Key Takeaways
- Order book crosses ₹7,000 crores: The Mumbai HVDC booking pushed backlog past this milestone, providing revenue visibility of more than 20 months.
- Exports hit the 25% target early: The three-pronged export strategy delivered the targeted corridor more than a year ahead of schedule; management now prioritizes stabilization before the next jump.
- Supply chain pain is easing but not gone: Mitigation actions softened the semiconductor shortage impact versus last quarter, yet normalization is expected to take at least a couple more quarters.
- Midterm margin commitment reaffirmed: Management remains committed to reaching a 10% EBITDA margin by 2025, calling it the sustainable level going forward.
- What to watch next quarter: Whether the supply chain normalizes on the stated timeline, the pace of services revenue build toward the 10–12% of orders target, and any quantification of the Adani HVDC revenue ramp as execution moves past the engineering phase.
Order Book & Demand Drivers
- Backlog milestone: Order backlog crossed ₹7,000 crores with the large Mumbai HVDC booking, giving revenue visibility of more than 20 months.
- Renewable energy wins: NTPC Renewable Energy Limited order for power transformers at a 4.75 GW renewable energy park in Gujarat, the single largest rating transformer for solar power evacuation in the country so far.
- Rail segment momentum: Orders from BLW and BNC Power, plus a pipeline of upcoming opportunities: 2x25 kV electrification of high-density corridors and 8–10 metro projects expected to be awarded in the current fiscal year.
- Industrial and data center orders: Wins in mining, aluminum smelter, steel, and data centers; Hitachi Energy claims very high market share in data centers, a segment expected to add 45 data centers with over 1,000 MW of IT capacity over the next three years.
- First-of-its-kind product order: First order globally for a 100 MVA Scott Transformer, with the Vadodara engineering team driving design to manufacturing and commissioning.
- Sector mix shift: Orders were heavier on products from end-users, evenly split between utilities and transport, with transport and infrastructure stronger this quarter.
- HVDC outlook accelerating: Management anticipates HVDC connections for utility-scale solar generators at Badla, Leh, Kargil over the next 8–10 years; the project cadence has shifted from one every five years to one per year or per one-and-a-half to two years.
- Renewables driving T&D investment up, not down: Renewables require more T&D spend than thermal because of their intermittent and decentralized nature, increasing demand for grid resilience, power quality, and automation equipment.
Management: "In my view, it's thermal to renewable it's not about going down on the T&D expenditure, well rather it should increase more, make the grid more resilient, enable the grids to penetrate more and more renewables going forward."
Exports
- 25% target achieved ahead of schedule: The target set in early 2021 for reaching 25% of total orders by 2023 was met more than a year early, through a three-pronged strategy: global feeder factories for India-only products, allocated markets with dedicated sales resources, and component supply to Hitachi Energy factories worldwide.
- Established markets performing: Orders came from Nepal, Bhutan, the Middle East, and the Americas.
- Stabilization before the next jump: Management wants to stabilize at the achieved 25% level before taking the next increase; new factories would enable further export exposure, but stabilization is the immediate priority.
N. Venu: "In the beginning of the 2021 we have set ourselves a target of reaching 25 percent of the total order by 2023. And we are happy to tell you that we have reached to target much ahead of our own ambition."
Supply Chain & Margin
- Semiconductor shortage easing but persistent: Mitigation actions softened the impact compared to last quarter: focusing on product lines less dependent on semiconductors, stock-sharing with global Hitachi Energy factories, giving early forecasts to suppliers, and placing early orders. Normalization is expected to take at least a couple more quarters.
- Commodity and freight headwinds: Commodity and freight price increases, plus foreign exchange volatility, continue to reflect in short-term performance.
- Midterm margin commitment intact: Management remains committed to reaching 10% EBITDA margin by 2025, calling it the sustainable margin going forward.
- Transformer supply-demand tightness: Management expects supply-demand challenges similar to those in North America to continue in other countries including India, despite robust transformer capacity; customers are being engaged to plan early.
N. Venu: "So, when it comes to normalizing the supply chain in our view it will take at least couple of more quarters."
Services
- Current services revenue: Approximately 10% to 15% of revenues, or ₹400–₹500 crores.
- Immediate order target: Reach 10% to 12% of orders from services.
- Long-term potential: ₹2,000 crores annual potential based on installed base calculation, but it will take a couple more years to reach; no specific timeline given.
- Service order mix: Healthy mix of base orders for retrofit and spares and utilities, including breakthrough orders for GIS bay extension and substation automation systems.
Execution & Projects
- Adani HVDC underway: Execution has commenced, starting with engineering and load flow/system study analysis; revenues are expected to pick up after three to four quarters, with a project timeline of close to 36 months. Management declined to disclose project-level revenues or margins.
- Revenue growth: Revenue up 31% YoY, driven by consistent execution focus, close customer connect, and mitigation efforts tempering the impact of tight supply chains.
- Half-year order surge: First half FY23 order growth was more than 150% versus the first half of the previous year.
- TSA with ABB winding down: Payments to ABB under the Technical Service Agreement for IS infrastructure support are gradually declining; dependence is expected to come down within the next six months or so, by 2023. Management declined to quantify the percentage of revenue going under the TSA.
Capacity & New Initiatives
- New manufacturing capacity: Greenfield facility for high-voltage power quality products inaugurated in Karnataka, doubling existing production capacity of advanced capacitors units and banks.
- Technology localization: Initiated manufacturing of next-generation switchgear operating mechanisms; expanded dry bushing for transformers, bringing 768 kV bushing technology to India for the first time.
- CAPEX run rate: Anticipated annualised CAPEX of around ₹100 crores to continue delivering to the evolving energy landscape.
- e-mobility pilot: Running a Grid-eMotion pilot at IIT Madras with reputed bus manufacturers, focusing on localizing and indigenizing the technology to make it affordable in India.
- EconiQ portfolio: Already announced the EconiQ portfolio as a more sustainable alternative to SF6 gas.
- Sustainability milestones: Operational carbon footprint reduced by 40% versus the same period last year; reached 100% fossil-fuel-free in operations in December 2021; targeting carbon neutral in own operations by 2030 with a 60% CO2 reduction within FY23.
- Hitachi acquisition of remaining ABB shares: Announced ahead of schedule, supporting Hitachi Energy's 2030 plan and expected to accelerate synergies in R&D, IT transformation, shared services, and synergy businesses like rail and smart grids.
N. Venu: "This is the first for Hitachi Energy globally, and I am proud to share that from the product design to product engineering, our engineering team in Vadodara will be driving this project from design to manufacturing and commissioning."
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| EBITDA margin | Reach 10% EBITDA margin, described as the sustainable level going forward | By 2025 |
| Supply chain normalization | Supply chain to normalize | At least a couple more quarters |
| TSA payments to ABB | Dependence on ABB IS infrastructure services to come down | Next six months or so (2023) |
| Services order share | Reach 10% to 12% of orders from services | No date given |
| CAPEX run rate | Annualised CAPEX of around ₹100 crores | Ongoing |
| Carbon reduction | 60% reduction in CO2 emissions | Within FY23 |
| Carbon neutral operations | Carbon neutral in own operations | By 2030 |
| Export share | Stabilize at achieved 25% level before next increase | No date given |
Key Metrics
| Metric | Q2 FY23 |
|---|---|
| Revenue | ₹1,815 cr, up 31% YoY |
| Profit before tax | ₹50.2 cr |
| Profit after tax | ₹37.2 cr, up 8.3% YoY |
| Orders received | ₹1,278 cr, up 30.6% YoY |
| Order backlog | crossed ₹7,000 cr, revenue visibility of more than 20 months |
| H1 FY23 order growth | more than 150% vs H1 previous year |
| EBITDA margin midterm target | 10% by 2025 |
| Exports as share of order book | ~25%, achieved 25% target ahead of schedule by more than one year |
| Services share of orders | 10% to 15% currently; immediate target 10% to 12% |
| Annual potential market for services | ₹2,000 cr, based on installed base |
| Portfolio locally manufactured in India | more than 80% |
| CO2 emissions reduction | 40% reduction in operational carbon footprint vs same period last year; target 60% reduction within FY23 |
| Annualised CAPEX run rate | ~₹100 cr for facility upgrades and greenfield investments |
| Royalty payout to group company | approx. 3.5% of revenue |
| Employees (Hitachi Energy India Ltd) | 2,500 |