Key Takeaways
- Record revenue, steady margins: Total income hit an all-time high of INR499 crores, up 10% YoY, while EBITDA margins held at 16.3% as operating leverage absorbed annual bonus costs booked in Q2.
- Mix shift toward higher value-add: High value-added assemblies grew 16.5% and stator frame/rotor shaft integrated assemblies grew 33.4%, while loose lamination and raw castings declined, pulling the product mix upward.
- Inventory and debt both swelled on steel sourcing disruption: Inventory rose ~INR80 crores and net debt moved in lockstep as BIS nonrenewal of Chinese mills forced a switch to longer-lead-time imports from Korea and Japan; both stay elevated until Indian capacity comes online in FY27.
- Forging is the next adjacency, but the balance sheet says wait: Management sees forging as a natural horizontal move with captive demand, but a greenfield project would cost ~₹150 crores and the company is unwilling to stretch debt further until current plans stabilize.
- What to watch next quarter: Whether the Bangalore capacity ramp-up delivers the Q4 order flows promised, any easing in the steel sourcing bottleneck, and the resolution with the U.S. customer that management flagged as carrying some near-term pain.
Revenue Mix & Margin Mechanics
- Standalone growth slowed deliberately: Standalone sales grew only 4% YoY because equipment and manufacturing are being shifted among Bangalore, Aurangabad and Hyderabad to optimize production near customers, with legacy Pitti Engineering business transferring to subsidiaries.
- Subsidiary margin drag: Subsidiary margins ran at ~10% versus the 16.5% consolidated figure, pulled down by underperformance at Pitti Industries (lamination, Bangalore); Dakshin Foundry operates at ~17%, in line with the parent.
- Q2 cost spike is seasonal, not structural: The sharp jump in operating and manufacturing expenses quarter-on-quarter reflects annual bonuses and Foundation Day-related costs, which are historically booked in Q2.
- Margin protection is built into contracts: Raw material is pass-through with customers, and every 3–5 years overhead is renegotiated based on a transparent costing model; growth in the machine components business helps offset any margin pressure since margins are blended at the EBITDA level.
- Per-ton realization ladder: Loose lamination and low value-added assemblies yield ~INR170,000 per ton; high value-added assemblies yield ~INR250,000 per ton; stator frame and rotor shaft integrated assemblies yield INR675,000 per ton.
Akshay Pitti: "loose lamination and low value-added assemblies would be about INR170,000 per ton. High value-added assemblies would typically yield about INR250,000 a ton. Stator frame and rotor shaft integrated assemblies would yield at INR675,000 a ton."
Steel Sourcing Disruption
- The trigger: Quality control orders and BIS nonrenewal of Chinese mills disrupted availability of various steel grades in India, forcing the company to begin importing from BIS-approved mills in Korea and Japan, which elongated the holding period and bloated inventory by ~INR80 crores.
- Import strategy locked in: Management decided to source ~25% of total requirements from imports until the Indian situation stabilizes, a reversal of the fully domestic posture adopted post-COVID in 2020.
- Normalization depends on Indian capacity: If the quality control orders and BIS restrictions were withdrawn, the situation would regularize very early; if not, normalization waits until domestic capacities increase, which is slated for FY27.
- Net debt mirrors inventory: Net debt increased similarly to inventory and will remain at the current elevated level until the sourcing issue stabilizes; if raw material were resolved, net debt would be ~₹400 crores.
- Cash is spoken for: The INR140 crores of cash on the books includes margins for letters of credit and funds kept aside for ongoing capex; management does not like to intertwine long-term and short-term funds.
Capacity Expansion & Utilization
- Bangalore ramp-up underway: Capacity increase at the Bangalore facility has already started, with order flows expected from Q4 onwards; in the near term, the facility will focus on loose and low value-added assemblies, where significant growth is expected.
- Capex phasing: By the end of FY26, close to 8,000–9,000 tons of capacity will be added; the remainder gets added in FY27 before H1.
- Utilization targets: Consolidated capacity utilization should reach 80% progressively by the end of FY27; casting capacity of ~25,000 tons is targeted at 80% utilization (18,000 tons of castings and machine components) by FY28.
- Machine hours are the next bottleneck: Machine hours added are not commensurate to handle the transition from raw casting to machining plus the increase in foundry capacity; additional tactical investment in machining will be required.
- Lamination volume roadmap: FY26 target of 70,000 tons is quite assured, with anything beyond on a best-effort basis depending on the Q4 Bangalore ramp-up; FY27 target is ~80,000–83,000 tons; FY28 target is 90,000–94,000 tons.
End-Market & Customer Developments
- Data center momentum broadening: Two more customers are entering the data center segment, predominantly export opportunities, and the current outlook from customers on this product line remains very, very strong.
- New customer wins: Xylem was added to the client base this quarter for casting business to the U.S. market, alongside SKF for casting business to the U.S.; two additional Europe-based clients were added but cannot be disclosed yet, with one expected to represent a significant increase in lamination volume over the next two years.
- Railway exposure is mostly international: 32% of total revenue comes from railway sectors, but only 8% is exposed to domestic Indian Railways and metro tendering; the international business with Alstom, Wabtec, and Siemens India remains strong on multiyear contracts.
- Order cycle varies sharply by segment: Locomotive traction motors run on multiyear contracts won back-to-back with Indian Railways; low-voltage motors operate on 2–3 week firm orders, with customer forecasts of 1–3 years that are ~90% accurate at one year and ~75–80% accurate at three years.
- Machine components growth trajectory: The machine components business is expected to grow significantly, targeting ~15,000 tons of raw castings and machine components combined over the next three years, up from the current ~10,000–11,000 tons.
Akshay Pitti: "The new product lines which have been approved and not just the one customer that I think you are referring to, there are two more customers which are coming into this segment. They are predominantly export opportunities."
U.S. Business & Tariff Dynamics
- Section 232 as equalizer: The 50% tariff on steel, iron, aluminum and copper applies to material content regardless of origin country, so India's pre-existing 50% tariff position means reciprocal tariffs make no difference relative to competitors; management expects India will eventually get a trade deal with the U.S.
- Mexico is the real beneficiary, not the U.S.: Management observed that exports going to the U.S. are creating jobs in Mexico, where Tier 2 assemblies are migrating to Tier 1; if the tariff situation persists, more value-add is expected in Mexico rather than onshoring in the U.S., because Mexico is no longer cheap for manufacturing and steel availability and cost are high there.
- U.S. customer resolution in progress: The company is getting into some kind of resolution with a U.S. customer that will help grow the U.S. business going forward; some pain is expected in the near term but the outcome is viewed as overall positive.
- North America revenue opaque: Management gave full-year U.S. revenue of $16 million and Mexico of ~$35 million, and said H1 North America revenue of ~₹25–30 crores is better both year-on-year and quarter-on-quarter, but did not provide the exact prior-year comparison figure requested.
Akshay Pitti: "Section 232 tariff is a great equalizer for all countries... exports which are going to U.S. are ironically creating jobs in Mexico now."
Strategic Adjacencies & Capital Allocation
- Forging as the next casting: Management views forging as a very good horizontal adjacency with a quick ramp-up, driven by captive requirement (422 tons of shaft consumption last quarter) plus customer demand for forged components; the company already machines forged components by outsourcing.
- Forging investment held back by balance sheet caution: A greenfield forging project would cost ~₹150 crores (land, building, equipment), with equipment alone at ~₹60–70 crores, plus additional machining investment to make it sticky; management is not comfortable going beyond current elevated debt levels and is waiting for current plans to pan out and the balance sheet to stabilize.
- Copper winding remains off the table: Management is still hesitant to enter copper winding because it is very working capital-intensive due to the value of copper, without commensurate margins or ROCEs; entry would only happen if a customer forced it.
- Inorganic growth on the radar beyond FY27: Until FY27, the strategy is clear on organic growth; beyond that, the focus shifts to inorganic opportunities, with management engaging with multiple competitors to see what would be available at an appropriate time.
- Geographic expansion northward: The company intends to move toward the north of India, looking for something inorganic in that segment first; if nothing is available, it will consider a greenfield approach.
Akshay Pitti: "It would be a very good horizontal adjacency, just the way we got the casting going. This would be a very quick ramp-up that we could do."
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Consolidated capacity utilization | Reach 80% utilization | Progressively by end of FY27 |
| Lamination volume | 70,000 tons (assured); 80,000–83,000 tons | FY26; FY27 |
| Lamination volume | 90,000–94,000 tons | FY28 |
| Casting and machine components volume | 18,000 tons (80% utilization of expanded capacity) | By FY28 |
| Machine components growth | ~15,000 tons of raw castings and machine components combined (from ~10,000–11,000 tons currently) | Over next three years |
| Bangalore capacity | Order flows to begin | Q4 FY26 onwards |
| Raw material normalization | Situation regularizes if COQ/BIS withdrawn; otherwise waits for Indian capacity addition | Very early if withdrawn; FY27 if not |
| Net debt | Remain at current elevated level | Until sourcing issue stabilizes |
| Organic growth rate | Continue at similar rate, subject to macroeconomic conditions | Until FY27 |
| Inorganic growth focus | Shift to inorganic opportunities | Beyond FY27 |
| U.S. business | Resolution with U.S. customer; some near-term pain, overall positive | Ongoing |
Key Metrics
| Metric | Q2 FY26 |
|---|---|
| Total income | ₹499 cr, +10% YoY, highest quarterly figure in company history |
| EBITDA | ₹78 cr, +17.5% YoY |
| EBITDA margin | 16.3%, stable |
| Operating revenue (H1 FY26) | ₹477.72 cr |
| Exports | ₹135 cr, 28% of operating revenue |
| North America revenue | ₹40 cr |
| US business (full year) | $16 million |
| Mexico business (full year) | $35 million |
| Lamination volumes | 17,722 tons, up from 16,792 tons YoY |
| Loose lamination and low value-added assemblies | 11,801 tons, down 2% YoY |
| High value-added assemblies | 3,168 tons, +16.5% YoY |
| Stator frame and shaft integrated assemblies | 1,146 tons, +33.4% YoY |
| Machine casting volume | 2,434 tons, down from 2,583 tons YoY |
| Raw castings | 1,354 tons, 11.3% decline YoY |
| Machine castings | 1,080 tons, +2% YoY |
| Traction motor and railway components revenue share | 32% of total revenue |
| Indian railways revenue share | 8% of total revenue |
| Data center revenue share | 4% of total revenue, up from 2% YoY |
| Standalone sales growth | 4% YoY |
| Subsidiaries growth | 60% YoY |
| Dakshin Foundry EBITDA margin | ~17% |
| Inventory increase (March to September) | ₹80 cr |
| Net debt | Increased by similar amount as inventory |
| Cash on books | ₹140 cr |
| Capex announced | ₹150 cr, of which ₹80 cr in FY26, ₹70 cr remaining |
| Electrical steel deficit in India | ~200,000 tons |
| Lamination sales target FY26 | ~70,000 tons |
| Lamination sales target FY27 | ~80,000–83,000 tons |
| Lamination sales target FY28 | 90,000–94,000 tons |
| Machine components current volume | ~10,000–11,000 tons per year |
| Raw castings and machine components target (3 years) | ~15,000 tons |
| Castings and machine components target FY28 | 18,000 tons |
| Shaft consumption | 422 tons in Q2 |
| Net debt absent raw material disruption | Would have been ₹400 cr |
| Current casting capacity | 18,600 tons, increasing to ~25,000 tons |