQ |
| Standalone PBT | ₹32.47 cr, down 10% QoQ |
| Consolidated PAT | ₹27.17 cr, flat QoQ |
| Standalone PAT | ₹25.39 cr, down 11% QoQ |
| PAT margin | 14% |
| Total volume sold | 75 lakh meters, up 7.5% QoQ from 70 lakh meters |
| Domestic auto OEM volume | 14.69 lakh meters, up 18% QoQ in volume and 19% QoQ in value |
| Domestic auto OEM volume growth | ~30% QoQ in domestic auto section |
| Auto replacement volume growth | 30% QoQ in quantity |
| Export auto volume | ~1,15,000 meters per month, down from 1,50,000 yards per month due to chip shortage |
| Export auto share of total sales | ~13% by value |
| Export general share of total sales | ~10% |
| Total exports share of sales | 22–23% |
| Footwear domestic volume | 22 lakh meters, down from 23.80 lakh meters in Q1 |
| Footwear share of sales | 25% in the last quarter |
| Export volume change | Down 21% QoQ |
| Export general volume growth | 4.5% QoQ |
| BMW current supply | ~₹33 lakhs per month, ~4,000 meters per month at €10 per meter |
| BMW expected regular supply | ~40,000 meters per month from February 2024 |
| Flame lamination CAPEX | ~₹3 cr |
| Export OEM target by FY25 | Minimum 3,00,000 yards per month, up from 1,10,000–1,15,000 yards per month currently |
| High-solid PU expected volume from Malaysia | 25,000 meters per month from January, at ~$22–$23 per meter for the material |
| Polishing business current dealers | 220 dealers, current sale ~15,000 meters per month |