Key Takeaways
- Volume and content drove outperformance: Revenue grew ahead of industry across all vehicle segments, helped by rising SUV penetration and richer content in hybrids and EVs.
- Copper created a transitory margin drag: Higher copper prices compressed margins in Q1, but the pass-through lag works both ways and copper has already started cooling.
- Two new greenfields are loading costs before revenue: Startup expenses for the Pune and Navagam plants hit the P&L this quarter while volumes are still negligible; the Pune plant has just commenced operations.
- Management sees a volume doubling in 3–5 years: The claim rests on customer capacity expansion, new model launches, and competitors’ old plants being absorbed by existing players.
- What to watch next quarter: Whether the Pune plant ramps on schedule, the pace of copper-cost normalization, and any concrete volume schedules from the delayed Navagam customer.
Revenue Drivers: Volume, Content and Mix
- Volume-led outperformance: Revenue growth exceeded industry growth rates across passenger vehicles, commercial vehicles and two-wheelers, driven by higher offtake from existing customers.
- Content tailwind from electrification: High-voltage cables, battery management systems and related components are lifting content per vehicle in clean mobility; hybrids also carry materially more copper content than ICE because of additional cables and connectors.
- SUV and feature mix: The shift toward SUVs and content-rich new-generation platforms is adding wiring harness content even within the ICE fleet.
- Yen pass-through mechanics: A stronger yen lifts the company’s sales on the lighter side, with a pass-through lag of three months for some customers and six months for others. Royalty to Sumitomo is paid in INR, insulating that line from yen moves.
Sehgal: "I think the volume perceived, by itself, would almost double up, if I'm not wrong, within the next 3 to 5 years."
Margin Walk: Copper, Mix and Startup Costs
- Copper pass-through is the main swing factor: The normal pass-through period for copper cost inflation is three to six months, so the Q1 margin impact reflects higher input costs that will reverse as copper cools. The company does not hedge copper unless a customer pays for the hedge; some customers hedge directly.
- Product mix, not just commodity: The raw material cost ratio at the RM2 stage was broadly stable sequentially and YoY, so the transitory margin pressure is attributed more to product mix shifts than to commodity prices alone.
- Startup costs are visible but unquantified: The sequential increase in other expenses and employee benefit expenses is largely the ramp-up cost of the two new greenfield plants, where revenues have either just begun in very small quantities or have not yet started. Management declined to isolate a one-off number.
- Falling copper helps margin math mechanically: If copper prices fall while volumes and all other costs stay constant, percentage margins will expand, per an analyst’s math. Over the last decade, the company has sometimes gained and sometimes lost on copper inventory depending on the customer’s pricing mechanism.
Sehgal: "We keep trying to explain to you, ROCE is important, but very difficult to answer this question, but Pankaj, if you can try to make him understand."
Capacity Expansion: New Plants and the 80% Rule
- Pune plant commenced operations in Q1: The plant is expected to ramp up fully by Q2 or Q3 FY25.
- Navagam plant delayed by customer: Facility construction is on schedule, but the customer’s start of production has been pushed out by a few quarters; the plant is now expected to come on stream in Q1 FY26.
- The 80% trigger governs all expansion: The company does not talk about capacity utilization in percentage terms. Instead, the moment a customer hits 80% of its promised volume at an existing plant, the company commits to setting up a new plant, bringing the old plant’s loading back down to 50–60%.
- Plant count could rise to 32–34: Management indicated that the current 28 plants may grow by four to six in the next year or so, driven by new capacities and new model launches across the customer base.
Sehgal: "If the customer hits 80% of the volume that he has promised, we will definitely go for a new plant. And that's the reason that always we don't talk about capacity."
Product and Technology: Localization and the EV Transition
- Local CCS2 connector developed: The company has developed a local charging-side connector, adding a domestically sourced component to its EV portfolio.
- EV localization will follow market scale: Management declined to give a timeline for when localization levels in EV wiring harness will match ICE levels, arguing that different models use different products, current volumes are a small fraction of the total market, and unit-level localization will happen only as market sizes grow and mature.
- Hybrid content sits between ICE and EV: On an overall basis, hybrid vehicle content is much higher than ICE, while EV content is much higher still. New-generation vehicles add content through feature additions regardless of powertrain.
- No margin disclosure by powertrain: Management declined to quantify margin differences between EV, hybrid and ICE products, stating that it evaluates projects on ROCE and that margins depend on value addition project by project.
Mital: "Different models are there which use different types of products and as you would have seen that while we say that the volumes have risen, it's with respect to a very small percentage of the total market size. So as the market sizes grow and mature and then the component localization at a unit level will happen."
Industry Backdrop and Volume Outlook
- Broad-based customer expansion: Almost all customers are adding capacity, setting up new plants and launching new models. Some carmakers have made fresh investment announcements recently, and old plants shut down by certain customers have been acquired by existing players.
- Mid-to-long-term demand looks strong: Management described the industry outlook as positive across the board, with the volume base perceived to nearly double within three to five years.
- Near-term schedules remain opaque: When asked for volume schedules from OEMs for the current and next quarter for the newly commissioned plant, management called the question “very subjective” and “very difficult to answer,” adding “we have to wait and watch.”
Sehgal: "So you have to be ahead of the game. And we feel that we're in a very strong position where we have 28 plants. Maybe in the next year or so, maybe go to 32, 34, I don't know. But we have to prepare for the new plants that are coming up, new capacities that are coming up by the carmakers."
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Pune plant ramp-up | Fully ramp up volumes | Q2–Q3 FY25 |
| Navagam plant start of production | Commence operations (customer SOP delayed by a few quarters) | Q1 FY26 |
| Copper cost normalization | Impact of cooling copper prices to flow through | Q2 FY25 or within six months |
| Plant count expansion | Grow from 28 to 32–34 plants | Next year or so |
| Volume doubling | Perceived volume base to nearly double | Within 3–5 years |
Key Metrics
| Metric | Q1 FY25 |
|---|---|
| Revenue | ₹2,185 cr, +17% YoY |
| EBITDA | ₹239 cr, +15% YoY |
| EV and hybrid revenue share | ~5% of total revenue in Q1 |
| EV revenue growth | +50% YoY |
| Hybrid vehicle production growth | +34% YoY |
| EV production growth | +11% YoY |
| Capex guidance for FY25 | ~₹200 cr |
| Total wiring harness plants | 28, including 2 new greenfields |
| New plant 1 (Pune) ramp-up timeline | Q2–Q3 FY25 |
| New plant 2 (Navagam) start of production | Q1 FY26, delayed by a few quarters due to customer |
| Copper pass-through lag | 3–6 months |
| Yen pass-through lag | 3–6 months, varies by customer |
| Volume outlook (management perception) | Almost double within next 3–5 years |
| Plant count outlook (management perception) | 32–34 in the next year or so |