Primo Chemicals Ltd Growth Catalysts - SOIC x StockScans Report

as of Jul 2026

  1. Flow Tech Chemicals full consolidation - The Board approved acquiring the remaining 51% of Flow Tech Chemicals for ₹55.16 cr, targeting completion by 31 March 2027. Flow Tech, which buys chlorine from Primo, posted FY26 turnover of ₹341.66 cr and PAT of ₹9.80 cr; full consolidation secures chlorine evacuation and directly supports higher chlor-alkali utilisation at Primo's main plant.
  2. 49.998 MW AC captive solar plant - Primo executed a Power Purchase Agreement on 15 May 2026 with SPV TPCS Private Limited, in which it will hold a 26% stake for a ₹21 cr investment. Management expects the fixed-tariff captive supply to deliver annual cost savings of up to ₹24 cr upon commissioning, a material reduction against the current EBITDA base of ₹68 cr.
  3. Caustic soda brownfield ramp-up - The 300-to-500 TPD brownfield expansion is complete, with FY25 production reaching 138,068 MT at 84% utilisation, up from 118,899 MT at 77% in FY24. Every additional point of utilisation on the expanded 165,000-tonne annual capacity flows through at high incremental margin, given the plant is already built and funded.
  4. 700 TPD caustic soda clearance - MoEF clearance has been received to further expand the caustic soda plant up to 700 TPD. This provides a permitted, derisked path to add another 200 TPD of capacity at the flagship unit without restarting the full regulatory cycle.
  5. Downstream portfolio ramp-up - New plants for Stable Bleaching Powder (33,000 TPA), Caustic Soda Flakes, and Aluminium Chloride are all operational, but could not be operated at full capacity during the year under review due to demand pressure. Management is actively focused on improving utilisation across these downstream units, which would lift blended realisations and absorb surplus chlorine.
  6. 26 new products approved - Punjab Pollution Control Board approval is in place to launch 26 new products, and the company is working on plans to add capacities for other inorganic chemicals. The regulatory green light removes the main gatekeeping hurdle, allowing Primo to widen its product mix as downstream demand conditions improve.
  7. 35 MW captive power plant optimisation - The 35 MW captive power plant commissioned in 2023 faced early operational challenges, and the company is now targeting improved performance through maintenance and equipment upgrades. Stabilising this asset would directly lower the cost of power and steam for the main chlor-alkali operations, improving margin resilience.
  8. NSE listing - Equity shares commenced trading on the NSE Main Board on 22 April 2025. The broader exchange presence widens the potential investor base and improves trading liquidity for the ₹581 cr market-cap stock.