Key Takeaways
- Strong quarter, multi-year thesis intact: Revenue grew 29.6% YoY and PBT before exceptionals rose 118% YoY, driven by broad-based execution across renewables, industries, and data centers.
- Base orders signal durable demand: Ex-HVDC order inflow grew 73% YoY, confirming that the energy transition pipeline extends well beyond lumpy mega-projects.
- Export strategy is accelerating structurally: A three-pronged export model is scaling, with management guiding exports to 25–30% of revenue (ex-large HVDC) and actively evaluating how to serve European demand from Indian factories amid tariff shifts.
- Margins absorbed a one-time labor hit: An exceptional charge of ₹54.2 crores from the new labor code masked underlying PBT margin expansion to 18.5%; gross margin dipped QoQ on product mix alone.
- What to watch next quarter: Whether the CAPEX spend spikes as guided, the commissioning of the Mumbai HVDC project, and any tangible progress on the export reallocation toward Europe.
Demand & Order Book
- Base orders broad-based: Strong inflows from renewables (wind and solar), data centers, and industries drove the 73% YoY ex-HVDC growth; utilities and industries segments are nearly equal at 47% and 43% of the mix respectively.
- Transmission and rail timing effects: YoY order decline in transmission and rail and metro reflects project timing and a tough prior-year base from large orders, not structural weakness; management expects rail to improve in coming quarters as part of the normal market cycle.
- Data center urgency is real: Global AI data center demand requires infrastructure built on an emergency footing, with load swings of 100 MW to 250 MW in seconds; Indian data centers are at an earlier stage but the company has the competency to connect them directly to HVDC through renewable sources.
- HVDC pipeline building: Large LCC projects, including the Barmer 6,000 MW project now out for bidding, could mature over the next 12 to 18 months; the company has pre-built capacity and evaluates each order on risk-reward and customer exposure.
Venu: "the demand is so huge and the need at yesterday's basis. That is the urgency of building up those kind of infrastructure. And that needs not only the equipment, but AI-ready data centers and variation in the load from 100 MW to 250 MW in seconds, not even minutes, seconds."
Execution & Project Delivery
- Revenue execution broad-based: Growth came from 765 kV reactors, ICTs for solar and wind substations in Gujarat and Karnataka, 130 kV GIS, 400 kV CRP, and substation automation systems.
- Notable project completions: A compact mobile 400 kV substation was deployed rapidly in Kutch, Gujarat; a 220 kV GIS substation was delivered for a data center in Pune; a 220 kV/33 kV substation was built for a 300 MW solar project in Koppal, Karnataka.
- Mumbai HVDC near commissioning: Pre-commissioning tests are complete and the project will be commissioned in two to three weeks; no delay is attributable to the company and no LD or penalty hits are expected.
- HVDC revenue continuity assured: Despite the Adani HVDC order reaching completion, the two existing HVDC projects remain in manufacturing and simulation stages with revenue recognized on a percentage-of-completion basis, so no slowdown is expected.
Venu: "we have just completed our pre-commissioning test... in just another two to three weeks, we will commission the project."
Margins & Cost Structure
- PBT margin expanded sharply: PBT before exceptional items rose to 18.5%, up 118% YoY, driven by higher revenues, product mix, operational efficiency, and export momentum.
- Gross margin dipped on mix, not distress: Gross margin fell to approximately 39.5% QoQ, attributed solely to product mix changes depending on which products were executed in the quarter; management did not link it to any specific project contribution.
- Other expenses structurally lower: Other expenses have declined despite revenue growth due to operational leverage and the completed migration off ABB IT systems; the company now runs on Hitachi Energy Operating System with SAP4 HANA and no longer pays ABB royalties.
- Price escalation protects the book: More than 70% of the portfolio carries built-in price escalation formulas; only a small portion of orders with immediate turnaround may lack coverage.
- Labor code impact one-time: The ₹54.2 crores exceptional charge, approximately 2.5% of revenue, reflects implementation of the new labor code and is not expected to recur at this scale.
Export Strategy & Global Positioning
- Three-pronged export model scaling: Global feeder factories manufacture products sold worldwide; allocated markets are being reviewed and expanded with local sales organizations; component manufacturing for bigger products is supplied to the company's own factories globally. This is accelerating.
- Exports to reach 25–30% of revenue: Management guided that exports, excluding large HVDC projects, will settle in the 25–30% range going forward.
- Currency advantage used tactically: The weaker rupee provides short-term export competitiveness and the company is reaching out to global group companies for procurement from India, but management is explicit that it is building a sustainable strategy, not one around a temporary phenomenon.
- EU tariff opportunity under evaluation: The company will evaluate using Indian factories to benefit European group companies facing tariff expenses; which products to supply from India to Europe is still being assessed.
- Chinese imports not a threat if rules enforced: Management has seen news about Chinese transformer imports but no government clarification; it understands that imports from neighboring or border countries may not be permitted without local manufacturing, and sees no major threat as long as a level playing field exists. Expansion projects are not being held back.
Venu: "we don't want to create a strategy around a temporary phenomenon. If it remains like that, probably we will definitely do that but on a short-term basis, yes, we are reaching out to some of our global companies wherever they need, so they can procure from us it will be competitiveness for us."
Capacity Expansion & Investment
- CAPEX plan intact despite slow start: Only ₹155 crores of the planned ₹700+ crores was incurred in the quarter due to product cycle demands requiring a sequential approach, but the pipeline is in place for a pickup in coming quarters, possibly with a large spike next quarter.
- Multi-year CAPEX visibility: The company plans ₹700+ crores this year and an additional ₹700+ crores next year, with flexibility to move a few hundred crores either way.
- New facilities breaking ground: A ground-breaking ceremony was held for a high-voltage product facility in Savli, Gujarat, and expansion of the traction transformer facility has already begun.
- Global capacity tight: Management assesses that even considering existing capacities plus announced expansions, a gap remains to be closed; the energy transition is a multi-year growth story requiring further capacity addition.
Venu: "Considering the existing capacities plus capacities to come, we believe that still there is a gap to close on... the energy transition story in our view, purely in my view is a multi-year growth story."
Strategic Initiatives
- Service business formalized: A separate global Business Unit for Service has been created, including in India; services help maintain continuity in energy ecosystems, and new-age customers such as data centers are seeking life-cycle partnerships. Results are expected to build over time.
- Digital and edge-of-grid push: The strategic center of gravity is shifting to include more exports, service, and digital, while expanding at the edge of the grid into e-mobility, energy storage, and data centers.
- Academia and customer engagement: The partnership with NIT Warangal was extended for another five years; the Energy and Digital World initiative expanded to Tier-2 cities with an event in Guwahati attended by approximately 150 industry leaders.
- ESG milestones advancing: The company operates on 100% renewable electricity, is on track for a 70% CO2 reduction versus the 2019 baseline ahead of its 2025–2026 targets, reduced landfill disposal approximately 30% versus FY25, and recycles over 95% of general waste. CRISIL ESG rating improved to 61 (Strong).
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| CAPEX spend | ₹700+ crores this year, additional ₹700+ crores next year; pickup expected with possible spike | Next quarter and FY27 |
| Export revenue share | 25–30% of revenues, excluding large HVDC projects | Going forward |
| Other expenses corridor | Remain within 15–19% of revenue | Ongoing |
| Mumbai HVDC commissioning | Project to be commissioned | 2–3 weeks |
| Revenue growth continuity | No slowdown expected despite HVDC project phasing | Ongoing |
| HVDC pipeline maturity | Large LCC projects (e.g., Barmer 6,000 MW) could mature | Next 12–18 months |
Key Metrics
| Metric | Q3 FY26 |
|---|---|
| Revenue | ₹2,168 cr, +29.6% YoY and +13.2% QoQ |
| Operational EBITDA margin | 15.6%, vs 10.1% YoY and 15.2% QoQ |
| PBT before exceptional items | ₹402 cr, +118.4% YoY; margin 18.5% vs 11% YoY |
| PBT after exceptional items | ₹347.8 cr, margin 16% vs 11% YoY; includes ₹54.2 cr labor code impact |
| PAT | ₹261 cr, margin 12.1% vs 8.2% YoY |
| Order inflow | ₹2,477.6 cr, -78% YoY reported; +73% YoY ex-HVDC; +11.7% QoQ |
| Order backlog | ₹29,872 cr, all-time high |
| Material cost as % of revenue | 58%, vs 59% QoQ and 55% YoY |
| Other expenses as % of revenue | 14%, within the 15%–19% corridor management cited |
| Other income | ₹61 cr, from QIP deposits interest |
| Commodity exchange gain | ₹24 cr |
| Export share | 29%–30% of current bidding; target 25%–30% of revenues going forward ex-large HVDC |
| Data center contribution to orders | High single digit percentage |
| Total recordable injury frequency rate | 0.09, improved from 0.19 target and down from previous year |
| CAPEX incurred from QIP proceeds | ₹155 cr vs ₹700+ cr envisaged for FY26 |