Key Takeaways
- Strong quarter, lumpy by nature: Revenue rose 27.2% YoY and operational EBITDA reached 10.2%, but management cautions that quarterly comparisons are volatile given the late and long-cycle business.
- Data center orders exploded 700% YoY, driven by 5G rollout, data localization rules and supportive policies, and the company sees this trend continuing.
- The domestic transmission opportunity is enormous: India needs to complete ordering for its 500 GW renewable target in the next two to three years, with at least 40% of a ₹2.44 lakh crore market addressable by Hitachi.
- Margins are recovering but still rebuilding: Full-year EBITDA margin improved 100 bps to 6.7%, and the company is directionally targeting a higher level on a mid-term basis, helped by an easing semiconductor supply chain.
- What to watch next quarter: The pace of transformer capacity expansion announcements, HVDC and STATCOM tender outcomes, and whether the data center order momentum sustains at anything close to the 700% growth rate.
The Domestic Energy Transition Opportunity
- Renewables build-out is accelerating: The National Energy Policy targets scaling renewables from 191 GW to 648 GW between FY25-32, a 24% CAGR that requires the country to do three to four times what it has been doing.
- Transmission investment locked in: Close to ₹2.4 lakh crore is expected for renewable-related transmission by March 2027, with inter-regional transmission capacity reaching 143,000+ MW and HVDC circuits growing to ~23,000 circuit km carrying 12,000 MW.
- STATCOM pipeline is large but the number is unverified: More than 30 STATCOM projects are lined up with a stated total outlay of over ₹1.1 lakh crore by 2027, though management acknowledged a query on that figure and said they would cross-check it.
- Ordering window is finite: To hit the 500 GW renewable target by 2030, the government needs to complete ordering in the next two to three years, with some possible spillover into a fourth year; at least 40% of the ₹2.44 lakh crore market is addressable by Hitachi.
- Industry CAPEX revival adds another layer: A revival of private CAPEX is likely to create opportunities of over ₹4,000 crores in the market for FY24-25, backed by PLI schemes, electrification, digitalization, energy networks and semiconductors.
N. Venu: "So, this is what we have been saying to reach that kind of levels. So, we need to do more than three to four times what we have been doing it, as a country as a whole or industry as a whole."
Order Book & Segment Performance
- Data center orders grew over 700% YoY in Q4, driven by 5G, data localization regulation and data center policies; management sees the trend continuing given the sheer potential of the market.
- Industries grew 42% YoY backed by PLI schemes, electrification, digitalization, energy networks and semiconductors.
- Transmission and railways declined 32% and 29% respectively, attributed to the timing effect of orders rather than any structural slowdown.
- Service and export orders each rose 43% YoY: Service was driven by annual maintenance contracts, upgrades and remote monitoring solutions like RelCare and RelScan; export orders were led by transformers and key products for the Middle East, Southeast Asia and neighboring South Asian countries.
- Key wins span the portfolio: Orders included 765 kV ICT and reactors from tariff-based competitive bidding, a dry-type transformer for a semiconductor plant, three-phase locomotive transformers for rail manufacturers, and 12 units of 33 kV CVD plus 10 units of 33 kV UT for Jamnagar.
- Exports will stay range-bound: Exports as a percentage of total orders or revenues are expected to remain between 25% and 50% going forward, as the primary focus is serving strong domestic demand while remaining open to opportunities outside.
N. Venu: "We are looking at it actually, because we also see a very strong demand in the domestic market. So, our main purpose is also to serve the domestic market, right? While serving the domestic market, we're also very open to looking at opportunities outside of it."
HVDC & the Adani Project
- HVDC manufacturing is now fully localized: The company has set up its own factory for HVDC valves, complete manufacturing for converter transformers, and complete manufacturing for capacitors; domestic component content exceeds 50-60%, and when engineering capabilities are added, indigenously developed content is far higher.
- The Adani Mumbai HVDC project is under execution: A very low percentage of revenues have been recognized so far, and execution will continue into next year, with completion scheduled between FY25 and FY26 per the original timeline.
- A milestone was achieved in Q4: The HVDC team successfully completed HVDC-Dielectric for the Adani project, manufactured entirely at the newly inaugurated Chennai factory.
- The company can handle multiple HVDC projects simultaneously: Management stated it has the appetite to take two or three HVDC projects at the same time, and tenders have already come for bidding.
- Bidding strategy is multi-channel and independent: The company has not tied up with any EPC player and will give offers transparently and openly to all customers bidding; this is a deliberate multi-channel strategy.
- Export HVDC opportunities require collaboration: Direct export orders for HVDC are not straightforward given the technology intensity; they require co-creation and working within the group and outside, including prior system studies and network behavior understanding.
N. Venu: "The energy transition challenge is huge. It needs a lot of collaboration, co-creation, working not only within company, within group, but also outside of the group, right? The challenge is so big."
Margins & Cost Structure
- Operational EBITDA reached 10.2% in Q4, up from 6.7% on a full-year basis, which itself was a 100 bps improvement YoY; the recovery was driven by a favorable revenue mix, better product mix and mitigation of external supply chain challenges.
- Cost structure is stabilizing within a defined band: Material cost was 67.4% of revenue, personnel expenses 8.3%, and other expenses including depreciation and interest hovered around 22%; management expects to remain within this basket in coming quarters.
- Gross margin has stabilized after headwinds: The semiconductor supply chain has eased out, and the company is now able to get chips and project well; gross margin should be fairly consistent going forward, depending on product mix.
- Personnel expenses are expected to stay at 9-10% and total other expenses at 22-23%, though volume-related expenses may see changes within that band.
- Quarterly lumpiness is inherent: Management stresses that the business is late and long cycle, so quarterly comparisons can be misleading; the margin trajectory is best judged on a medium-term to long-term view.
N. Venu: "Even though we like to compare a quarter-on-quarter but depending upon our lumpy revenues, the whole thing can be started in that. So, we always look at it in a medium term to long term view which is fairly one-year comparison."
Capacity Expansion & Manufacturing
- Manufacturing utilization is healthy: Some product lines are running much higher than 70% utilization, while others have room to take on more; overall utilization across 19 factories is good.
- Transformer capacity is being expanded: A couple of expansions have already been completed in the last two to three years, and the company is actively looking at further expansion, though exact details are still being firmed up and may be disclosed in a couple of months or quarters.
- Power quality factory has ramped significantly: The STATCOM power quality factory in Bangalore was expanded from 10,000 MVAR to 20,000 MVAR, and the company is now looking at taking it to 30,000 MVAR.
- New factories have been added: Recent additions include an expanded HVDC factory, global technology services, a new RIT bushing factory, and the STATCOM power quality factory.
- The strategy is to ramp ahead of the curve: The company continuously adds new product lines, brings in new technology and localizes it, positioning capacity ahead of demand rather than chasing it.
N. Venu: "As I said, we have been continuously ramping up ahead of the curve, right, adding a new product line, bringing the new technology, localizing the technology."
Railways, Exports & Other Segments
- Railway electrification is a medium-term opportunity: Railways have a large target to completely electrify remaining lines, and Hitachi has supplied the first Scott transformer to successfully complete the entire type test, working with an EPC company for the Western Railway Line.
- Scott transformer competition is emerging: Management expects at least three or four competitors to enter the Scott transformer space going forward, though it declined to name them.
- Export orders are geographically concentrated: The bulk of export orders came from the Middle East, Southeast Asia and neighboring South Asian countries; key orders included relays from Sweden, transmission projects from Switzerland and Mexico, and a 400 kV GIS module and 420 kV GIS for CFE.
- Data center is a key high-growth segment: The company is working with data center developers, though it declined to disclose the segment's specific contribution to the quarter.
- An ERP migration was completed: The company migrated to SAP S/4HANA (internal name REIWA), a single SAP instance for the entire Hitachi Energy Group; post-stabilization, it is expected to improve operational processes, visibility, and line items like inventories and networking capital.
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Solar rooftop completion | 600-kW solar rooftop at Doddaballapur factory to power 40% of energy needs | May 2024 |
| Adani HVDC project completion | Project portion to be completed per original schedule | Between FY25 and FY26 |
| Transmission ordering window | Government needs to complete ordering for 500 GW renewable target; at least 40% of ₹2.44 lakh crore market addressable | Next 2-3 years, possible spillover to 4th year |
| EBITDA margin direction | Endeavor to improve EBITDA margin directionally at a higher level on a mid-term basis | Mid-term (no specific quarter) |
| Export revenue range | Exports as percentage of total orders/revenues to remain range-bound | 25% to 50% going forward |
| Transformer capacity expansion disclosure | Actively looking at further expansion; details being firmed up | Possibly in a couple of months or quarters |
| STATCOM budget figure verification | Management to cross-check the ₹1.1 lakh crore figure for 30 STATCOM devices | No timeline given |
Key Metrics
| Metric | Q4 FY24 |
|---|---|
| Revenue | ₹1,699.2 cr, up 27.2% YoY and 33.1% QoQ |
| Operational EBITDA | 10.2%, ₹172.6 cr; up 77% YoY and 113% QoQ |
| Profit before tax | ₹152.2 cr, up 133.8% YoY and 350.5% QoQ |
| Profit after tax | ₹113.7 cr, up 123.7% YoY and 394.8% QoQ |
| Material cost | 67.4% of revenue |
| Personnel expenses | 8.3% of revenue |
| Exchange gain | ₹9.8 cr |
| Order intake | ₹1,406 cr, up 11.5% YoY and 13.9% QoQ |
| Order backlog | ₹7,229 cr, revenue visibility for approximately 20 months |
| Data center orders growth | Over 700% YoY |
| Industries orders growth | 42% YoY |
| Service orders growth | 43% YoY |
| Export orders growth | 43% YoY |
| Full-year FY24 operational EBITDA margin | 6.7%, improved 100 bps YoY |
| Export orders as percentage of total orders (FY23) | Close to 30%, slightly below 30% |