Key Takeaways
- FY23 revenue grew 22% YoY, but Q4 exposed fragility: Consolidated revenue hit INR 1,113 crores for the full year, yet Q4 dipped 3.8% QoQ as EMOSS suffered severe European component shortages, a shock management is still working to absorb.
- The camshaft core is not static: Machined camshaft volumes rose 13% YoY, and new business awards from Indian and overseas customers will enter production over the next 1–1.5 years, supporting a view that engines launching in FY24–FY25 will run for another five to seven years.
- Diversification is real but deliberately opaque: MFT landed its first non-automotive machining win, a dedicated team is hunting powertrain-agnostic components, and non-camshaft businesses are ramping toward peak capacity in 1–1.5 years, though management refuses to disclose their current revenue contribution, calling it immaterial.
- The EV story is a localization bet with a moving timeline: An India-specific electric LCV powertrain, engineered by EMOSS with near-100% local sourcing, awaits supplier recertification after a regulatory change; management hopes to see vehicles on the road within three months but the timeline has already slipped.
- What to watch next quarter: Whether EMOSS recovers the Q4 supply-chain-driven revenue shortfall, whether the captive 15 MW power plant commissions on July 1 and begins lifting margins toward the 20%–22% target, and whether the first retrofitted EVs actually hit Indian roads.
EMOSS: The Quarter’s Drag and the Multi-Year Bet
- Q4 dip was supply-side, not demand-driven: EMOSS total income fell sharply QoQ from INR 80 cr to INR 52.4 cr because severe component shortages in Europe choked production; the in-house business model is vulnerable to supply shocks in a way the high-volume camshaft operations are not.
- Order book provides visibility: Management describes the EMOSS order book for the next two to three years as solid, with OEM partnerships active across the Netherlands, Germany, Scandinavia, the UK and New Zealand, and build-out underway for 2025 and beyond.
- Capacity is not the bottleneck: Adding capacity requires only more plant space and people, not long-lead-time machinery; a second plant was added in 2021, enabling the scale-up from 2019 levels.
- The India EV play runs through EMOSS technology: Software for EV development is built by the EMOSS team and deployed directly, giving what management calls a significant advantage; component selection and powertrain engineering are adapted for Indian weather, roads and regulations, not simply imported from Europe.
- Target market is large but penetration is the question: The N1 category in India is roughly 0.2-0.25 crore vehicles; even a very small percentage converted to electric would mean significant volumes, though no conversion assumption is offered.
- Predictability gap: Auto component revenues are "more or less predictable" for this year and next, but EMOSS in-house business is harder to forecast because it is not high-volume and remains exposed to supply-side shocks.
Karan Shah: "The specific dip in revenues in Q4 and the financials were mainly due to severe shortages of component supplies in Europe due to the ongoing crisis. The Company has started to recover from the supply chain shock and will strive to recover this shortfall in revenue in the coming quarters. But suffice to say, the order book for the next two to three years looks solid."
Camshaft Core: Still Growing, Still Defending Its Longevity
- Volume growth in higher value-add: Camshaft castings rose from 0.51 cr to 0.58 cr units and machined camshafts from 0.28 cr to 0.32 cr units YoY, delivering 13% growth in the machined segment where value capture is greater.
- New awards extend the runway: New camshaft business from various Indian and overseas customers over the last 12–18 months will enter production in the next 1–1.5 years; engines going into production in FY24–FY25 are expected to last at least another five to seven years, and management sees increased camshaft requirements from both markets.
- The IC-engine narrative is not one of immediate decline: The fact that new engine programs are still launching in the 2024–2025 window, with camshaft content attached, is presented as evidence that the transition will be gradual rather than abrupt.
Karan Shah: "The fact that we have been awarded these businesses means that they will go into production in the next one year or so... But that also tells us on the positive side that if engines are going into production in '24-'25, that they will last for at least another five to seven years from there."
Diversification Beyond the Camshaft
- MFT’s first non-automotive win: MFT has been awarded machining of aluminium components for a global manufacturer, a non-powertrain, non-automotive breakthrough that expands the subsidiary’s addressable market.
- New team, new mandate: A dedicated team at PCL is tasked with diversifying the product portfolio and customer footprint to ensure future readiness beyond IC engine dependence; the company has started development, validation and supplies of new components and materials for powertrain-agnostic customers.
- Non-camshaft ramp-up underway but undisclosed: These businesses are in ramp-up phase and expected to reach peak utilization or peak capacity in the next 1–1.5 years, but management declined to disclose their current percentage of standalone turnover, stating the contribution is not yet material.
- Aluminium component breaking for global customers is also in progress, alongside the MFT non-automotive machining work, broadening the non-ferrous and non-camshaft footprint.
Karan Shah: "At this point of time, I can't give you a percentage because the businesses are just about starting. And these are in ramp-up phase. So they would be at peak utilization or peak capacity in the next one year to 1.5 years. So I think it would be more reasonable to give you that number when the peak volumes are achieved and not at this point of time."
EV Strategy: Localize, Retrofit, and Wait on Regulation
- India-specific powertrain, not a European transplant: The same powertrain that works in Europe cannot work in India due to different weather, road conditions and regulations; EMOSS has reengineered the system and sourced components locally to make it cost-effective, with localization described as "almost" or "very close to" 100%.
- First plant for EV retrofitment: A facility in Solapur is nearly ready and will handle conversions and retrofits of electric LCVs for customers, starting with the sub-four-ton segment.
- Regulatory reset delayed the rollout: ARAI and Government of India regulation changed in early calendar year 2023, requiring supplier recertification; this has impacted the timeline, though management characterizes the change as positive for safety and quality.
- Partnerships being stitched together: The company is working on several supplier and customer partnerships in India to accelerate EV offerings, though no names or terms were disclosed.
Karan Shah: "I really hope so. Like I said, that the regulation has changed quite a bit this year... it's for the better. It makes the products safer and more quality, but unfortunately, because of this change, a lot of our suppliers have had to go back into recertification, which has impacted our timeline for sure. I hope that, within the next three months, we are able to have the first vehicles on the road."
Margins: A Recovery Story Hinged on Captive Power
- Standalone margin compressed from historical levels: Current EBITDA margin is 13%–15%, down from the mid-20s, driven entirely by an increase in raw material cost; underlying profitability improved versus last year when excluding a ~INR 14 cr exceptional customer compensation income that was present in FY22 but absent in FY23.
- Raw material pass-through works with a lag: All material price movements, up or down, are compensated by customers with a lag of roughly one quarter; there was no negative impact from high-cost inventory in FY23.
- Captive power is the margin catalyst: A 15 MW power plant in Mangalwedha, Solapur, has received its commissioning certificate and awaits one more before full commissioning from July 1; management expects it to add substantially to margin, lifting EBITDA from 15% to 20%, with a sustainable range of 20%–22%.
- Loan-to-equity conversion removes an overhang: Money deployed from PCL into the European Holdco and subsequently into EMOSS has been converted from loan into equity, eliminating related-party interest payment pressure on overseas subsidiaries to the parent.
Karan Shah: "So a sustainable margin is between, let's say 20%-22% is what we would say is a sustainable margin."
Subsidiary Performance: A Mixed Bag
| Subsidiary | Trend | Commentary |
|---|---|---|
| MEMCO | ▲ Growth | Total income rose QoQ (INR 12.3 cr to INR 13.2 cr) and YoY (INR 51 cr to INR 53.4 cr); focus on adding new business from existing and new customers. |
| MFT | ▬ Stable | Total income slightly down QoQ (INR 45 cr to INR 44.9 cr) but up YoY (INR 162 cr to INR 171 cr); business stabilized during difficult times, though European conditions pose ongoing challenges. |
| EMOSS | ▼ Volatile | Full-year income grew YoY (INR 174 cr to INR 231.5 cr) but Q4 saw a sharp QoQ drop (INR 80 cr to INR 52.4 cr) on European component shortages; order book described as solid for the next 2–3 years. |
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| EMOSS revenue recovery | Strive to recover the Q4 supply-chain-driven revenue shortfall | Coming quarters |
| Captive power plant commissioning | 15 MW plant to be fully commissioned, lifting margins toward 20%–22% | July 1, 2023 |
| First EV vehicles on road | Retrofitted electric LCVs to be on Indian roads, subject to supplier recertification | Within three months (from June 16, 2023) |
| Non-camshaft businesses at peak capacity | Ramp-up to peak utilization or peak capacity | Next 1–1.5 years |
| New camshaft awards enter production | Recently awarded camshaft business goes into production | Next 1–1.5 years |
| Standalone capex | ~INR 50 crores | FY24 |
| MEMCO capex | INR 5 crores | FY24 |
| MFT (overseas) capex | ~INR 30 crores | FY24 |
Key Metrics
| Metric | Q4 FY23 |
|---|---|
| Consolidated revenue | ₹1,103 cr (FY23), +22% YoY from ₹914 cr |
| Standalone revenue | ₹660 cr (FY23), +24% YoY from ₹532 cr |
| Consolidated EBITDA margin | 13% (FY23) |
| Standalone EBITDA margin | 13%–15% currently; sustainable target 20%–22% |
| Q4 standalone revenue growth | +12.3% YoY |
| Q4 consolidated revenue growth | +21.6% YoY |
| Q4 standalone income QoQ | +3.25% |
| Q4 consolidated total income QoQ | −3.8% |
| Camshaft castings | 0.58 cr units (FY23), up from 0.51 cr in FY22 |
| Camshafts machined | 0.32 cr units (FY23), up from 0.28 cr in FY22 |
| Machined camshaft growth | 13% YoY |
| EMOSS total income | ₹52.4 cr in Q4, down from ₹80 cr in Q3; ₹231.5 cr in FY23 vs ₹174 cr in FY22 |
| MEMCO total income | ₹13.2 cr in Q4, up from ₹12.3 cr in Q3; ₹53.4 cr in FY23 vs ₹51 cr in FY22 |
| MFT total income | ₹44.9 cr in Q4, down from ₹45 cr in Q3; ₹171 cr in FY23 vs ₹162 cr in FY22 |
| EMOSS revenue split | 30% retro-fitment, 70% OEM supplies |
| Captive power plant savings | ₹12 cr to ₹18 cr annually, meets 25% of existing power requirement |