Key Takeaways
- Capex beat, guidance raised: FY26 capex crossed ₹35,000 crore, surpassing the already-revised ₹32,000 crore target, and FY27 is guided at ₹37,000 crore with a clear bias to overshoot.
- Capitalization inflection underway: Record capitalization of ₹22,749 crore (likely ₹25,000+ crore) sets the stage for ₹30,000 crore in FY27 and ₹35,000 crore in FY28, a combined ₹65,000 crore over two years that will drive the next leg of regulated asset base growth.
- The opportunity is structural and vast: Management sees ~₹15 lakh crore of transmission visibility through 2035, anchored by renewable integration, HVDC interconnections and the Brahmaputra Basin, with Power Grid positioned to capture a dominant share.
- Execution bottlenecks are being methodically dismantled: Right-of-way compensation, skilled manpower shortages and transformer supply constraints, the three historical drags on project delivery, each have dedicated mitigation programs now scaling up.
- What to watch next quarter: Whether the FY27 capex guidance gets a mid-year upgrade, the pace of capitalization conversion from the ₹65,000 crore two-year pipeline, and any tangible progress on international HVDC interconnections.
Capex Delivery & The Guidance Trajectory
- FY26 overshoot: Capex guidance was revised upward to ₹32,000 crore during the year; actual achievement exceeded ₹35,000 crore, continuing a pattern of outperformance against stated targets.
- FY27 commitment: ₹37,000 crore is the figure committed to the Government of India, but management flagged it will "definitely" be higher and may formally revise guidance after six months depending on ground progress.
- FY28 step-up: ₹45,000 crore is the current target, implying a ~22% jump from the FY27 base, consistent with the project pipeline entering execution phase.
- The beat habit: Management noted it "normally surpasses" its capex targets, framing the guidance as a floor rather than a ceiling, though no quantified upside was provided.
Tyagi: "Whatever we have committed, we have already achieved that, and we are going to achieve better than what we committed."
Capitalization: The Earnings Engine Firing
- Record year: Capitalization reached ₹22,749 crore in FY26, exceeding the ₹22,000 crore target, and is expected to touch ₹25,000+ crore once the Navsari-Phadge line was commissioned in the final days of March.
- Two-year runway: FY27 capitalization is guided at ₹30,000 crore and FY28 at ₹35,000 crore, a combined ₹65,000 crore that will flow into the regulated asset base and underpin revenue growth.
- Physical progress backing the numbers: 4,239 circuit kilometers of transmission lines and 52,555 MVA of transformation capacity were commissioned, with that figure set to cross 62,000 MVA. Eight substations were added and a ninth, Bikaner III, was likely commissioned. Key lines included Bhadla III-Sikar II, Khetri-Narela and Navsari-Ahmedabad.
- Asset base milestone: Gross Fixed Assets crossed ₹3,00,000 crore, growing at a ~10% CAGR over five years, reflecting sustained capital deployment converting into productive assets.
The Transmission Opportunity Through 2035
- Total visibility ~₹15 lakh crore: The Central Electricity Authority and Ministry of Power estimate a ₹7.9 lakh crore transmission opportunity through 2035. Management layers on another ₹3-4 lakh crore from international HVDC interconnections (Sri Lanka, UAE, Saudi Arabia, Oman, Singapore, Maldives, Myanmar) and ~₹4 lakh crore from Brahmaputra Basin HVDC projects.
- Power Grid's addressable slice: Even at a 50-60% share, management estimates ~₹6 lakh crore of projects to execute by 2035, translating to roughly ₹60,000 crore per year, a run-rate well above current capex levels.
- Policy anchor: The "One Sun, One World, One Grid" concept, championed by the Prime Minister, provides a long-term framework that positions Power Grid as the natural vehicle for cross-border transmission infrastructure.
Tyagi: "So total, the visibility for transmission project is will be somewhere Rs. 15 lakh crore, investment in transmission system... So, POWERGRID is going to play very, very important role because it involves also One Sun, One World, One Grid concept, given by our honorable prime minister."
Execution: Unblocking the Three Bottlenecks
- Right-of-way resolved: Revised compensation guidelines now pay 30% of market rate in rural areas, 45% in semi-urban and 60% in urban/metro, a significant sweetener. A dedicated RoW cell operates in each region with a corporate-level team for escalation.
- Skilled manpower pipeline: Five skill development centers are operational, with two more planned, collectively training 1,400-1,500 technicians and fitters per year to address the shortage that had slowed project execution.
- Equipment supply easing: Transformer and reactor manufacturers are augmenting capacity by over 4 lakh MVA per year, alleviating a constraint that had created procurement delays.
- Reliability as proof: System availability stood at 99.84% with trippings per line at just 0.25, meaning one line trips every four years on average. This is enabled by digital and predictive maintenance, AI-based defect detection, drone-based patrolling and advanced condition monitoring.
Tyagi: "So, we don't see any execution challenge in next 2 years or 3 years."
Corporate Restructuring & Shareholder Returns
- SPV consolidation advancing: Ministry of Corporate Affairs approval has been received for merging 19 SPVs into 2 SPVs. The Board has separately approved merging 28 wholly owned subsidiaries into 2 wholly owned subsidiaries, a proposal now with the Ministry of Power. The restructuring aims to simplify the corporate structure.
- Market value creation: Market capitalization grew 2.5 times from FY21 to FY26, with share price appreciation of 2.5 times over the same period. Dividend yield has run at 3-4%, and cumulative dividends paid exceed ₹50,000 crore over the last five years.
- Institutional backing: 45% of ownership sits with institutional investors including Capital Group, BlackRock, Schroders, Vanguard, GIC, LIC, UTI and SBI Mutual Fund.
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| FY27 Capex | ₹37,000 crore (committed floor); "definitely going to be more" | FY27; possible mid-year revision after 6 months |
| FY28 Capex | ₹45,000 crore | FY28 |
| FY27 Capitalization | ₹30,000 crore | FY27 |
| FY28 Capitalization | ₹35,000 crore | FY28 |
| Two-year capitalization | ~₹65,000 crore cumulative | FY27-FY28 |
| SPV merger | 28 wholly owned subsidiaries into 2 wholly owned subsidiaries | Pending Ministry of Power approval |
Key Metrics
| Metric | Q4 FY26 |
|---|---|
| Capex | ₹35,000+ crore, achieved; revised up from ₹32,000 crore guidance |
| Capitalization | ₹25,000+ crore, expected for FY26; ₹22,749 crore achieved as of call date |
| FY27 Capex guidance | ₹45,000 crore, up from ₹37,000 crore committed to Government of India |
| FY27 Capitalization guidance | ₹30,000 crore |
| FY28 Capitalization guidance | ₹35,000 crore |
| Works in hand | ₹1,48,000 crore, including CWIP of more than ₹49,000 crore |
| Transmission line commissioned (FY26) | 4,239 circuit km |
| Transformation capacity added (FY26) | 52,555 MVA so far, expected to surpass 62,000 MVA by month-end |
| Substations commissioned (FY26) | 8 substations, 9th (Bikaner III) likely by month-end |
| Gross Fixed Assets | More than ₹3,00,000 crore |
| Transmission system availability | 99.84% in FY26 |
| Trippings per line | 0.25, one line trips every 4 years on average |
| Market capitalization (Feb 2026) | ₹2,77,000 crore, up 2.5x from FY21 |
| Dividends paid (FY21–FY26) | More than ₹50,000 crore |
| Institutional ownership | 45% of investment |