Key Takeaways
- Cell order book dropped ~₹800 crore as the company paused merchant cell sales to feed its own growing module lines, a deliberate captive-consumption shift, not a demand signal.
- Blended margin held ~28% despite non-DCR pricing compression to ~₹12.5 and transformer margin normalization from 22% to 12%, helped by a richer module mix.
- 7 GW TOPCon cell line is the near-term catalyst: trial runs underway at Naidupeta, commercial production expected November 2026, with ALMM inspection scheduled within weeks.
- China equipment export controls are a live risk but management believes it is advantaged: the high-tech tools now proposed for restriction are already installed in its Naidupeta line.
- What to watch next quarter: ALMM enrollment outcome for the 7 GW plant, the pace of Naidupeta ramp toward 70% CUF by March, and any November 15 policy clarity on ingot-wafer equipment exports.
The Cell Order Book Shift
- Captive consumption, not cancellations: Cell order book declined ~₹800 crore against ~₹470 crore of cell revenue booked because no new cell orders were taken. Module line capacity increased, so more cells were consumed in-house, reducing merchant cell sales. Management confirmed zero order cancellations.
- Inventory is order-backed: All cell and module production is linked to firm customer orders. The raw material inventory buildup reflects advance positioning for the Seetharampur ramp-up and Naidupeta commissioning, plus buffer against shipping congestion from the war situation. Finished goods inventory saw no material change.
- Normalization expected: Inventory position relative to sales is expected to return to normal by the March quarter as factories ramp and production flows through.
Chiranjeev Saluja: "The orders have been won at the prevailing current price environment. And we are hopeful that we will be able to maintain margins subject to cost environment volatility."
Naidupeta 7 GW TOPCon: The Next Leg
- Commissioning underway: The 7 GW TOPCon cell line at Naidupeta is in trial runs; commercial production is expected to start later in November 2026.
- ALMM enrollment in motion: Application has been made to the National Institute of Solar Energy for inspection, expected in the third week of November. ALMM listing is a prerequisite for supplying to government-backed projects.
- Ramp-up trajectory: Management targets 25–30% capacity utilization in December, gradually moving to ~70% by end of March. The cell line carries ~₹2,900 crore of CWIP as of September 30; interest and depreciation expensing will begin in the second half as it commercializes. The annual depreciation is expected to be around ₹600 crores.
- Financial step-up promised: As Naidupeta ramps and Seetharampur volumes pick up over the next few quarters, management expects a major step-up in financial performance.
China Export Controls: Risk & Positioning
- The threat: China is expected to announce new technology export controls, with the final policy awaited in the next 3–4 weeks. Fine print suggests ultra-thin wafer manufacturing equipment may be restricted, while normal ingot-wafer machines may still be permitted.
- Premier's edge: The high-technology equipment now proposed for restriction is already installed in Premier's Naidupeta cell line, putting the company in what management calls an advantageous position.
- Ingot-wafer equipment still un-ordered: Orders for ingot and wafer equipment have not yet been placed. Earlier wafer vendor agreements are being registered with the Chinese government under export control as pre-existing agreements.
- Workarounds in play: Chinese equipment manufacturers have set up assembly shops in Southeast Asia; management does not see this as a big risk and is working with technology and vendor partners to find ways around any restrictions.
Vinay Rustagi: "All the business for these machinery suppliers is basically coming from the export market, and India being the largest of these export markets. These machinery suppliers are working very closely with the government to try and get some relaxations..."
Margin Composition & Pressure Points
- Non-DCR pricing compressed: Non-DCR module pricing dropped from ~₹14–₹15 last year to ~₹12.5 currently, impacting NDCR margin. BOM cost for cells remained largely stable with wafer pricing fluctuating, but recent increases in aluminum, copper, and polymer film costs hit module assembly profitability. Silver prices softened after rising 3–6 months ago.
- Transformers normalized sharply: Margins fell from ~22% last quarter to 12% this quarter. The prior quarter benefited from a variable increase on orders when steel and copper costs rose while the company held hedged inventory. Normalized margin for this business is ~15% going forward.
- Blended margin of ~28%: The richer module mix this quarter supported the blended figure. Management declined to disclose EBITDA spread per watt on a product-by-product basis or the DCR vs non-DCR sales mix.
- DCR pricing power: Management pushed back on the notion that ₹18 is a DCR benchmark, stating Premier commands a premium (₹12.75 and above in non-DCR) due to high-quality automated lines and experience. It does not see this as a near-term risk.
Backward Integration & the Ingot-Wafer Bet
- Phase 1 timeline: Ingot-wafer plant commissioning expected by December 2027. Land procured (169 acres at Naidupeta, adjacent to the 7 GW cell plant), licenses and permitting in place, water allocation done, power approval secured, power lines laid.
- Phase 2 aligned with ALMM-3: An additional 5 GW, taking total to ~10 GW, is expected by June 2028. The company will look for government guidance on any timing changes to ALMM-3.
- The differentiator thesis: Management believes pure-play module assembly will become very difficult and that backward integration into ingot-wafer will separate winners from the rest. Even if cell capacity reaches 100 GW, demand is expected to equal or surpass supply for another 12–18 months. Players with scale, financial bandwidth, and execution skill to set up ingot-wafer will be the differentiators.
Chiranjeev Saluja: "We feel that players which are going to be at scale, who have the financial bandwidth and execution skill to set up ingot-wafer, that is backward integration, will be the ones which will be the difference between men and boys."
New Businesses & International Expansion
- Battery Energy Storage: Plan to operationalize in Q2 2027. Localization strategy covers container manufacturing, fire suppression systems, and Indian-made EMS software. Management is cautious on announcing large investments into BESS cell manufacturing and will focus on cell-to-pack and pack-to-container, which it says will comfortably achieve 40% local content.
- U.S. cell manufacturing: The company is at advanced stages to finalize a factory location in the U.S., already has a JV partner, and is progressing well on setting up cell manufacturing. Timeline to finalize is about 12–18 months.
- Europe also in sight: Both the U.S. and Europe remain geographies of interest, with strong policy pushes toward domestic manufacturing. The company is evaluating several opportunities in both markets.
- Transformers ramp-up: 4 GVA of new capacity being commissioned; all type testing completed for the full range of power transformers except the EHV segment. Revenues expected to more than treble over three years, with a gradual ramp to 80–90% of total capacity.
- Semiconductor ambitions: On the wish list but too early to commit; no firm plan, no partner identified. Management will share details with markets once a firm plan exists.
Chiranjeev Saluja: "That is on our wish list, but it is too early to say or commit anything there. We as a company would want to grow in the semiconductor space. When we would do this, with whom we would partner is something which we do not have an answer today."
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Naidupeta cell line commercial production | 7 GW TOPCon line begins commercial output | Later this month (November 2026) |
| Naidupeta CUF ramp | 25–30% in December, ~70% by end of March | March 2027 |
| ALMM inspection | NISE inspection of Naidupeta plant | Third week of November 2026 |
| Inventory normalization | Inventory position relative to sales back to normal | Latest by March quarter 2027 |
| Ingot-wafer Phase 1 commissioning | First ingot-wafer capacity online | December 2027 |
| Ingot-wafer Phase 2 | Additional 5 GW (total ~10 GW) | June 2028, aligned with ALMM-3 |
| BESS operationalization | Battery Energy Storage System live | Q2 2027 |
| Transformer revenue trajectory | Revenues to more than treble | Over three years |
| Transformer margin normalization | Normalized margins of ~15% | Going forward |
| U.S. cell manufacturing finalization | Factory location and plan finalized | About 12–18 months |
| China export control policy clarity | Final policy announcement expected | Next 3–4 weeks |
| No promoter block | No block from promoters, none planned | Next couple of quarters, or even couple of years |
| No QIP planned | Enabling resolution only; enough cash flow from operations | Near future |
Key Metrics
| Metric | Q2 FY27 |
|---|---|
| Revenue (consolidated) | ₹2,656 cr, up 38.2% YoY |
| EBITDA (consolidated) | ₹760 cr, up 17.8% YoY |
| PAT (consolidated) | ₹462 cr, up 30.8% YoY |
| EBITDA margin (solar manufacturing) | 29.3% |
| PAT margin (solar manufacturing) | 17.9%, moderated slightly due to increase in depreciation and reduction in other income |
| Blended margin | ~28% for the quarter |
| Total order book (cells and modules) | ₹16,260 cr |
| New order wins (cells and modules) | ₹4,001 cr in the quarter |
| DCR proportion of total order book | ~68%–70% |
| Non-DCR proportion of total order book | ~25%–30% |
| DCR module average realization | ~₹21.5–₹22 per watt |
| Non-DCR module price | ₹12.75–₹13 per watt |
| DCR cell price range | $0.12–$0.14 (Mono PERC \~$0.12–$0.125, TOPCon \~$0.14–$0.145) |
| Transcon subsidiary revenue | ₹122 cr |
| Transcon subsidiary PAT | ₹18 cr |
| Transcon EBITDA margin | 15% |
| Transformer business order book | ₹330 cr |
| Transformer business normalized EBITDA margin | ~15%; current quarter at 12% due to normalization after a 22% prior quarter |
| Naidupeta 7 GW TOPCon cell line ramp-up | 25%–30% CUF expected in December, ~70% CUF by end of March |
| FY27 total capex expected | ~₹2,400 cr |
| FY27 full-year depreciation expected | ~₹600 cr |
| CWIP as of September 30 | ~₹2,900 cr, representing the cell line not yet commercialized |
| Retail mix of order book | ~35%–40% |