Key Takeaways
- Profit growth stalled by regulatory reset: Consolidated PAT grew just 0.3% YoY as a ~₹300 crore half-year hit from reduced O&M charges under new CERC regulations masked underlying asset growth.
- TBCB wins are running hot: Won 8 of 13 projects in Q2 and 4 of 6 in Oct-Nov, including the landmark Khavda-Nagpur HVDC, pushing the project pipeline toward a potential ₹3 lakh crore-plus by 2032.
- Capitalization inflection is coming: FY25 capitalization is flat at ~₹18,000 crore, but management guides a jump to ₹25,000-30,000 crore in FY26 and ~₹40,000 crore in FY27, the moment when the current TBCB win streak converts to earnings.
- EESL drag is real and unresolved: The smart-meter JV contributed a ₹100 crore consolidated loss this half; management is pursuing Ministry intervention but offered no commitment that losses will stop.
- What to watch next quarter: Whether the Power Ministers' Conference on 12 November produces a concrete EESL receivables resolution, the pace of HVDC tender awards (Leh-Kaithal, KPS-3), and any upward revision to the FY25 capex target beyond ₹20,000 crore.
Profit Bridge: Why 0.3% When Assets Are Growing
- The O&M reset is the story: New CERC tariff regulations for 2024-29 reduced annual O&M charges by ~₹600 crore, stripping ~₹300 crore from H1 profit. Without this, management says PAT growth would have been 4-5%, not 1-2%.
- RTM revenue is structurally declining: Legacy regulated assets past the 12-year mark see depreciation drop from 5.28% to ~2%, and as loan principal shrinks, interest income falls too. This RTM revenue decline is being almost exactly offset by new TBCB revenue, keeping the top line flat rather than growing.
- EESL added a 1.5% profit drag: The JV operates an annuity model (capex upfront, monthly recovery) but mounting receivables forced it into short-term borrowing for interest servicing. POWERGRID has stopped putting in fresh equity over the last year. The ₹100 crore consolidated loss shaved roughly 1.5 percentage points off profit growth.
- Late-quarter commissioning delayed tariff recognition: ₹4,000 crore of projects were commissioned in August-September, so tariffs will only flow in coming months, not in the April-June period before commissioning.
Tyagi: "As per the new CERC Regulation, our O&M charges have been reduced by almost 600 crore. So for half year, the effect is almost 300 crore. So effectively it is positive by say 1pc or 2pc but it is not in the same range where it should have been because there is a loss of about 300 crore which is a major contributor for our profit, not increasing say to 4-5pc."
TBCB Wins & The Project Pipeline
The bid-win machine is outperforming: POWERGRID won 8 of 13 projects in Q2 (62% by number, 75% by NCT cost, 78% by annual tariff) and 4 of 6 in October-November. The implied win ratio in inter-state transmission is north of 50%.
| Project | Details |
|---|---|
| Khavda-Nagpur HVDC | Won in Q2; part of the green-energy corridor evacuating RE from Gujarat |
| Dynamic Reactive Power Compensation at Khavda | Won in Q2; critical for grid stability in the RE-rich Khavda region |
| Bikaner-III, Bhadla-III, Khavda Phase-IV Part B | Won in Q2; Rajasthan and Gujarat RE evacuation packages |
| Jamkhambhaliya (Gujarat), Jaisalmer-Barmer (Rajasthan) | Won in Q2; intrastate and inter-state links |
| Shongtong Karchham Wangtoo (Himachal Pradesh) | Won Oct-Nov; ₹2,286 crore |
| Rajasthan Phase 4 Part A & B | Won Oct-Nov; ₹5,969 crore and ₹5,357 crore respectively |
| Kudankulam transmission system | Won Oct-Nov; ₹548 crore |
- The NEP math is enormous: The National Electricity Plan envisions ₹9.16 lakh crore in transmission spend through 2032, with ~₹3.30 lakh crore already executed, under execution or bid out. The balance ~₹5.86 lakh crore is yet to be bid. Management assumes ~50% winnability, implying ~₹1.92 lakh crore in additional wins on top of the current ₹1.43 lakh crore order book, taking total execution beyond ₹3.35 lakh crore by 2032.
- HVDC is the next wave: Upcoming tenders include Fatehpur-Bhadla (6,000 MW, already bidding), KPS-3 Khavda to South Olpad (2,500 MW, bidding very soon), Barmer-II to South Kallam (6,000 MW), Bikaner-V to Begunia (6,000 MW), and the India-Sri Lanka HVDC link. The Leh-Kaithal HVDC is already tendered and likely to be awarded by February-March 2025.
- Equipment ordering is largely locked: Barring HVDC projects, ~80% of the ₹3.30 lakh crore already under execution or bid out has equipment tied up, reducing supply-chain risk.
Capitalization & Capex: The Inflection Trade
- FY25 is a flat year: Both capex and capitalization are targeted at ~₹18,000 crore, with capex likely to exceed ₹20,000 crore (~₹4,000 crore RTM, >₹12,000 crore TBCB, ~₹1,000 crore others). H1 capex stood at ₹10,002 crore.
- FY26 steps up sharply: Capitalization is guided to ₹25,000-30,000 crore, with capex in the same range. This is when the current TBCB win streak begins converting to regulated or contracted revenue.
- FY27 is the breakout year: Capitalization is guided to ~₹40,000 crore, nearly double the FY25 run-rate, as large HVDC and RE-evacuation projects reach commissioning.
Tyagi: "This year, we are targeting about ₹18000 crore capex as well as for capitalization. But the next year, it will increase from ₹18000 crore, maybe somewhere between ₹25 to 30 thousand crore and next year, it will go about maybe ₹40,000 crore."
- Regulated equity base confirmed: Per the CFO, net worth stands at ~₹92,000 crore, with TBCB investments at ~₹4,000-4,200 crore, implying ~₹88,000-90,000 crore in regulated equity earning the 15% ROE.
Operational & Segment Performance
- Transmission reliability remains above incentive threshold: System availability at 99.80% (vs 99.75% threshold) and tripping at 0.17 per line in Q2, sustaining the operational track record that underpins incentive income.
- Commercial realization stayed strong: ~₹19,000 crore billed with realization above 100% at 100.31%.
- Telecom grew its customer base: Q2 income of ₹267 crore with 13 new customers added and 100% backbone availability.
- Consultancy held steady: 16 international assignments (3 new orders in Q2) and 77 domestic assignments (2 new orders in Q2), generating ₹134 crore in Q2 income.
- Smart meters are progressing slowly: 4 lakh meters supplied across two Gujarat circles, ~1 lakh installed so far, with installation still ramping.
EESL: The Unresolved Overhang
- The mechanics of the loss: EESL's annuity model requires upfront capex with monthly recovery. Receivables have mounted, forcing the JV into short-term borrowing to service interest. POWERGRID stopped putting in fresh equity over the last year. The ₹100 crore consolidated loss in H1 is POWERGRID's share of that drag.
- The fix is political, not operational: Management is taking the issue to the Ministry and expects it to be discussed at the Power Ministers' Conference on 12 November 2024. No commitment was given that losses will stop, and the analyst pushback on this point was deflected.
- Scale of the impact: The ₹100 crore loss contributed roughly 1.5 percentage points to the profit growth reduction, making it material but not dominant compared to the ₹300 crore O&M reset.
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| FY25 capex | ~₹18,000 crore, likely >₹20,000 crore | FY25 |
| FY26 capitalization | ₹25,000-30,000 crore | FY26 |
| FY27 capitalization | ~₹40,000 crore | FY27 |
| Leh-Kaithal HVDC award | Tender already out; OBD shortly | By Feb-Mar 2025 |
| KPS-3 HVDC bidding | Khavda-3 to South Olpad, 2,500 MW | "Very soon" |
| EESL resolution | Discussed at Power Ministers' Conference | 12 Nov 2024 |
| Total execution by 2032 | >₹3.35 lakh crore (₹1.43 lakh crore in hand + ~₹1.92 lakh crore expected wins) | By 2032 |
| Sustainability: 50% RE electricity | Committed target | By 2025 |
| Sustainability: net zero | Committed target | By 2047 |
Key Metrics
| Metric | Q2 FY25 |
|---|---|
| Consolidated total income | ₹11,846 cr, vs ₹11,530 cr last year |
| Standalone total income | ₹11,383 cr |
| Consolidated PAT | ₹3,793 cr, vs ₹3,781 cr last year |
| Standalone PAT | ₹3,711 cr |
| Transmission charges | ₹10,877 cr |
| Telecom income | ₹267 cr, 13 new customers added |
| Consultancy income | ₹134 cr, 3 international and 2 domestic orders received |
| CapEx (H1 FY25) | ₹10,002 cr up to September 2024 |
| Capitalization (H1 FY25) | ₹4,000 cr worth projects commissioned up to September 2024 |
| Transmission system availability | 99.80% till Q2 |
| Tripping per line | 0.17 in Q2 |
| Projects in hand | ₹1,43,295 cr, comprising RTM ₹8,896 cr, TBCB ~₹93,000 cr, metering/other ~₹3,300 cr, new RTM ₹38,008 cr |
| Gross fixed assets (consolidated) | ₹2,78,983 cr as of 30th Sep 2024 |
| Debt | ₹1,22,499 cr |
| Net worth | ₹92,061 cr |
| Debt/Equity ratio | 57:43 |
| EPS | ₹8.08 |
| Book value per share | ₹98.98 |
| Return on Net Worth | 8.17% |
| Billing realization | 100.31%, billed about ₹19,000 cr |
| TBCB projects won in Q2 | 8 out of 13 projects, 78% of annual tariff, 75% of NCT cost |
| TBCB projects won in Oct–Nov | 4 out of 6 projects |
| Smart meters installed | ~1 lakh meters, 4 lakh supplied out of 63 lakh planned in Gujarat |
| JV/associate loss (EESL) | ~₹100 cr accounted in H1 on consolidation |
| FY25 CapEx target | ~₹18,000 cr, likely to increase to more than ₹20,000 cr |
| FY26 CapEx outlook | ₹25,000 to ₹30,000 cr |
| FY26 capitalization outlook | ₹25,000 to ₹30,000 cr |
| FY27 capitalization outlook | ~₹40,000 cr |
| Cumulative CapEx/projects outlook by 2032 | At least ₹3 trillion worth projects or CapEx |