Key Takeaways
- H1 revenue up 41% YoY, full-year target raised: Management is comfortable reaching ₹300 cr and positive on ₹350 cr+ for FY27, with ₹400 cr still in reach, driven by direct-to-OEM sourcing and new capacity.
- Battery recycling is scaling fast: H1 battery revenue hit ₹35 cr, full-year target is ~₹125 cr, and the black mass export ban now forces domestic processing, which management sees as a structural tailwind for its upcoming hydrometallurgy plant.
- Expansion mode is compressing margins now, with a payoff promised later: Pre-operative expenses, team building, and capacity build-out across three sites are weighing on profitability, but management expects margins to improve once infrastructure is operational, in five to six months.
- Hydrometallurgy is the strategic pivot: A pilot plant will be operational in 3–4 months, a commercial 5 TPD plant in ~18 months, targeting a ₹350–400 cr annual top-line and transforming the company from a recycler into a critical mineral recovery player delivering 12+ metals.
- What to watch next quarter: Whether the Hyderabad license arrives by December, the pace of battery capacity utilization toward the 60% H2 target, and any margin inflection as expansion spending peaks.
Revenue Growth & Full-Year Outlook
- H1 delivered 41% YoY growth, with management attributing the performance to a robust direct-to-OEM sourcing model and improved operational efficiencies.
- FY27 target is ₹350 cr, with upside to ₹400 cr: Management is comfortable at ₹300 cr, positive on ₹350 cr+, and sees ₹400 cr as ambitious but still in reach; this implies H2 must significantly outpace H1.
- FY28 ambition is to double FY27 revenue to somewhere around ₹700 cr, and management responded "Absolutely" when an analyst asked whether ₹700–750 cr with 14–15% margins is achievable.
- FY29 potential of ₹1,000 cr is linked to hydrometallurgy coming online, and management says that number is "still under the reach."
- Revenue guidance has been inconsistent across disclosures, and when an analyst flagged that the PPT, slide 25, earlier guidance, and H2 implied growth all point to different numbers, management provided H2/H1 commentary but did not reconcile the conflicting percentages.
Akshay Jain: "So currently looking at what we have achieved in H1, we are very much comfortable with reaching a total of 300. And, uh, uh, with, uh, 350 to 400 revenue potential in our target, we are still positive of achieving somewhere around 350 plus for this financial year."
Battery Recycling: Scaling & the Black Mass Opportunity
- H1 battery revenue was ₹35 cr, with material arriving late in the half, so inventory is being carried forward into H2.
- Full-year battery target is ~₹125 cr, implying a steep H2 ramp; management is targeting 60–65% capacity utilization in H2, up from 30% in H1, and close to 60% by year-end.
- LFP batteries dominated the mix in H1, but management notes this dynamic can change and is not fixed; the shift from LFP to NMC/LCO in the scrap segment will take at least two years to translate from current products to scrap availability.
- The government has completely banned black mass exports, removing earlier ambiguity; management is "quite happy" with the one-sided clarity and expects the Indian economy to restructure, scrap prices to change, and the hydrometallurgy business to become more lucrative.
- 100% of the 12,000 MT battery plant's black mass can be utilized internally once the hydrometallurgy plant is running; the company currently only sells black mass and will begin procuring it externally once its own refining capability is operational.
- Capacity expansion is not the bottleneck: management states capacity expansion is never a challenge, and the binding constraint is always raw material procurement, where 60% of the team's effort is deployed.
Akshay Jain: "We are quite happy with... we are always happy when it is one-sided. So now that there is no confusion, we have to develop these capabilities within India."
Hydrometallurgy: The Strategic Pivot to Critical Minerals
- A pilot hydrometallurgy plant is being set up in Nashik, with technology and partner now fixed; it will be operational in the next 3 to 4 months, before the end of this financial year.
- A commercial 5 TPD plant will take ~18 months to complete, with a capex of ₹70 cr+ and an annual top-line potential of ₹350–400 cr including EPR.
- The company is eligible for PLI subsidies covering 50% of the capex plus for the hydrometallurgy project.
- Post-pilot, commercial expansion is planned in Haryana (NCR), not Nashik, because NCR is a better market and the plant will not depend solely on own raw material but also other verticals.
- The stated strategic vision is to transform from an e-waste and battery recycler into a critical mineral recovery company delivering a product portfolio of more than 12 metals, including precious metals, rare earth metals, and critical minerals, within the next three years.
- Management declined to comment on competitor comparisons when an analyst noted the 5 TPD / 180 crore ton capacity versus a competitor's 6,000 tonnes at similar capex, saying they cannot be certain about numbers until moving from pilot to main plant.
- Technology and JV details are being withheld until installation is complete; management declined to comment publicly.
Akshay Jain: "We want to change our company's outlook from just being an e-waste or a battery recycler to rather a critical mineral recovering company. So we want to focus ourselves on precious metals, rare earth metals, and the metals which every government, every country is talking about."
E-Waste: Capacity Build-Out & Regulatory Headwinds
- Nashik e-waste utilization is ~70%, but the product mix has shifted from white goods last year to more IT goods and mobile phones this year, improving numbers at similar utilization.
- Hyderabad commenced partial commercial operations in late Q2 FY27, providing critical access to the South Indian e-waste ecosystem and reducing reverse logistic costs; the plant is operating without a full license, performing bulkiness removal locally so no revenue potential is being lost this year.
- The Hyderabad license is expected "very soon," maximum by December, after the pollution board's monthly committee meeting with CPCB officials did not happen last month, causing a delay.
- Hyderabad utilization is projected at single digits this year, ramping to ~30% from the very first full operational year.
- Haryana e-waste utilization is projected at ~40% this year, while Nashik is projected at 60–70%.
- The e-waste business is currently loss-making because of competition from the informal sector, lack of regulatory enforcement, EPR prices challenged in court by producers, and no regular audits on recyclers; however, recent months have seen some recyclers shut down and notices issued to producers for wrong EPR compliances.
- Revenue composition is a complete portfolio: ~15–20% from IT refurbishment, ~15% from EPR, and ~60–65% from sale of scrap and extracted metals, with all segments promising at different times.
Akshay Jain: "Once this regulatory work actually takes place on ground, it's going to be hugely beneficial for ethical recyclers like us. That business is actually very promising. And I've been doing it for 12 years. So it still has huge potential that is still untapped in the country."
Margins & Expenses
- EBITDA grew 41% YoY and PAT grew 29% YoY, but margins are under pressure because the company is in total expansion mode with team building, capacity expansion, and pre-operative expenses across new products and territories.
- Employee cost has risen sharply because sourcing and BD executives nearly doubled YoY, regional offices with regional heads are being built, and more technical labor has been added across plants handling higher quantities.
- Interest cost of ₹2 cr on ₹16 cr debt appears high because Namo Ewaste (parent) charged interest on capital to its Nashik subsidiary (battery operations); this is not eliminated in consolidation because the adjustment relates to capital, not inter-company sale/purchase.
- Management expects better margins once the expansion phase is more streamlined and infrastructure is in operation; this is "not visible right now" but expected in a slightly longer run, maybe five to six months.
- Management responded "Absolutely" when asked whether 14% margins are possible going forward, noting the company is in full expansion mode with many expenses but still managed better profit.
- Gold and silver price crashes had very little impact on H1 performance in terms of overall contribution.
- An analyst flagged that standalone other income was ₹4.8 cr vs ₹44 lakh, and management deferred, saying a clarification would be issued later via Capitec; the interest cost consolidation treatment was also not resolved on the call.
Akshay Jain: "Definitely once you know this expansion phase is more streamlined and we have our infrastructure in operation, so definitely we are going to have improved margins. ... is not visible right now. But yeah in the in in a slightly longer run. There will be better margins for sure."
Sourcing, People & Competitive Position
- Sourcing is the biggest challenge and the company's USP: 60% of the team's effort goes into sourcing, and management describes it as the most crucial part of the business.
- Sourcing and BD executives have nearly doubled YoY, and regional offices with regional heads are being built to expand procurement reach.
- The company already has OEM connections for EV batteries and is increasing the team for more connections and contracts; data center partnerships are also already engaged.
- An order in excess of ₹35 cr for NMC batteries was received from one OEM by end of September, but management explicitly declined to disclose orders to exchanges, stating "that is not good for our business."
- Promoter shareholding was transferred to the father's account as a family internal transfer for consolidation; the promoter remains the face of the company.
Akshay Jain: "Sourcing is always a challenge in this business. The biggest challenge has always been sourcing in business capacity expansions, capacity building, that is never a challenge, sir."
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| FY27 revenue | Comfortable at ₹300 cr, positive on ₹350 cr+, ₹400 cr still in reach | FY27 full year |
| FY28 revenue | Double FY27 to somewhere around ₹700 cr | FY28 full year |
| FY29 revenue potential | ₹1,000 cr, linked to hydrometallurgy kicking in | End of FY29 |
| Battery capacity utilization | 60–65% in H2, close to 60% by year-end | H2 FY27 / FY27 exit |
| Hydrometallurgy pilot plant | Operational | Next 3–4 months / before end of March |
| Commercial hydrometallurgy plant | 5 TPD, ₹70 cr+ capex, ₹350–400 cr annual top-line potential | ~18 months from now |
| Hyderabad license | Final approval from pollution board | Maximum by December |
| Hyderabad utilization | ~30% from first full operational year | First full year of operations |
| Margin improvement | Better margins once expansion is streamlined | Five to six months |
| Mainboard migration | Apply when top-line and bottom-line targets met, including ₹50 cr PAT | Not limited to any timeline |
| Funding for hydrometallurgy | Debt is first choice; no equity dilution planned at this point | Ongoing |
Key Metrics
| Metric | H1 FY27 |
|---|---|
| Total income from operations | ₹124 cr, +41% YoY |
| EBITDA | ₹16 cr, +41% YoY |
| EBITDA margin | ~13% |
| PAT | ₹9 cr, +29% YoY |
| Revenue from battery recycling | ₹35 cr, out of ₹124 cr total |
| Revenue from EPR | ₹8 cr, out of ₹88 cr in e-waste segment |
| Total installed capacity (e-waste + battery) | 82,000 MTPA |
| Nashik battery recycling capacity utilization | >30% in H1 FY27 |
| Haryana e-waste plant capacity utilization | ~40% projected for FY27 |
| Nashik e-waste plant capacity utilization | 60–70% projected for FY27 |
| FY27 full-year revenue guidance | ₹350–400 cr, management positive on achieving ₹350+ |
| FY28 revenue target | ~₹700 cr, double FY27 |
| FY28–29 revenue potential | ₹1,000 cr, linked to hydrometallurgy |
| FY27 full-year battery revenue target | ~₹125 cr |
| Hydrometallurgy pilot plant capex | ~₹6 cr |
| Commercial hydrometallurgy plant capex | ₹70 cr+, for 5 TPD capacity, eligible for 50% subsidy |
| 5 TPD hydromet plant annual revenue potential | ₹350–400 cr, including EPR |
| Mainboard migration PAT target | ₹50 cr |
| Black mass market price range | ₹400–₹1,000 per kg, based on commodity and metal prices |
| Direct consumer procurement | ~5% of total procurement via on-ground initiatives |