Key Takeaways
- Volume growth slowed, margin improved: Total gas sales rose 9.6% YoY but CNG growth decelerated to 7.5% from 10%+ as BEST bus volumes fell and new vehicle additions dropped. EBITDA per SCM climbed to INR9.68, up from INR8.35 in Q4, helped by softer Brent.
- APM allocation fell sharply, cost impact was neutral: APM share dropped from 47% to 37% QoQ, replaced by NWG and other gases, but the weighted average cost per molecule stayed flat because the reduction in other gas rates offset the shift.
- UEPL merger is imminent: NCLT approved the amalgamation on July 9; management expects the single-entity structure to be effective by August 15, with Q2 reflecting combined MGL-UEPL financials.
- New station throughput is structurally lower: The rising share of daughter booster stations in far-flung GA-2 and GA-3 areas, where pipelines have not reached, is pulling down average per-station volumes, a drag that will take 2-3 years to normalise as city gate stations come online.
- What to watch next quarter: Whether CNG volume growth recovers from the Q1 trough, the actual APM allocation for Q2 given management’s stated uncertainty, and the completion of the UEPL merger and its first consolidated quarter.
Volume: CNG Slowdown and the Mix Shift
- CNG deceleration: Volume growth fell to 7.5% YoY from double digits in prior quarters. BEST bus fleet reduction from ~3,000 to ~1,800 buses cut daily kgs sold from 125,000 to 98,000, while higher new-car prices reduced private vehicle and cab additions by 5,000-6,000 per quarter.
- Industrial/commercial surged: That segment grew 26% YoY, partly offsetting the CNG softness. Realisation averaged INR50 without tax, roughly 5% lower QoQ on softer Brent, with commercial LPG-linked customers earning higher than LDO/FO-linked ones.
- GA-wise divergence: GA-3 volumes grew from 0.24 to 0.33 mmscmd, GA-2 from 1.85 to 2.0, while GA-1 saw slight degrowth. The new geographies are adding volume but at lower per-station throughput because of the daughter-booster mix.
- Seasonal and structural overlap: Q1 is historically slightly lower, possibly on school vacations reducing bus operations, but management could not pinpoint a single concrete reason for the slowdown beyond the trends noted.
Ashu Shinghal: "Ups and downs keep happening as long as the trend is towards on increasing side, it is very difficult."
APM Allocation and Gas Cost Dynamics
- APM share swung sharply: Allocation dropped 10 percentage points QoQ to 37%, with the shortfall replaced by NWG and other gases. Management stressed that APM plus NWG together total around 2.2 mmscmd, and any further APM reduction should get replaced by NWG since it is reclassified from the same well.
- Cost per molecule held flat: The increase in cost from lower APM was exactly compensated by a reduction in rates of other gases, so the weighted average cost did not move. This kept the input-gas line stable despite the allocation shock.
- Outlook is genuinely uncertain: Management declined to forecast Q2 or Q3 allocation, saying experience over the last seven to eight months has shown lots of variation, sometimes going up and down. Domestic APM allocation is 100% and expected to continue, but the quantum for CGD players remains unpredictable.
Management: "We do not know really because our experience in the last seven, eight months has been that there has been a lot of variation in allocation, sometimes going up and down."
Margins: The INR9.5 Trajectory and Pricing Levers
- Q1 EBITDA per SCM rose to INR9.68, up from INR8.35 in Q4 after stripping out the one-time trade margin reversal from both quarters. Brent was slightly lower in Q1, which reduced industrial/commercial realisation by 5-6% versus Q4 but also helped on the cost side.
- Opex ran higher at INR6.6 per SCM versus a typical INR6-6.2, driven by back-ended CSR spending, a one-off past-period lease rent demand of a few crores, and a slight increase in repair and maintenance and lease rent on new plots.
- Pricing power exists but is unused: Management noted MGL still sells CNG at a lower price than many peers and has margin headroom to pass on price if input gas costs, foreign exchange, allocation, or zone-wise tariffs change. No price action is planned unless those parameters move.
- FY26 exit margin guided at INR9.5 per SCM, with Brent staying softer than Q1 adding some upside. The margin range has structurally lifted from the INR7 era to the INR9.5 era.
Management: "Earlier if you used to track our margins, we were in the range of INR7 or so. So, now we are in the range of INR9.5. Secondly, we are still selling CNG at a lower price as compared to many of our peers. So, therefore, we have some margins available there also to pass on the price in case it is required."
UEPL Merger and IBC Investment
- UEPL amalgamation is nearly complete: NCLT approved the scheme on July 9 with an appointed date of February 1, 2024. Signed order copies are expected in 1-2 days; both companies will file with ROC within 30 days of receipt, and the final order should follow within 7-8 days. Management expects everything to be over by August 15, making Q2 the first quarter with combined MGL-UEPL financials.
- UEPL is already profit-making: It reported EBITDA of INR16 crores in Q1 (marginally down from INR17 crores in Q4) and PAT of INR21 crores last year. Its interest cost is income for MGL. Volume growth of 30% per year is expected this year and possibly for the next two to three years.
- Tax benefits remain unquantified: Management described the mechanism of unabsorbed depreciation and tax losses available post-merger but declined to give a quantum when asked.
- IBC JV investment: MGL’s total commitment is INR375 crores, with current holding at 40-44% temporarily, ultimately settling at 40% MGL and 60% IBC. First-phase completion is expected by April to June next year, with at least 50% or more deployed, and the balance INR300 crores+ flowing over the following six months, for a total outflow of roughly 18 months. Accounting will be profit pickup only, not line-by-line consolidation.
Infrastructure: Stations, CAPEX, and the Daughter-Booster Drag
- CNG station rollout continues: MGL targets around 80 new stations this year. Two large stations are underway, with one in Sion (Wadala) expected in 7-8 months and the other on a similar timeline, delayed earlier by state authority permissions but now on a fast track.
- BEST station programme: 15 stations are targeted; 2 were operational two months ago, 6 more have been added, and the remaining 5-6 are expected by end of July or August.
- Daughter booster mix is diluting throughput: New stations are mostly daughter boosters in far-flung areas of GA-2 and GA-3 where pipelines have not reached, and their throughput is much lower than online stations. The ratio of daughter boosters to online stations is rising, pulling down overall average volumes.
- Conversion to online stations is a 2-3 year story: Three more city gate stations are being added (one at Usarghar this month, two more in 7-9 months to a year), enabling gradual conversion of daughter boosters to online stations. Management expects things to normalise in 2-3 years, though some daughter boosters will remain.
- LNG station build-out: One station is operating from MGL’s side, with the Aurangabad station running since last October. One more is ready in Seoni, Madhya Pradesh, and 3-4 more are expected this year in Bhiwandi, JNPT, Amravati, and one more in Maharashtra, taking the total to 6-7 stations by year end.
- CAPEX cycle has a visible taper: MGL’s existing GA trunk-line CAPEX has another 3-4 years to run, CNG station CAPEX 4-5 years, and last-mile connectivity for new customers continues. UEPL’s CAPEX cycle is at least 6-7 years, starting at INR150-200 crores and then tapering below INR100 crores. Combined MGL plus UEPL CAPEX is guided at INR1,100-1,300 crores for the next two years.
Management: "So, our CAPEX for MGL existing GA should taper down within four to five years and then only last-mile connectivity for customers who get added. So, even if I am running at 3 lakh connections per year, and we have already reached out to almost 0.27 crore households, considering 0.4 crore, that also I think takes another four, five years max in my view."
New Business: CBG, MSRTC, and Marketing Levers
- CBG plant with BMC: MGL signed an MoU with BMC for a CBG plant in Mumbai, with the Government of Maharashtra approving land lease at Deonar. MGL’s equity contribution is around INR130 crores, though cost may need reassessment.
- MSRTC bus conversions: Around 600 buses are running across 12 stations. MSRTC is exploring both LNG and CNG options, with future deployments expected in Raigarh district (GA-3) and some in GA-2. Management will upgrade or add infrastructure as required when MSRTC informs which depots it will deploy buses.
- Commercial vehicle marketing scheme: The scheme closed on March 31, and Q1 is typically slow for commercial vehicle sales. Management will reinitiate schemes at an appropriate time and is exploring B2B bulk deals with large fleet operators and transporters.
- PNGRB tariff impact: The unified tariff will be around INR0.60-0.70 per kg of CNG. Zone 2 tariff applies to roughly 32% of volume, but 50% of that will fall in Zone 1 because only 15% is industrial/commercial volume, so some savings are expected.
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| UEPL merger effective | Single-entity MGL-UEPL financials from Q2 | By August 15, 2024 |
| Combined CAPEX | INR1,100-1,300 crores | Next two years |
| IBC investment first phase | At least 50% of INR375 crores deployed | By April-June 2025 |
| IBC investment balance | Remaining INR300 crores+ | Within six months after first phase |
| CNG station additions | Around 80 new stations | FY26 |
| Two large CNG stations commissioned | One in Sion (Wadala), one other | 7-8 months |
| BEST stations completed | Remaining 5-6 of 15 targeted | By end of July or August 2024 |
| LNG stations operational | 3-4 more (Bhiwandi, JNPT, Amravati, one more) | By year end |
| FY26 volume growth | High single-digit to nearing double-digit | By end of FY26 |
| FY26 EBITDA margin | Around INR9.5 per SCM | By end of FY26 |
| UEPL volume growth | 30% per year | This year, possibly next 2-3 years |
| GA-3 volume growth | At least 15-20%, possibly ~30% | FY26-27 |
| Daughter booster to online conversion normalised | Gradual conversion via three new city gate stations | 2-3 years |
| MGL existing GA CAPEX taper | Down to last-mile connectivity only | Within 4-5 years |
| Normalised ROCE on incremental CAPEX | Achieved | 3-4 years from now |
Key Metrics
| Metric | Q1 FY26 |
|---|---|
| Total gas sales volume (MGL standalone) | 4.229 mmscmd, +9.61% YoY and +0.85% QoQ |
| Consolidated gas sales volume (MGL + UEPL) | 4.455 mmscmd |
| CNG sales volume | 2.981 mmscmd, +7.54% YoY |
| Domestic PNG sales volume | 0.569 mmscmd, +3.88% YoY |
| Industrial and commercial sales volume | 0.679 mmscmd, +26.09% YoY |
| EBITDA from operations | ₹485 cr, +28% QoQ |
| EBITDA excluding one-time trade margin reversal | ₹373 cr, vs ₹315 cr in Q4 FY25 |
| Net profit after tax | ₹324 cr, +29% QoQ |
| EBITDA per SCM (excl. one-time trade margin reversal) | ₹9.68, vs ₹8.35 in Q4 FY25 |
| Operating expenses per unit | ₹6.6 per SCM |
| APM allocation for CNG | 37% of total CNG volume, vs 47% in Q4 FY25 |
| New well gas allocation | ~16% currently |
| CNG vehicle additions | ~20,300, vs 27,000 in Q4 FY25 |
| CNG stations (MGL standalone) | 385 as on June 30 |
| CNG stations (UEPL) | 86 as on June 30 |
| Domestic households connected (MGL standalone) | ~0.29 crore cumulative |
| Steel and PE pipeline length (MGL standalone) | 7,538.63 km cumulative |
| UEPL total gas sales volume | 0.225 mmscmd, +8.55% QoQ |
| UEPL EBITDA | ~₹16 cr, vs ~₹17 cr in Q4 FY25 |
| GA-3 sales volume | 0.324 mmscmd |
| BEST CNG volume | ~98,000 kg per day, down from ~125,000 kg per day YoY |
| Industrial and commercial average realization (excl. tax) | ~₹50, ~5% lower QoQ linked to Brent |
| Core business CAPEX guidance (MGL + UEPL, annual) | ₹1,100 cr to ₹1,300 cr for next two years |
| CNG station addition target (FY26) | ~80 new stations |
| IBC JV total investment from MGL | ₹375 cr for 40% stake, of which ₹35-36 cr already paid |
| CBG plant project cost, MGL equity contribution | ~₹130 cr out of total ₹600-650 cr |