Key Takeaways
- Sanctions surge, disbursements slip: Sanctions hit a 10-quarter high of ~INR1,050 crores, but Q2 disbursements missed the ~INR1,000 crore target by a wide margin as an extended monsoon deferred construction activity. The shortfall is not cancelled, only pushed to Q3.
- Asset quality transformed: Gross Stage III assets fell 75% YoY to INR193 crores, with only one legacy NPA (Danu Wind) remaining. No new slippage has occurred in years, and all loans disbursed since FY18 remain standard.
- Strategic pivot to private sector and SMEs: 100% of Q2 disbursements went to private sector borrowers, and the company launched a new NBFC/SME lending vertical, targeting better margins and portfolio sustainability versus fast-repaying government clients.
- Board disruption contained: Three Independent Director resignations in late September surprised management but did not trigger a rating downgrade. A new ID (former LIC MD) has been appointed, and capital raising waits on full board reconstitution.
- What to watch next quarter: Whether the deferred Q2 disbursements actually land in Q3 alongside new sanctions, progress on the Danu Wind resolution (which could bring a INR220-230 crore write-back), and the pace of board reconstitution to unlock the planned INR300-500 crore capital raise.
Disbursement Miss & Pipeline
- Monsoon disrupted offtake: The better-than-normal monsoon in late August and September reduced power demand and halted construction activity, causing customers to defer drawdowns. Management stressed the shortfall is deferred, not lost.
- Volatility is structural: With only 8-9 projects disbursing in a quarter, quarterly numbers are inherently lumpy. Management urged investors to track a 4-quarter running average for a more predictable indicator.
- Q3 catch-up expected: A robust sanctioned pipeline plus the deferred Q2 cases mean Q3 is expected to see close to INR1,000 crores in disbursements. By December, the company aims to disburse both the shortfall and new sanctions.
- Sanctions target raised: The company plans to sanction more than INR1,500 crores in Q3, with over INR1,000 crores of documents already in the pipeline and ready for upcoming committee meetings.
- FY26 disbursement guidance cut: Full-year disbursement guidance was revised down to INR2,500-3,000 crores from the earlier INR4,000 crores, reflecting the H1 miss and a more realistic ramp.
Sanjeev Kumar: "We had earlier projected a disbursement of around INR1,000 crores in Q2 FY '26, but somehow, we fell short of that. And we fell short of that, with quite a margin. But that shortfall was not cancelled disbursement, this is only deferred to the next quarter."
Asset Quality & Resolutions
- Clean-up nearly complete: Gross Stage III fell from INR764 crores to INR193 crores over the past year. Vento Power was resolved in Q2 via a change in management to Enviro Infra Engineers, concluding INR115.6 crores. A technical write-off of INR138.60 crores in loans and equity was also executed.
- Danu Wind: the last NPA: Only one stressed account remains. Management is pursuing 2-3 resolution paths and expects resolution this fiscal year, which would trigger a write-back of INR220-230 crores.
- Zero fresh slippage: No new NPA has been added in the last few years. Every loan account disbursed since FY18 continues to be standard, a track record management highlighted as evidence of underwriting discipline.
- Long-term asset quality targets: The company is targeting Gross NPA of 3% and Net NPA of ~1%, with annualized credit costs not exceeding 60-70 bps.
Strategic Shift: Private Sector & SME
- 100% private sector disbursements in Q2: The deliberate pivot reflects a hunt for better margins and portfolio longevity. Government clients repay very fast without notice, creating asset-liability mismatches, and demand rates the company finds unsatisfactory.
- NBFC/SME lending vertical launched: The company entered B2B2C lending to NBFCs and manufacturing SMEs, hiring an industry expert with 10-15 years of experience. Robust risk management systems are in place, with a hard cap of 6-7% of the portfolio even in the medium term.
- Structured finance over vanilla project finance: Target areas include CBGs, ethanol products, EPC funding, working capital, and small-ticket SME funding in solar and wind. Ticket sizes are shifting down to INR50-100 crores, with partnerships planned for sub-INR100 crore loans to manage acquisition costs and customer quality.
- New sectors on the radar: Future plans include lending to hospitals, educational institutions, and big-brand hotels, further diversifying the book.
Sanjeev Kumar: "We are focusing on our core sector where we can get the margins what is expected by the shareholders. And the longevity of the lending also because the government sectors used to actually repay very fast without any intimation that creates a problem for lenders always."
Funding, Ratings & Board
- Cost of borrowing trending down: The cost of funds fell to 9.49% from 9.67% in Q1, with Canara Bank and Bank of India reducing spreads. Discussions with other banks are in the pipeline for further reductions.
- Rating resilience tested and held: Following the Independent Director resignations, CRISIL and ICRA reviewed the ratings and took no negative action, unlike a prior episode. Proactive engagement with regulators has left them satisfied.
- Rating upgrade path: A rating upgrade is expected once the loan book crosses INR5,000-5,500 crores and fresh credit lines from banks are secured. Management sees this as realistic toward annual results (FY26 end), with anything earlier a bonus.
- Board reconstitution underway: Ms. Mini Ipe, former Managing Director of LIC, has been appointed as an Independent Director. Steps are being taken to appoint two more IDs. The planned INR300-500 crore capital raise will proceed only once the board is fully reconstituted.
R. Balaji: "Realistically, I think one wants to be very pragmatic, once if our book crosses INR5,000 crores, INR5,500 crores, and we get a couple of sanctions, fresh credit lines from the banks, we'll be getting a rating upgrade."
Independent Director Resignations
- Surprise event, no management dispute: On September 26, three Independent Directors resigned. Management stated there were no issues with management and the resignations came as a surprise.
- Fund-raising impact acknowledged: Management conceded that decision-making at banks may take longer as a result, but did not directly address a specific analyst concern about potential Q4 liquidity constraints.
- Remediation in motion: One new ID has been appointed, and the process to fill the remaining two vacancies is ongoing. The capital raise is contingent on full reconstitution.
R. Balaji: "On September 26, 3 Independent Directors resigned. And what I would like to reiterate there were no issues with the management, and it was a surprise."
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Q3 disbursements | Close to INR1,000 crores, including deferred Q2 cases and new sanctions | Q3 FY26 |
| Q3 sanctions | More than INR1,500 crores, with INR1,000+ crores of documents ready | Q3 FY26 |
| FY26 disbursements | INR2,500 to INR3,000 crores (revised down from INR4,000 crores) | FY26 |
| Danu Wind resolution | Resolution expected with write-back of INR220-230 crores | FY26 |
| Capital raise | INR300-500 crores, contingent on full board reconstitution | Most probably FY26, possible spillover |
| Rating upgrade | Once book crosses INR5,000-5,500 crores and fresh bank credit lines secured | Toward FY26 annual results |
| NBFC/SME portfolio cap | Not to exceed 6-7% of portfolio | Medium term |
| Long-term asset quality | Gross NPA 3%, Net NPA ~1%; credit cost not more than 60-70 bps annualized | Long-term |
Key Metrics
| Metric | Q2 FY26 |
|---|---|
| Revenue | ₹132 cr |
| PAT | ₹88 cr |
| Net worth | ₹2,978 cr, up from ₹2,754 cr in March 2025 |
| Cost of borrowing | 9.49%, down from 9.67% in Q1 FY26 |
| Gross NPA | 5.23%, down from 10.22% |
| Net NPA | 1.32%, down from 4.13% |
| Gross Stage III | ₹193 cr, down 75% YoY from ₹764 cr |
| Net Stage III | ₹47 cr, down 83% YoY from ₹283 cr |
| Loan sanctions | ₹1,048 cr, highest in 10 quarters, entirely to private sector |
| Disbursements | ₹326 cr, 100% to private sector |
| Technical write-off | ₹138.60 cr of loans and equity during Q2 |
| Vento Power resolution | ₹115.6 cr transaction fully concluded in Q2 |
| Danu Wind principal outstanding | ~₹188 cr, expected recovery of ₹220-230 cr |
| Full-year disbursement guidance | ₹2,500-3,000 cr, revised from earlier ₹4,000 cr |
| Long-term gross NPA target | 3%, with net NPA of ~1% |
| Long-term annualized credit cost guidance | 60-70 bps |