Key Takeaways
- Revenue nearly doubled, but capacity is the real story: Income grew 88.4% YoY to ₹67 crore in H1, yet the company is running at only 30-35% utilization of its 30,500 MTPA capacity, leaving a large revenue gap that seasonal H2 ramp-ups and new CPCB enforcement are expected to close.
- IPO funds triggered an inventory bulge, not a demand problem: Inventory spiked to ₹31.35 crores because the company opportunistically bought discounted material in late September using IPO proceeds; the normal 40-45 day sell-through cycle means this is a timing artifact, and stock levels are already declining.
- Regulatory enforcement is the margin catalyst: A September 2024 CPCB circular mandating minimum EPR rates, combined with ongoing audits, is expected to flush out bad competition and support margins, though management calls doubling margins "slightly stretched" this year.
- Two new plants double the capacity bet: A lithium-ion battery plant in Nashik (11,050 MTPA, Q1 FY26) and a Hyderabad plant (15,000 MTPA, FY26) will lift total capacity to 56,500+ MTPA, with management targeting full utilization by FY26-27 and overall revenue potential of ₹500-600+ crores.
- What to watch next quarter: Whether the seasonal H2 EPR income surge materializes as producers rush to meet March 31 targets, the pace of inventory normalization, and any further CPCB enforcement actions that shift market share from the unorganized sector.
The Capacity Gap: Why 35% Utilization Isn't as Bad as It Looks
- Seasonality drives the second half: The first six months are always slower; last year the company did ₹35 crores in H1 and finished at ₹100 crores because producers must meet their EPR targets by the March 31 year-end, concentrating orders and EPR incentivization income in December through March.
- Regulatory uncertainty froze orders: Many producers held back orders while waiting to see if the CPCB's minimum rate circular would be revised; the CPCB's subsequent instruction that deviations are punishable is expected to release that pent-up demand in H2.
- The plant must run regardless: Even at low utilization, the plant operates year-round because a large order (e.g., 1,200 tons in February) cannot be processed if the facility is idle; the negative delta from continuous EPR collection ties up capital for 60-75 days before producer payments arrive.
- Full utilization target is 18-24 months out: Management expects to end this fiscal year at 80-90% utilization of current capacity, with the expanded 56,500 MTPA capacity fully utilized by FY26-27.
Akshay Jain: "We see the recycling as a decentralized business. So rather than investing heavily in a plant and then feeding it from across India, we rather want to have multiple facilities and one high-tech plant where we can recover everything, end-to-end recycling, supported by multiple plants which can be handled locally and so that sourcing becomes feasible for us."
EPR Economics: The Negative Delta That Becomes a Positive
- The core mechanic: The company collects e-waste from 200-250 aggregators and recycles it at a loss (cost ₹60, recovery ₹50), then invoices the producer for that loss plus a profit, charging ₹18-20 per unit; the gross margin on this EPR activity is around 18%.
- Timing mismatch depresses H1 margins: EPR service invoices are raised to producers only after completion of targets, and most of that income arrives from December to March, so H1 margins look compressed while the underlying activity continues.
- CPCB minimum rates provide a floor: The September 2024 circular mandating minimum rates across categories replaced a chaotic, competitive pricing environment, and management expects this to support better EBITDA margins going forward alongside reduced interest costs post-IPO.
- Payment cycle is clean: Producers pay within 30 days of invoice submission with no advance payments, so the working capital drag is predictable and tied to the 40-45 day inventory cycle.
Akshay Jain: "we lose around 10-15% on the whole activity, whereas we get around 30% extra from the EPR incentivization. So, overall, that makes our margin to around between 15-20%."
Inventory & Receivables: IPO-Fueled Spikes, Not Red Flags
- Inventory doubled on opportunistic buying: The company used IPO funds to lift material at a heavy discount in the last 10 days of September; materials took 5-7 days to arrive from across India, landing in the last week of the month and spiking finished goods to ₹31.35 crores from ₹14.65 crores.
- Normalization is already underway: The typical cycle is 40-45 days to sell and recover money, and management stated stock levels have already started coming down from the September peak.
- Trade receivables moved in lockstep with revenue: Sales concentrated in the last week of September, and with a ~30-day collection cycle, the receivables spike is consistent with 88% revenue growth rather than a deterioration in collections.
- Capital is always in rotation: The negative delta from EPR timing affects the balance sheet for 60-75 days, a structural feature of the business model that the IPO funding now supports without interest pressure.
Sanjeev Srivastava: "In September, we had got a very good opportunity of lifting material at a heavy discount. This purchase was done when we got our funds from IPO, et cetera, and that purchase was done in the last 10 days of September."
Expansion: Two Plants, a Battery Bet, and a Decentralized Thesis
- Lithium-ion battery plant (Nashik, 11,050 MTPA): Commissioning in Q1 FY26, funded from IPO proceeds; initial focus will be on battery refurbishment and secondary battery pack production, with recycling to follow as the paradigm shifts over time; revenue potential at full utilization is ₹80-120 crores.
- Hyderabad plant (15,000 MTPA): To be set up in the TSIIC electronic manufacturing cluster by FY26, funded from internal sources; part of a strategy to place facilities closer to waste generation points rather than feeding one mega-plant from across India.
- Techeco acquisition: A Maharashtra-based LLP where Akshay Jain held 33% partnership, now taken under direct control to expand presence in the state and minimize logistics costs using nearly identical technology.
- Decentralized model vs. Attero: Management explicitly contrasts its multi-facility, geography-targeted approach with Attero's single large facility, arguing that local sourcing feasibility is the competitive advantage.
- Battery margins expected to be better: Refurbishment is always the highest-margin segment (currently 15% of the top line), and battery refurbishment is expected to carry similarly better margins than pure recycling.
The Regulatory Moat: How CPCB Enforcement Reshapes the Market
- Schedule 1 expansion formalized the market: CPCB expanded EPR applicability to over 120 items, defined minimum rates, and has now begun ground-level audits; management expects bad competition to be "flooded out" as implementation tightens over 6-12 months.
- The onus is now on producers: CPCB has shifted responsibility to producers, and the September circular explicitly states that all guidelines must be respected with deviations punishable, reducing the price-undercutting that fragmented the market.
- Refurbishment is a regulatory creation: Refurbishment as a standalone business was not identified in e-waste rules until 2023; formalization is happening gradually, and the company expects the refurbishment contribution to stay in the 15-30% range going forward.
- Market share could nearly double: Management estimates current formalized e-waste recycling market share at 3-5% and believes it could nearly double in two years as the unorganized sector loses ground to compliance.
Akshay Jain: "So, everything they have now given, the onus of this entire activity to the producers. So, we have as far as today, we have nothing to ask from the CPCB, but yes, implementation is happening on a ground level. They have started the audit. So, we expect that bad competition will be flooded out of the market soon."
Margins: The H2 Uptick and the Limits of Improvement
- H1 margin dip was ~250-300 bps: Driven by the EPR income timing mismatch (most incentivization arrives December to March) and the inventory build; management expects better margins in H2 as EPR invoices are raised.
- Doubling margins is off the table this year: When asked if 15%+ margins are achievable, management declined to commit, calling a doubling of margin "slightly stretched" and not possible this year; the stated intent is to keep margins intact rather than targeting a step-change.
- Structural supports are in place: Reduced interest costs post-IPO, CPCB minimum rates, and the seasonal H2 EPR surge all point to improvement, but management is cautious about overcommitting.
- Commodity price risk is hedged naturally: Raw material is bought 365 days a year and extracted commodities sold simultaneously; when prices move, procurement costs move in the same direction, and the company also hedges positions when there is major stock exposure.
- Tax benefit provides a small tailwind: IPO expenses (₹6.17 crores) are being deducted on a pro-rata basis over 5 years, creating a deferred tax asset that added ₹9.95 lakh to PAT this half; the benefit of ~₹61 lakh per half will continue.
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Current capacity utilization | End FY25 at 80-90% of 30,500 MTPA | By March 31, 2025 |
| Lithium-ion plant commissioning | 11,050 MTPA plant in Nashik operational | Q1 FY26 |
| Hyderabad plant commissioning | 15,000 MTPA plant in TSIIC cluster operational | FY26 (by Q2) |
| Total capacity utilization | Entire 56,500+ MTPA capacity fully utilized | FY26-27 |
| Market share | Nearly double from current 3-5% of formalized market | Within 2 years |
| Tax benefit from IPO expenses | ~₹61 lakh per half-year deduction, continuing for 5 years | Through FY29 |
| Refurbishment contribution | Remain in 15-30% range of top line | Ongoing |
Key Metrics
| Metric | H1 FY25 |
|---|---|
| Revenue | ₹67 cr, +88.4% YoY |
| EBITDA | ₹6.81 cr, +42.46% YoY |
| EBITDA margin | 10.16%, down from ~13% in FY24 |
| PAT | ₹5.34 cr, +95.77% YoY |
| PAT margin | 7.97% |
| EPS | ₹2.34 |
| ROE | 8.84%, post IPO capital issuance |
| ROCE | 7.09%, post IPO capital issuance |
| Revenue mix | ~60% recycling, ~15% refurbishment, ~20% EPR and consultancy |
| Capacity utilization | 30–35% in H1; expected to reach 80–90% by year-end |
| Total recycling capacity | 30,500 MTPA currently; expanding to 56,500+ MTPA by Q2 FY26 |
| EPR gross margin | ~18% |
| Formal e-waste recycling market share | 3–5% |
| Trade receivables | ₹13 cr, up from ₹6.7 cr in H1 FY24 |
| Inventory | ₹31.35 cr, up from ₹14.65 cr in H1 FY24; includes ~₹5 cr refurbished, ~₹7 cr metals and sellable product |