Key Takeaways
- Volume-led growth in a tough cost quarter: Volume grew 9% YoY and revenue ~14% YoY, but a surge in petcoke and coal prices plus monsoon disruptions compressed the cost structure, pushing QoQ cost inflation to INR 180–190/ton.
- Surat plant is live, Kutch is next: The Surat grinding unit was commissioned in late September, and the Kutch clinker line plus jetty are on track for Q4, setting up a step-change in Gujarat volumes and a release of ~0.1 crore tons of North capacity.
- Cost headwinds are known and covered for now: Q3 fuel cost is locked at INR 1.8/kcal, but the full impact of spot petcoke at \$187–\$215/ton hits only in March, with a worst-case Q4 cost increase of INR 70–80/ton flagged.
- Premiumization hit an all-time high: Premium product share reached 45%, with both Duraguard Microfiber and Concreto Uno crossing the 1-million-ton mark, the latter in under 18 months.
- What to watch next quarter: Whether the INR 20/ton price increase sticks post-Diwali, the pace of the Surat ramp-up toward 50–60% utilization, and any further movement in spot petcoke prices that would reshape the Q4 cost outlook.
Cost Environment
- Fuel cost spike: Q2 fuel cost rose to INR 1.59/kcal (INR 1,080/ton) from Q1’s INR 1.52 (INR 1,005/ton), an INR 80/ton increase driven by higher petcoke and coal prices after the Middle East conflict escalated.
- Raw material pressure: Raw material cost added INR 60/ton QoQ because kiln shutdowns in the North and at Risda forced open-market clinker purchases, alongside cost movements in fly ash, gypsum and slag.
- Packing bags: Granule price increases early in the quarter pushed packing bag cost up INR 10/ton QoQ.
- Total Q2 inflation: Net cost inflation landed close to INR 180–190/ton versus Q1.
- Q3 cost trajectory: Management expects a further INR 100–120/ton QoQ increase: power and fuel +INR 70–80, raw material ~+INR 10, packing bags +INR 20, partially offset by the return of a busy-season surcharge waiver saving INR 10.
- Q4 cost risk: A worst-case further increase of INR 70–80/ton versus Q3 is possible, as high-cost coal hits from mid-February through March; if spot petcoke reaches \$215, the fuel cost would jump to INR 3/kcal.
- Coverage cushion: The company holds adequate fuel coverage for Q3 at INR 1.8/kcal and has coverage into mid-February for Q4, limiting the window of full spot-price exposure to March.
Jayakumar Krishnaswamy: "If petcoke prices were to go to \$215, the cost will go to INR 3 per million KCal. It will be a phenomenal increase, but we are in a pretty comfortable position."
Pricing & Realization
- Q2 pricing disappointment: Prices did not improve in line with expectations during the quarter, even as all-India cement demand grew.
- Price actions taken: Increases were implemented in late September and October across North and East in both trade and non-trade channels, with management assuming these hold post-Diwali as construction demand opens up.
- Q3 realization assumption: An average INR 20/ton price increase is expected to defray the INR 100–120/ton cost increase and provide a delta benefit in realization versus Q2.
- Fixed cost leverage turning positive: Fixed cost leverage, which was a drag in Q2, is expected to zero out or turn positive in Q3 as volumes rise.
- Q3 profitability call: If price corrections stick and the cost increase lands at INR 100–120/ton, overall profitability will improve QoQ.
Expansion Projects & Capacity
- Surat grinding unit commissioned: The 0.2 crore ton grinding unit at Limla was commissioned during the quarter, strengthening the Western India footprint.
- Surat ramp-up plan: Target is 50–60% capacity utilization in Q4 FY27, scaling to 70–75% next year, contributing an incremental 0.5 MTPA annualized volume in Q4 from the Surat plant.
- Surat clinker sourcing drag: Until Kutch clinker becomes available, Surat is running on clinker moved from Chhattisgarh and the North plus external purchases, a conscious startup-phase decision that raises landed clinker cost.
- Kutch project timeline: Phased operationalization planned from Q3 FY27; the jetty is expected operational by the first week of December after successful trial runs from Kutch to Hazira, with dredging underway.
- Kutch clinker to Surat: Once the Kutch clinker line starts in December, clinker will move via sea/barge, the cheapest mode, replacing high-cost inland sourcing.
- Viramgam terminal: The Sachana bulk cement terminal with dedicated railway siding remains on track.
- North capacity release: ~0.1 crore tons of cement capacity in the North frees up from Q4 onward as Surat takes over Gujarat volumes previously supplied from Rajasthan.
- Gujarat volume target: Annualized Gujarat volume to reach 0.2 crore tons by Q4 FY27, up from the current ~1.5 MTPA run rate.
- East expansion delayed: Consciously pushed from Q3/Q4 FY27 to Q1/Q2 FY28, a 6–8 month shift, to prioritize Vadraj capex and manage cash flow, with no additional East capacity needed in H1 FY28.
- Capacity milestone: The company is positioned to reach 3.5 crore tons of cement capacity by FY28, with multiple growth options under evaluation including Gulbarga and the North.
Jayakumar Krishnaswamy: "We took a conscious call to slightly delay the East expansion from Q3, Q4 FY27 to Q1, Q2 FY28. So, it’s just timing and a sequencing issue, however very much it is there."
Vadraj (Gujarat) Economics
- EBITDA target: Gujarat EBITDA is expected to match North EBITDA in year 3 of operations, and Vadraj EBITDA per ton should match Nuvoco’s all-India blended EBITDA per ton in the same timeframe, subject to cost inflation being offset by price increases.
- Steady-state timeline: Year 3 translates to FY29, with a possibility of reaching the target by FY28 Q4 into Q1 FY29, covering Gujarat and Western Maharashtra EBITDA per ton.
- Current drag: Until Kutch clinker flows, Surat is an expensive proposition; the sea route from Kutch will structurally lower the cost base.
Balance Sheet & Capex
- Net debt crossed INR 5,000 crores: Up ~INR 500 crores from March, driven by INR 200 crores of petcoke stocking working capital (both volume and value) and front-ended capex of INR 780 crores in H1 versus a planned INR 450–460 crores.
- H2 net debt outlook: Working capital release, higher volumes and collections are expected to bring year-end net debt back to the same range as March.
- Medium-term leverage: Over the next 4–6 quarters, net debt will hover between 2x and 2.5x EBITDA; once Vadraj volumes scale, it is expected to return below 2x EBITDA.
- FY27 capex: Full-year outlay of INR 1,200 crores, comprising INR 1,000 crores for Vadraj, INR 50 crores for Viramgam, and the balance for running operations.
- FY28 capex: INR 800–900 crores, including ~INR 800 crores for Kutch, Surat, Sachana, East debottlenecking and existing plant capex.
- Two-year envelope: FY27 plus FY28 combined capex of INR 2,000–2,100 crores.
- Interest expense: Q2 interest was lower because borrowing costs for Surat were capitalized until commercial operations began; as Surat ramps up, interest and depreciation will become visible in the P&L.
- Tax rate: H1 tax rate was elevated at 41.6% because the company remains under the old tax regime and MAT credit is not available under new Income Tax Act provisions; a decision on transitioning to the new regime is expected in the next 3–4 months.
Jayakumar Krishnaswamy: "Our stated position has been that we are comfortable anywhere between INR 3,500 crores to INR 4,000 crores, and our commitment is to find a way to get the net debt about two times EBITDA."
Demand & Regional Dynamics
- All-India demand grew in Q2, but regional trends diverged: the East saw sluggishness from erratic and heavy monsoon rainfall, while the North delivered robust volume growth that benefited Nuvoco.
- East normalization expected: Demand in the East should recover after the festival season as monsoon conditions recede.
- H2 FY27 industry outlook: Management is optimistic for 7–8% blended all-India growth, with construction activity picking up post-monsoon and festivals into the December–June cement cycle.
- Lead distance: Increased by 4 km to 332 km.
- Premium product share: Reached an all-time high of 45%, with Duraguard Microfiber and Concreto Uno both crossing 0.1 crore tons; Concreto Uno is claimed as the fastest premium product to reach that mark in the industry.
- Regional growth data withheld: Management declined to share East versus North regional growth figures on the call.
Jayakumar Krishnaswamy: "My inference is if you have a back-to-back year where things go wrong either in monsoon or in drought, then the demand gets impacted to 5% kind of a number. That's what the historical data says. But I'm assuming that doesn't happen next year."
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Q3 fuel cost | INR 1.8/kcal, translating to INR 70–80/ton energy cost increase vs Q2 | Q3 FY27 |
| Q3 net cost inflation | INR 100–120/ton QoQ increase | Q3 FY27 |
| Q3 realization | Average INR 20/ton price increase to defray cost increase | Q3 FY27 |
| Q4 cost increase (worst-case) | Further INR 70–80/ton vs Q3 | Q4 FY27 |
| Surat capacity utilization | 50–60% in Q4 FY27, 70–75% next year | Q4 FY27 / FY28 |
| Gujarat annualized volume | 2 MTPA by Q4 FY27, from ~1.5 MTPA currently | Q4 FY27 |
| North capacity release | ~0.1 crore tons released from Q4 onward | Q4 FY27 onward |
| Kutch clinker availability | Clinker from Kutch by end of Q3; jetty operational by first week of December | Q3/Q4 FY27 |
| FY27 capex | INR 1,200 crores | FY27 |
| FY28 capex | INR 800–900 crores | FY28 |
| East expansion | Delayed to Q1/Q2 FY28 | Q1/Q2 FY28 |
| Vadraj EBITDA parity | Gujarat EBITDA to match North EBITDA; Vadraj EBITDA/ton to match Nuvoco all-India blended EBITDA/ton | Year 3 (FY29, possibly FY28 Q4) |
| Tax regime decision | Evaluation of old-to-new regime transition | Next 3–4 months |
| Year-end net debt | Expected to return to March FY27 range | March FY27 |
Key Metrics
| Metric | Q2 FY27 |
|---|---|
| Volume growth | 9% YoY |
| Revenue growth | ~14% YoY |
| EBITDA growth | 11% YoY |
| Premium product share | 45%, historic high |
| Trade mix | 75% |
| Blended cement ratio | 83%, up from 82% in Q1 |
| Fuel cost per million kcal | ₹1.59, up from ₹1.52 in Q1; energy cost of ₹1,080 per ton |
| Fuel mix | Coal 66%, petcoke 27%, AFR 6% |
| CK ratio | 1.75, up from 1.73 in Q1 |
| Road:rail share | 64:36, unchanged from Q1 |
| Lead distance | 332 km, up from 328 km in Q1 |
| Net debt | Crossed ₹5,000 cr, up ~₹500 cr from March 2026 due to petcoke stocking and front-ended capex |
| H1 FY27 capex | ₹780 cr, versus original plan of ~₹450–460 cr |
| Full-year FY27 capex guidance | ₹1,200 cr, of which ₹1,000 cr for Vadraj, ₹50 cr for Viramgam |
| FY28 capex outlay | ₹800–900 cr, including ~₹800 cr for Kutch, Surat, Sachana, East debottlenecking |
| Surat grinding unit capacity utilization | 50–60% expected in Q4 FY27, 70–75% next year |
| Q3 FY27 expected fuel cost per million kcal | ₹1.8, translating to ₹70–80 per ton increase in energy cost QoQ |
| Q3 FY27 expected cost inflation QoQ | ₹100–120 per ton, driven by power and fuel, packing bags, and busy season surcharge |
| Q3 FY27 price increase taken | ~₹20 per ton average across North and East in October |
| Q3 FY27 net profitability improvement QoQ | ₹70–80 per ton, if prices and costs hold (per an analyst's math, which management did not confirm) |
| 1H FY27 effective tax rate | 41.6% on reported basis, due to old tax regime and MAT credit unavailability |