Key Takeaways
- Margin compression from growth investment, not demand weakness: EBITDA margin fell to 9.85% as logistics costs doubled and pre-operative expenses hit the P&L, while revenue mix improved toward higher-value recycling and refurbishment.
- Lithium-ion battery recycling goes live next month: The Nasik plant, with 7,000 MT black mass and 5,000 MT refurbishment capacity, commissions in Q1 FY26 and targets ₹80–₹100 cr revenue at just 35% utilization in its first year.
- Capacity utilization is scaling fast: Overall utilization rose from 35% in H1 to 55% in H2, with Faridabad hitting 100% in its first full year; management expects 65–70% in FY26 as new plants ramp.
- The EPR pricing fight is a regulatory tailwind, not a risk: Producers are challenging the government's minimum pricing formula in court, but management expects the government to prevail, and the company is already walking away from below-minimum business.
- What to watch next quarter: Whether the Nasik Li-Ion plant commissions on time and signs its first EV OEM contracts, the pace of the Hyderabad plant build-out, and any movement in the EPR pricing court case.
Lithium-Ion Battery Recycling: The Next Growth Engine
- Nasik plant commissioning: The lithium-ion battery recycling facility on leased land adjacent to the existing Nasik plant will be operational from June 2025, with two distinct revenue streams: refurbishment and restoration of battery cells (20–30% of operations) and shredding for black mass creation (70%).
- Black mass export strategy: Black mass will be exported to top global players in China and Taiwan because Indian refining solutions are not efficient on an industrial scale. Management explicitly ruled out in-house refining of rare earth metals, citing global CAPEX requirements in excess of half a billion dollars and only 10–12 success stories worldwide.
- First-year revenue potential: At a minimum targeted 35% capacity utilization, the plant is expected to generate around ₹80 to ₹100 cr in revenue, with a gross margin range of 18–25%. The company expects 7 to 8 months of business in FY26 given the Q1 commissioning.
- Sourcing pipeline building: Direct tie-ups are already in place with Tata Motors, LG, Ola Electric, and MG, supplemented by local market procurement and EPR obligations. Talks with 2–3 major EV players are ongoing, though no orders are confirmed yet.
- Import license in motion: The company plans to import battery cells (not scrap batteries) from Europe, the UK, and the US, and expects to receive the import license within 60 days once final authorization for the unit is secured, expected in the next 15 days.
Akshay Jain: "if we get into the refining of those rarer earth metals, the CAPEX as per the global average, because globally, there are only 10 or maybe 12 success stories around the world who have been leading companies in this field. And for them, the CAPEX has been in excess to half a billion dollars. So definitely, we are not prepared for that risk."
Margin Walk: What Compressed, What Recovers
- Logistics costs doubled: Freight costs rose from ₹3.2 cr to ₹6.33 cr as procurement from South India increased alongside 50% revenue growth. The Hyderabad plant is the structural fix, eliminating the need to transport southern material to Faridabad or Nasik.
- Tax provision timing distorted PAT: No tax provision was created in H1 because management initially believed they qualified for a five-year deferral. After legal and auditor consultation, they learned only ~5% of CAPEX was eligible and only for marketing spend, so they provided the full ₹3.3 cr in H2, making PAT appear lower despite higher PBT. Going forward, tax will be provided half-yearly.
- IPO funds changed the interest cost trajectory: IPO proceeds received in September were placed in FDRs, generating ₹67 lakhs in other income, but interest costs on working capital debt persisted for the first seven months of FY25. That debt has now been nearly eliminated, with outstanding borrowings reduced from ₹11 cr to ₹1 cr.
- Pre-operative and R&D spend loaded the cost base: Expansion-related hiring, R&D investment, pre-construction expenses for the Hyderabad facility, and material preloading for the battery plant all contributed to the margin decline. These are front-loaded costs that should normalize as plants become operational.
- EBITDA margin recovery path: Management declined to give formal guidance but said EBITDA margin should improve from the current 9.85% to 12–12.5%, driven by three levers: the Hyderabad plant reducing logistics costs, IPO-funded working capital eliminating interest expense, and operational efficiency gains as utilization scales toward 65–70%.
Sanjeev Kumar Srivastava: "So, when we set up a plant in Hyderabad, there is no need for bringing all those assets to either Faridabad or to Nasik. So, there will be improvement on that. Plus, last year, we have got the funds only in the month of September. So, as a result, our interest cost was there, you know, for the first seven months. Now, we are using the IPO money for the working capital. So, we expect that our operational efficiency will improve, and the margins will improve from here."
Capacity Expansion: Three Plants, One Timeline
- Faridabad at full throttle: The Faridabad plant reached 100% capacity utilization in its first year of full operation, demonstrating that demand exists to fill scaled assets when collection channels are mature.
- Nasik ramping steadily: The existing e-waste recycling plant at Nasik, in only its second year of operation since starting in 2023, is at 60% utilization and still has headroom. The adjacent Li-Ion plant adds a completely new waste stream.
- Hyderabad: bigger than originally planned: The southern facility was initially scoped at 15,000 MT on 2 acres, but the company is acquiring an additional 0.5 acre of adjacent land and increasing capacity to 25,000 MT. It is expected to be operational from Q3 FY26 and will be funded primarily through internal accruals and the sale of land in Ahmedabad, with no increase in debt planned.
- Total capacity target: The company aims to scale recycling capacity to 68,000 MT per annum by Q3 FY26, up from the current base, with overall utilization expected to reach 65–70% in FY26.
- Revenue seasonality normalizing: The historical H1/H2 split has narrowed from 25/75 two years ago to 45/55 this year, and management expects it to stabilize around 40/60 going forward, reducing the lumpiness that once made H1 look weak.
Revenue Mix Shift: Recycling and Refurbishment Gain Ground
- Recycling share rose sharply: Recycling improved from approximately 62% to 72% of revenue, reflecting higher volumes and the company's willingness to walk away from EPR business that does not meet minimum pricing compliance.
- Refurbishment growing steadily: Refurbishment moved from 12–13% to 16% of revenue, and management wants it to rise by another 2–3 percentage points this year, signaling a deliberate push into higher-value segments.
- EPR credit discipline: The company does not hold credit inventory or speculate on price hikes. It only sells EPR credits at or above the government-determined minimum price, and it let go of some business during the quarter that did not meet that threshold.
- Plastic recycling value maximization: Plastics extracted from electronics are segregated by type (ranging from under ₹10 to over ₹100 per kg), shredded for size reduction, and sold to specialized plastic recyclers, extracting maximum value from what would otherwise be low-value residue.
Akshay Jain: "we have not created a situation for ourselves where we have been excessive recycling and then waiting for our credits to go into the market. We have, you know, enough demand for the credit that we generate but the only thing is that we only deal with over minimum prices."
EPR Pricing: The Court Case and the Moat
- The challenge: Producers, led by Havells, filed a writ petition in the high court challenging the government's minimum pricing formula for EPR credits. In the last two hearings, more producers joined the petition, while recycler associations have become a party to the case.
- Management's conviction: The company believes the government will prevail because the minimum pricing formula is grounded in calculations and rationale that are already codified in the rules. Management expects the court matter "will not stay for much longer for the producers."
- Strategic behavior during uncertainty: Rather than chasing volume at depressed prices, the company is enforcing minimum price compliance and letting go of business that does not meet the threshold. This protects margins now and positions the company as a compliant player if the government wins.
- Market structure tailwind: With 85% of India's e-waste handled by the informal sector, formal players like Namo command only an estimated 2.5–3% market share. Any regulatory enforcement that shrinks the informal sector dramatically expands the addressable market for compliant recyclers.
Akshay Jain: "This is just, I think, that initial phase where there is resistance. But as you have mentioned, as it is written in the rule, clearly now the government has come out with a minimum pricing formula, which has been challenged by the producers in the court. But since the government has done all the calculations and they have a reasoning to why they have come out with these minimum prices. So, there is a rationale behind it and the matter in the court will not stay for much longer for the producers. I think the government is going to come out as a winner in this."
Balance Sheet & Cash Flow: Clean-Up in Progress
- Debt nearly eliminated: The company is now debt-free, with IPO proceeds used to adjust ₹8 cr of working capital facilities from Canara Bank and Techeco, reducing outstanding borrowings from ₹11 cr to ₹1 cr.
- Cash flow classification flagged: An analyst identified that the change in short-term borrowing was classified under cash flow from operations rather than cash flow from financing, resulting in negative cash flow from operations. Management acknowledged the issue and committed to discussing it with the auditor, but did not resolve it on the call.
- Inventory elevated but explainable: Higher inventory levels reflect three factors: preloading of raw material for the battery plant ahead of its June 2025 commissioning, bulk corporate discards received in Q4 (a seasonally busy quarter for compliance reasons), and the normal Q4 surge after inventory had dropped 20–25% in October-November following sales realization. Management expects reduced inventory levels and better cash flow going forward.
- Other income spike is transient: The 840% YoY jump in other income reflects IPO proceeds parked in FDRs generating interest. As that money is deployed into the Hyderabad plant and working capital, this income stream will diminish.
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Nasik Li-Ion plant commissioning | Plant operational; 7–8 months of business in FY26 | June 2025 (Q1 FY26) |
| Nasik Li-Ion first-year utilization | Minimum 35% capacity utilization targeted | FY26 |
| Nasik Li-Ion first-year revenue | ₹80–₹100 cr at 35% utilization | FY26 |
| Hyderabad plant operational | Capacity increased to 25,000 MT; funded via internal accruals | Q3 FY26 |
| Total recycling capacity | Scale to 68,000 MT per annum | By Q3 FY26 |
| Overall capacity utilization | Scale from 55% to 65–70% | FY26 |
| EBITDA margin improvement | Improve from 9.85% to 12–12.5% | No date (directionally committed) |
| Import license for battery cells | License expected; sourcing from Europe, UK, US | Within 60 days |
| Li-Ion plant formal authorization | Final authorization expected | Within 15 days |
| Market share | Double market share from current ~2.5–3% | Within two years |
| Tax provisioning | Half-yearly tax provision going forward | From FY26 onwards |
| Refurbishment revenue share | Increase by another 2–3 percentage points | FY26 |
Key Metrics
| Metric | H2 FY25 / FY25 |
|---|---|
| Revenue growth | 50% YoY for FY25 |
| Revenue | ₹149 cr (FY25), recycling ₹108 cr (72%), EPR ₹18.5 cr (12%), refurbishment ₹24 cr (16%) |
| EBITDA growth | 29% YoY for FY25 |
| EBITDA margin | 9.85% (FY25), vs 11.07% in FY24 and 6.61% in FY23 |
| PAT growth | 25% YoY for FY25 |
| PAT | ₹6.34 cr (H2 FY25), vs ₹5.34 cr in H1 FY25; full-year tax provision ₹3.3 cr |
| Freight costs | ₹6.33 cr (FY25), more than doubled from ₹3.2 cr in FY24 |
| Overall capacity utilization | 55% in H2 FY25, improved from 35% in H1 FY25; Faridabad at 100%, Palwal at 35%, Nasik at 60% |
| Expected FY26 capacity utilization | 65–70%, scaling from 55% in FY25 |
| Total recycling capacity | 30,500+ metric tons per annum, scaling to 68,000 metric tons per annum by Q3 FY26 |
| Cumulative e-waste recycled | Over 7 crore kg as of FY25 |
| Nasik Li-ion plant capacity | 7,000 metric tons per annum black mass, 5,000 metric tons per annum refurbishment; total cost ~₹15 cr |
| Nasik Li-ion plant first-year utilization target | Minimum 35%, adding ~₹60–70 cr revenue in FY26 |
| Hyderabad plant projected spend | ₹15–18 cr, operational by Q3 FY26 |
| Market share (formal recycling) | ~2.5–3% (per management estimate) |
| EPR recycling mandate | 60% of prior-year sales volume currently, increasing to 70% from FY26 |