Key Takeaways
- Stable quarter absorbing expansion costs: 9M FY23 top line of ₹1,040 crores was marginally in line with the prior year, while EBITDA margin compressed to 5.7% from 6.8% as the company absorbed overheads from new project recruitments and higher utility costs.
- Multiple new verticals moving from trial to commercial: Aluminum production commenced in December 2022, plastics trial production is underway, and the green lead project is expected to reach commercial production in Q4 FY23, setting up a materially broader portfolio for FY24.
- Inorganic move adds land bank and optionality: The ~₹32.5 crore NCLT acquisition of Harsha Exito brings 25 acres of land with 160,000 sq ft of shed space, located strategically between existing Tamil Nadu and Andhra plants, with plans for glass fiber processing and potential backward integration.
- Management prefers to under-commit: FY24 revenue growth is guided at 15–20% with an intent to push higher, while two-digit EBITDA margins are targeted "in the coming years," reflecting a deliberate posture of absorbing project costs now for future returns.
- What to watch next quarter: Whether green lead and plastics achieve commercial production on schedule by March–April 2023, the pace of aluminum ramp-up, and any pass-through of higher utility costs in customer contract renewals.
Portfolio Expansion: New Verticals Go Live
- Aluminum: Commercial production began December 2022 with 12,000 MTPA authorized capacity; product rolled out into the domestic market in trial phases and was well received. Phase 1 capex was ~₹4.5–5 crores since the plant was already ready.
- Plastics: Trial production started for Phase 1 (12,000 MTPA); four recycling verticals are now live with trial runs completed with a good number of OEMs. Focus segments are PPE, EPCP, LDP, HDP including biodegradable, not primarily PET. Full commercial production targeted by second half of March, with April as the first full month.
- Plastics scaling path: Phase 2 expansion to 24,000 MTPA becomes easier due to existing land bank with ready building; investment will be similar to Phase 1 and mostly funded through retained earnings and Phase 1 earnings. Peak production targeted within first two quarters of operation, with complete utilization by the third quarter.
- Green lead: Installation and commissioning in extreme final stages; trial runs expected within 15–20 days, commercial production targeted in Q4 FY23. The technology is expected to reduce greenhouse gas emissions, and the company is considering solar power to make it purely green.
- Green lead pricing advantage: International customers with their own green obligations are looking at a green product where POCL may gain specific price advantages over regular-process lead. An ESG Report is expected in the next financial year.
- Plastics value-added products: First value-added product line planned on the plastic side; company expects market acceptance of recycled products will give an edge and may extend the approach to other recycled verticals later.
Ashish Bansal: "This is an interesting phase in your company, and is extremely important to note that despite entering into multiple projects and expanding our portfolio, the financials are marginally at par with previous financial years, which enables the company to get ready for a commercially viable operational portfolio as a whole."
Lead Business & Market Structure
- Core lead franchise: Achieved 17–20% volume CAGR over the last 3–4 years, driven by product strength and a bullish outlook on lead as a non-ferrous metal. Expects 15–20% volume growth in coming years.
- Market reorganization tailwind: Government initiatives on vehicle scrapping policy and circular economy are reorganizing the market, bringing volumes into the organized segment and reducing unhealthy competition from unorganized players. Buyers are shifting from smaller players to more stable, organized larger players, helping POCL increase market share.
- Domestic procurement shift: Import proportion of scrap procurement reduced from 80–85% to 70–75%, described as a good move. Government push on scrapping vehicles older than 15 years is expected to bring more scrap through organized channels, creating larger domestic sourcing opportunity.
- China reopening impact: China does not export lead due to export duties, so reopening does not directly affect lead supply or selling prices. Any indirect effects from battery exports or internal demand growth are expected to offset each other, not materially impacting margins.
- Glencore relationship: Glencore has been a customer for over 15 years (since ~2008–09); POCL claims to be the first Indian company to supply lead to Glencore. Glencore's separate tie-up with ACE Green is for lithium-ion recycling offtake, distinct from POCL's licensing arrangement with ACE.
Ashish Bansal: "So all of this together gives us a lot of advantage in terms of future growth on a continual basis."
Harsha Exito Acquisition
- Deal structure: Acquired via NCLT order pronounced 12 January 2023; takeover intended to be completed before end of financial year. Investment confirmed at ~₹32.5 crores.
- Asset: 25-acre land with ~160,000 sq ft ready shed space, located ~45 km from port, centrally between Tamil Nadu and Andhra plants. The existing business involves production of Chopped Strand Mat and Glass Fibers.
- Planned use: Only a part of the land is planned for the Chopped Strand Mat process; the company is also looking at expansion of existing product portfolio on the remaining land bank. Technical team is reviewing glass machinery status and market potential.
- Backward integration potential: Management is studying feasibility of backward integrating glass fiber production through recycling processes, potentially via the plastics division, looking at technical fibers in plastic. The technical feasibility study is ongoing.
- Land value: When pressed by an analyst, management provided a market value range for the land, though the initial response was indirect.
Margins & Cost Environment
- 9M FY23 margin compression: EBITDA of 5.7% vs 6.8% in prior year-to-date nine months, attributed to short-term overhead increases from new recruitments for aluminum, copper, and lead operational efficiencies, plus substantially increased production costs for utilities, fuel, and power.
- Cost pass-through in progress: Increased utility and fuel costs are being reviewed for pass-through to customers during contract renewals. Extreme volatility in fuel prices and freight costs pushed projections away from targets.
- FY23 vs FY22 comparison: Top line and bottom line expected to be more or less in line with FY22, but management considers FY23 superior because it absorbs costs of all new projects while delivering similar numbers on an apple-to-apple comparison.
- EBITDA margin target intact: Company is still targeting 150 bps YoY EBITDA margin improvement; expects to achieve numbers in coming years once fuel and freight costs stabilize and new contract negotiations are completed.
- Green lead margin contribution: The green recycling facility will add to EBITDA once the product is accepted by customers to fulfill their green targets and marketed as a green product. However, the approach will always be a blended one between smelting and green technology because costing will always come to the forefront.
Ashish Bansal: "This one year has been extremely volatile, I'm sure, for most of the companies across the board in terms of your fuel prices, your freights and all. These kind of extreme swings, I mean, do little bit push the company's projections away."
Forward Pipeline & Strategic Optionality
- Copper expansion: Thought process is on; in the next financial year, the company will look at copper and other value-added products in copper. Currently prioritizing stabilization of aluminum, plastics, and green lead verticals first.
- Lithium-ion battery recycling: Currently in R&D and pre-feasibility stage, evaluating approximately three different technologies. EV market still nascent in India with small, largely unorganized lithium-ion battery availability. Company will be ready ahead of the cycle with a commercial recycling process.
- POCL Future Tech: Trial productions are over, second phase of machines installed; complete machinery installation targeted by February end. ACE technology commercial product rollout expected in first half of March. Both expected up and running by end of FY23.
- Geographic expansion: Not limiting to South India; will move to other regions where market is lucrative in raw material sourcing and finished product sales. Hub-and-spoke model with port selection targeting specific customer audiences in Southeast Asia, Europe, or U.S. Definitely looking at international projects, not limiting to just India.
- Overseas ambition: Once current projects, specifically the green lead project, are successful and proven techno-commercially viable, the company would like to spread wings across other geographies internationally, targeting countries looking at green technology for recycling needs.
- EPR opportunity: EPR regulations expected to increase market potential and demand; EPR could be a predominant factor at least at one location to sponsor and run an entire plant, depending on geographic location.
- Tolling business: Treated as a separate vertical; currently doing some tolling, which lowers working capital requirement but also lowers margins.
Ashish Bansal: "Once our current projects and specifically our green lead project, once it is successful and it is up and running, which is techno-commercially viable, we definitely would like to spread our wings across in other geographies..."
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Green lead commercial production | Trial runs within 15–20 days; commercial production to begin | Q4 FY23 |
| Plastics full commercial production | Full form commercial production start; April first full month | Second half of March 2023 |
| Plastics peak utilization | Complete utilization of Phase 1 plant | Within first two quarters of operation (~Q2–Q3 FY24) |
| POCL Future Tech & ACE technology | Both up and running | End of FY23 |
| ERP go-live | State-of-the-art ERP implementation | Q1 FY24 |
| Harsha Exito takeover completion | As per NCLT order guidelines | Before end of FY23 |
| FY24 revenue growth | 15–20% growth, with intent to push higher | FY24 |
| EBITDA margin improvement | 150 bps YoY improvement once fuel/freight stabilize and contract renewals complete | Coming years |
| Two-digit EBITDA margins | "To start with in the coming years" | FY24–FY25 directional |
| Copper expansion evaluation | Looking at copper and value-added products in copper | Next financial year (FY24) |
| ESG Report release | First ESG Report publication | Next financial year (FY24) |
Key Metrics
| Metric | Q3 FY23 |
|---|---|
| Revenue (9M FY23) | ₹1,040 cr, marginally in line with 9M FY22 volumes |
| Revenue growth (QoQ) | Over 20% vs Q2 FY23 |
| EBITDA margin (9M FY23) | 5.7%, vs 6.8% in 9M FY22 |
| EBITDA margin (Q3 FY23) | 5.7%, vs 6.8% in Q3 FY22 |
| Current ratio | 1.96, continuous improvement at optimum level |
| Long-term debt equity | Nil, status quo |
| Sales mix | 55% exports, 45% domestic |
| Procurement mix | 25% domestic, 75% imports, down from 80–85% imports earlier |
| Cash flow from operations (9M FY23) | ₹0.87 cr net, operating profit of ₹57.47 cr |
| Capex spent (9M FY23) | ₹24 cr |
| FY23 full-year outlook | Marginally positive, top and bottom line in line with FY22 |
| FY24 revenue growth target | 15% to 20% |
| Lead volume growth expectation | 15% to 20% going forward |
| Aluminum capacity (Phase 1) | 12,000 MTPA, commercial production commenced Dec 2022 |
| Plastics capacity (Phase 1) | 12,000 MTPA, trial production commenced |
| Plastics Phase 1 investment | ₹12 cr to ₹15 cr |
| Plastics Phase 1 expected turnover | ₹100 cr |
| Plastics Phase 1 anticipated EBITDA margin | 10% to 12% |
| Harsha Exito acquisition investment | ₹32.5 cr |
| Harsha Exito land market value | ₹30 cr to ₹35 cr for 25 acres alone, excluding buildings |
| Green lead commercial production | Expected by second half of March 2023 |
| CAGR target (next 3–4 years) | ~20%, taking FY23 as base |
| EBITDA margin target (medium-term) | Two-digit EBITDA in coming years; earlier target of 150 bps YoY improvement |