Key Takeaways
- A quarter of heavy lifting, not harvesting: Revenue grew ~31% YoY for the half-year, but margins compressed to single digits as the company absorbed startup costs for two new plants, wage hikes, and expedited freight to meet demand.
- ~₹30 crores of identifiable drag: Management ballparked the incremental cost from new facilities and demand-fulfillment pressures at roughly ₹30 crores, a mix of under-utilized manpower and one-time setup expenses that should fade as volumes ramp.
- Cost structure has shifted, and the old passthrough model does not fully cover it: Copper and Yen are passed through with a lag, but broader inflation in components, freight, and wages represents a structural change the company is now actively negotiating with customers to offset.
- The recovery story hinges on volume absorption and customer pricing: Management expects startup costs to neutralize over the next 2–3 quarters as new plants ramp, efficiency improves, and customer compensation discussions bear fruit.
- What to watch next quarter: Whether the ~₹30 crores drag shrinks as promised, any sign of customer price adjustments landing, and the trajectory of the raw-material-to-sales ratio as currency and commodity lags play out.
Performance Drivers & Cost Headwinds
- Top-line momentum, bottom-line pain: Half-year turnover reached ₹1,800 crores, up ~31%, but the quarter’s margin fell to a single-digit level as a cluster of costs hit simultaneously.
- New plant startup costs: Two plants in Chennai and Bangalore reached final commissioning stages, incurring manpower (hired and in training), assembly boards, tools, and fixtures. These costs are expected to neutralize when matching volumes arrive, likely from Q4 onward.
- Wage inflation: A significant increase in minimum wages took effect this quarter, adding to the employee cost line. Management declined to guide on a normalized employee-cost-to-sales ratio, citing product mix and ramp-up variability.
- Freight and expedited costs: Both incoming and outgoing expedited freight, plus additional manpower, were deployed to meet heightened customer demand, adding a layer of cost not in the baseline.
- Raw material ratio pressure: The raw-material-to-sales ratio rose despite a 15% QoQ drop in copper prices. The culprits: Japanese Yen movement reducing sales price realization on material consumption, US dollar strength raising the cost of imported child parts, new product additions, and training-related material consumption.
- Copper and currency passthrough lag: Copper price adjustments flow to contracts with a one-quarter lag; the average copper price of this quarter applies to the next. The same lag applies to the Yen, while USD/JPY at 150 adversely impacts dollar-denominated imports until customer price adjustments catch up.
- No copper inventory risk: The company holds no copper stocks, buying wire for the next 2–3 days from parent SAMIL, and does not hedge because copper is a passthrough with customers.
Gauba: "Yes, we hope the prices become stable and then there is always a condition that future is something which is neither you are aware nor I am, but if the things get more stabilized, then the things should do better."
The Cost-Structure Shift & Customer Negotiations
- Beyond the old passthrough model: Historically, only copper and Japanese Yen were passed through to customers. The current environment has introduced a structural change: component manufacturers’ price revisions, supply-chain disruptions, and human-resource costs rising beyond normal levels.
- Negotiations underway: Management is in ongoing discussions with customers to mitigate these cost escalations through price adjustments. The fact that customers are asking for increased supply is helping accelerate the pace of compensation negotiations.
- Internal offsets in parallel: Alongside customer discussions, the company is pursuing efficiency improvements and reducing support from the mother plant to bring costs down as a percentage of sales.
- US dollar imports managed: Where projects carry large US dollar import content, the company undertakes coverage to protect against volatility. Localization content has improved over time, reducing this exposure.
Sehgal: "The customers have been asking us for lot of increase on the supply side and that has also helped us to actually negotiate with them in a much faster pace the compensation of the same that can be there."
New Capacity & Ramp-Up Timeline
- Two new plants commissioned: One in Chennai and one in Bangalore, both started in this quarter. They serve low-voltage (ICE) and hybrid vehicles, not exclusively high-voltage EV segments.
- EV processing separate: EV harness processing facilities were set up earlier in existing Chennai and Pune plants, not in these new facilities.
- Ramp-up expected over 2–3 quarters: Management guided that the Bangalore and Chennai facilities should ramp over the next 2–3 quarters (Q4 FY23 to Q1 FY24), not a full year, though volumes ultimately depend on car-maker schedules.
- The ₹30 crores drag: Per an analyst’s math, the incremental cost from new facilities is roughly ₹30 crores plus or minus. This includes manpower costs that will decline as revenues ramp, and one-time costs (assembly boards, tools, fixtures) that will be eliminated altogether. Management declined to split the figure further.
- CAPEX within guided range: Despite robust demand and the need to balance more capacity, CAPEX should remain within the originally guided range of ₹125 crores plus or minus 25.
Product & Market Developments
- New products added in the last quarter, contributing to the raw-material ratio movement.
- EV wiring harness still nascent: Penetration is not big at the moment, but the company is continuously engaged with customers and adding content across passenger cars, two-wheelers, buses, small trucks, and machine makers.
- Localization a step-by-step story: A good amount of localization has been achieved with some customers, but most connectors remain imported for now. Localization will extend to the charging side, cables, and connections as things stabilize with customers.
Margin Outlook & Management Stance
- No margin guidance: Management does not guide on margins or employee-cost ratios, calling such requests “too micro.” The focus metric is return on capital employed.
- Gross margin trajectory unanswered: When asked whether gross margin has bottomed out, management deflected, stating they cannot predict the future and do not guide on margins.
- Confident tone on recovery: Despite the deflection on specifics, management expressed confidence that efforts to mitigate pressures from the last quarter will show results soon, and that the company will “come up very strong in the coming quarter and the quarters.”
Sehgal: "It is a work in progress kind of quarter because we had huge expansion on the same side, the plants are almost ready for production, so I think you would see the efforts of team to mitigate whatever pressures for last quarter and it happened very soon and I think you would see that the company comes up very strong in the coming quarter and the quarters."
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Startup cost neutralization | Volumes and matching revenues to absorb new plant costs; efficiency improvements and reduced mother-plant support to help | Next 2 quarters, more so in Q4 FY23 |
| New plant ramp-up | Bangalore and Chennai facilities to ramp, dependent on car-maker volumes | Q4 FY23 to Q1 FY24 (2–3 quarters) |
| CAPEX | Remain within guided range despite robust demand and capacity balancing | ₹125 crores ±25 for the period |
| Customer cost compensation | Price adjustments to offset structural cost increases, negotiated at a faster pace due to customer supply requests | Ongoing; no closure date given |
Key Metrics
| Metric | Q2 FY23 |
|---|---|
| Revenue | ~10% QoQ increase |
| Half-yearly turnover growth | ~31%, with cost net figure of ₹1,800 crores |
| One-time costs (startup and demand-related) | ~₹30 crores, distributed between staff cost and other expenses |
| Employee cost | ₹17 crores |
| H1 FY23 CAPEX incurred | ₹85 crores |
| FY23 CAPEX guidance | ₹125 crores, plus or minus 25 crores |
| Copper price movement | 15% decline QoQ |
| US dollar to Japanese Yen | 150, a historical lowest level |
| New plant ramp-up timeline | Next 2-3 quarters (Q4 FY23 to Q1 FY24) |