Key Takeaways
- FY26 delivered a sharp earnings inflection: PAT rose 53.4% to INR 38.25 crores on 23% revenue growth, with Q4 PAT more than doubling YoY as operating leverage kicked in.
- Export demand is surging, especially from the US and Europe: US exports jumped nearly 50%, while European customers are actively looking to divert sourcing from China to India, flooding the company with RFQs.
- A multi-year new-business pipeline is now visible and quantified: Management disclosed over INR 80 crores in combined Bi-Metal and Alkop pipelines, plus a PTFE bush order that could add 7 lakh pieces per month once fully productionized.
- Margins are structurally defended and guided higher: EBITDA margins held at 20-22% for years through raw material cycles, and management now expects at least 15 bps improvement next year, with Q4 already printing 25% on operating leverage.
- What to watch next quarter: Whether the dynamometer arrives by end-August to unlock railway business, the pace of PTFE bush order conversion after the VP visit, and any sign that Alkop’s delayed sample approvals are finally converting to production volumes.
Earnings Inflection & Operating Leverage
- Full-year PAT surge: Consolidated PAT reached INR 38.25 crores, up 53.41% YoY, while Q4 PAT jumped 108.55% YoY, described as "particularly too strong." EPS moved from INR 4.45 to INR 6.83.
- Revenue crossed INR 300 crores: Total income grew 23.16% YoY, driven by operational efficiencies and focused market expansion.
- Q4 margin spike to 25%: The quarter benefited from operating leverage as capacity utilization rose: Bi-Metal at 85%, Aluminium at 60%, and brakes volumes increasing. Fixed costs stayed flat while variable costs rose only modestly, pulling total cost of production lower.
- Interest cost drag from export working capital: High interest expenses reflect US export debtors with turnaround times exceeding 180 days; exports increased substantially, adding over INR 3 crores to the interest line. A new PCFC facility of INR 25 crores at 4.70% (versus 8%) is expected to reduce this burden.
- Labour code impact already absorbed: New labour code regulations issued April 2025 triggered proactive provisioning in the previous year, so no further liability remains for past periods.
Aradhye: "Precisely, what we have estimated is more than INR 360 crores."
Export Demand & Geographic Shifts
- US exports up nearly 50%: The US market delivered substantial growth, though it also drove the working-capital interest drag from long debtor cycles.
- Europe inquiry surge is a structural shift: European customers are actively looking to divert volumes from China to India, generating what management called an overwhelming volume of RFQs. The company expects Europe to become a meaningful share of exports within 2-3 years.
- Africa disruption absorbed without net damage: Exports to Africa via Dubai were halted for three months due to West Asia port congestion, losing INR 2 crores of business. This was fully compensated by a INR 6 crore order from a merchant exporter shipping directly, with advance payment.
- Export mix supports margin expansion: More than 50% of the new business pipeline is exports, where margins are better than aftermarket or domestic OEM. Management expects this mix shift to drive at least 15 bps of margin improvement next year.
- Ex-works share targeted higher: The company aims to move from 80% to 90% ex-works terms; Arun Aradhye is visiting the US and Canada next month to negotiate this shift.
Aditya Menon: "Touch wood last six months, we have got so many inquiries, we are getting overwhelmed by so much RFQs that are coming towards us."
New Business Pipelines: Bi-Metal, Alkop & PTFE
- Bi-Metal pipeline exceeds INR 50 crores: 28-30 customers are in the pipeline with RFQs received, commercials finalized, and samples sent or approved. This business is expected to materialize over the next two years.
- Alkop pipeline of INR 30 crores: 51 new parts across John Deere (domestic and export), Eaton, Taco Prestolite, and Mayekawa are under development, with some approved and some in commercial discussions. These will be productionized this year and partly next year.
- PTFE bush breakthrough: After 3-4 years of R&D, the company has perfected PTFE technology. One part sample has been approved by a European customer, with the Vice President visiting Pune facilities on the 26th. A first order of one lakh bushes per month is expected within a month or two, with six more parts likely productionized this year at a combined volume of six lakh pieces per month.
- New business lead times are long: Bi-Metal takes roughly 9 months from start to order; Aluminium takes 12-14 months from RFQ to production start, with quantities ramping gradually. Today's growth reflects efforts from two years ago.
- Alkop growth has lagged but is now turning: Delays from war, raw material price increases, and Trump-era tariffs made customers slow. Samples were delivered later than planned because customers need roughly 800 parts from different suppliers for one engine. The last two quarters have seen parts moving into production, and management expects Alkop to contribute as much as Menon Bearings to the overall pie chart within two years.
Aditya Menon: "And last three, four years, Menon Bearings, we have, as a team working very hard on this technology. And finally, we have perfected it, I would say."
Margin Structure & Sustainability
- EBITDA margins held steady for 10-15 years: The company philosophy is sustainable growth: top-line growth may not have been aggressive, but EBITDA margins have remained consistent, with no customer exceeding 15% share.
- Raw material pass-through is formula-driven: Pre-decided formulas with raw material indexing allow the burden to be passed to customers. Management is working to reduce the pass-through lag from three months to monthly. One or two customers who resisted have left, and that transition will complete this quarter.
- Conservative full-year margin guidance: Management guided 20-22% EBITDA for the full year on a conservative basis, citing electricity, labour costs, and the new labour code. If external factors are favourable, margins should be higher. Q4's 25% print demonstrates what operating leverage can deliver.
- Alkop realization premium: Alkop's average realization is INR 700-750, versus INR 450-500 for competitors, reflecting roughly INR 200-250 more value addition per unit. This premium supports margin resilience as Alkop scales.
Aradhye: "I am 100% sure with the business in pipeline and so many actions that we have taken in the past so far as material consumption is here raw material prices are going up, we were successful in passing on that burden of raw material to the customers to the larger extent."
Capacity, Capex & New Verticals
- Capex plan is modest and internally funded: Menon Bearings (bearing and Bi-Metal) will invest INR 25 crores over two years; Alkop INR 7 crores; brakes INR 3 crores. Most will be financed through internal accruals.
- Alkop capacity can double quickly: A spare holding furnace allows capacity to double at any time. A new furnace will be needed next year when utilization reaches 90%.
- Dynamometer arriving by end-August: After two manufacturers failed to deliver, a partner has been found who can meet the specifications required for high-end railway parts like Vande Bharat. Once installed, railway and OEM business can begin.
- Railway entry is imminent: Registration with Indian Railways is complete, plant audits are done, and a vendor code number is pending only the dynamometer. Management expects railway to start at 5-10% of business in the near future and grow from there.
- Brakes entering new segments: The company has entered the two-wheeler and three-wheeler segments, with samples submitted to OEMs. A pipeline of almost INR 10 crores is expected over the next two years.
- EV exposure is growing: The company is a tier-two supplier to Tesla through concentric pumps, supplies to Eaton Transmission for Porsche e-mobility, and has entered Tata Motors for electric vehicle parts through Taco Prestolite, where it has grown from two parts to more than four with additional RFQs received.
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| FY27 revenue | More than INR 360 crores (exceeding earlier INR 350 crore guide) | FY27 |
| Revenue growth rate | 25% YoY | Next few years |
| Long-term revenue target | INR 500 crores | By 2028 |
| EBITDA margin | 20-22% (conservative); higher if external factors favourable | Next two years |
| Margin improvement | At least 15 bps improvement | Next year |
| Bi-Metal new business | More than INR 50 crores | Next two years |
| Alkop new business | INR 30 crores (51 parts) | This year and partly next year |
| Brakes new business | Almost INR 10 crores | Next two years |
| Alkop revenue | More than INR 120 crores | Next two years |
| PTFE bushes | First order of 1 lakh pieces/month | Within a month or two |
| PTFE bushes | Remaining 6 parts at 6 lakh pieces/month | Productionized this year |
| Dynamometer | Receipt and installation | By end-August |
| Railway business | Start at 5-10% of business | Near future (post-dynamometer) |
| Interest cost | Reduction via INR 25 crore PCFC facility at 4.70% | Ongoing |
| Asset turnover (brakes) | Target of 2 | Next year |
| Ex-works export share | Move from 80% to 90% | Under negotiation |
Key Metrics
| Metric | Q4 FY26 |
|---|---|
| Consolidated total income (FY26) | ₹300+ cr, +23.16% YoY |
| PAT (FY26) | ₹38.25 cr, +53.41% YoY |
| PAT (Q4 FY26) | +108.55% YoY |
| EPS (FY26) | ₹6.83, up from ₹4.45 in FY25 |
| EBITDA margin guidance | 20%–22% for next two years, conservative basis; Q4 FY26 was 25% |
| Revenue growth target | 25% YoY for next few years |
| FY27 revenue estimate | More than ₹360 cr, exceeding earlier ₹350 cr guidance |
| FY28 revenue target | ₹500 cr |
| Total assets | ₹267 cr |
| Asset turnover – bearings | 2 |
| Asset turnover – Alkop | 1.5, targeting 2 in the next year |
| Asset turnover – brakes | Almost 1, targeting 2 in the next year |
| Planned CapEx – bearings & Bi-Metal | ₹25 cr over next two years |
| Planned CapEx – Alkop | ₹7 cr |
| Planned CapEx – brakes | ₹3 cr |
| Exports growth (USA market) | ~50% YoY |
| Export share of total revenue | ~35%, with 80% of exports going to Europe |
| Ex-works export orders | 80% of export orders, remaining 20% under negotiation |
| Alkop QoQ growth (Q4 FY26) | ~25% |
| Alkop growth rate assumption (next 2 years) | 29% |
| Alkop capacity utilization | 65%, likely to reach 90% by end of FY27 |
| Alkop average realization | ₹700–750 per kilo, vs competitors' ₹450–500 |
| Alkop aluminium division margin | ~20%, vs competitors' 6%–8% |
| Bi-Metal capacity utilization | 85% |
| Bi-Metal segment mix – tractors | 35% of total revenue |
| Bi-Metal segment mix – HCV/LCV | 20%–25% of total revenue |
| Bi-Metal segment mix – brakes | 20% of total revenue |
| Bi-Metal segment mix – transmission | 15% of total revenue |
| Bi-Metal segment mix – other engineering/electricals | 10% of total revenue |
| New parts pipeline – Alkop | 51 new parts, business value of ₹29.69 cr across John Deere, Eaton, Taco Prestolite, Mayekawa |
| New business pipeline – Bi-Metal | More than ₹50 cr over next two years |
| New business pipeline – brakes | ~₹10 cr over next two years |
| Current order book | More than ₹32 cr, with ₹30–31 cr to be served on consolidated basis |
| H1 FY27 revenue target | ~₹190 cr |
| Order book mix – export | 60% |
| Order book mix – domestic | 40% |
| EV share of new order book | ~10% |
| EV share of aluminium division revenue | ~10% |
| Consolidated revenue mix – auto | 75% |
| Consolidated revenue mix – rest | 25% |
| PTFE bush opportunity – first part | 1 lakh bushes per month, sample approved, order expected within a month or two |
| PTFE bush opportunity – remaining six parts | ~6 lakh pieces per month, likely productionized in FY27 |
| Africa export disruption impact | ~₹2 cr of business lost over last three months, compensated by ₹6 cr orders from merchant exporter |
| Interest subvention on exports | 2.75% subsidy |
| PCFC loan availed | ₹6 cr at 4.70% |
| Total PCFC limits from bankers | ₹25 cr |
| Raw material – aluminium alloy cost movement | Some grades from ₹240/kg to ₹280/kg |
| Raw material – copper rate | ₹1,275 currently, up from ₹1,210 last month and ₹900 a year back |
| Raw material cost pass-through lag | Quarterly |