Key Takeaways
- A quarter of inventory pain, not demand destruction: Volumes grew 4% YoY but revenue fell 4% and EBITDA margin compressed to 7%, almost entirely because a sharp PVC resin price drop triggered ₹15–20 crores of inventory losses in the trade channel.
- The margin recovery bet is back-half loaded: Management expects Q2 better than Q1, H2 significantly better than H1, and a normalized 12% EBITDA margin by Q4, if not Q3, as inventory losses clear and Bihar plant utilization rises.
- Bihar is the swing factor for both growth and returns: The new plant ships 20,000–25,000 tons in FY26 but will cannibalize other plants in year one; it turns EBITDA-positive from Q3/Q4 and needs ~5 years to break even at 70% utilization.
- Bathware is a small but persistent drag: The segment lost ~₹5 crores this quarter (0.8–1% margin hit) and is not expected to break even until mid-FY27, with a FY26 revenue target of ₹50–60 crores.
- What to watch next quarter: Whether July’s good building-material demand sustains through the monsoon, the pace of Bihar’s ramp-up past 40% utilization, and any price lift from the antidumping duty expected by September/October.
The Inventory-Loss Quarter
- PVC price pass-through hit realizations: Realization dropped ~8–9% YoY, in line with peers, as lower raw material costs were passed on. Revenue degrew 4% YoY even as volumes rose 4%.
- Inventory loss was the margin story: EBITDA margin at 7% was temporarily compressed by ₹15–20 crores of trade-channel inventory losses from the sharp PVC resin price correction. Management stated all inventory loss for built-up inventory has been taken and no further loss is expected at current prices.
- Bathware added to the drag: The Aquel Bathware segment lost ~₹5 crores in the quarter, shaving an estimated 0.8–1% off consolidated margins.
- Finance costs stepped up: Interest cost rose because the Bihar project term loan, previously capitalized, is now an operational expense post-commissioning.
- Staff incentive write-back was mechanical: The write-back on excess staff incentives reflected the lower profit the company made and is a normal evaluation-cycle adjustment, not a structural change.
Nihar Chheda: "by Q4, we should be normalized, if not by Q3"
Volume & Demand: Building Materials Lead, Agri Lags
- Volumes grew despite headwinds: 4% YoY volume growth came through even with persistent demand softness and the PVC price disruption that caused trade-channel destocking.
- July started well, but the mix matters: July demand was good, mainly driven by building material (residential plumbing and SWR). Agri was not great after May and the beginning of June due to monsoons, and agri is ~30% of annual revenue with a large season from March to June.
- CPVC outperformed PVC: CPVC grew at a high single-digit rate in Q1, better than PVC, though management declined to give an exact number.
- Full-year volume ambition: Management is confident of high single-digit to low double-digit volume growth for the rest of the year, supported by government infrastructure spending thrust and capacity additions.
- Industry growth anchored at 6–7%: Long-term PVC industry growth is expected at 6–7% per annum over the next 2–3 years, providing a baseline for the company’s own above-market aspirations.
Nihar Chheda: "we are confident of high single-digit to low double-digit kind of growth should be possible for the rest of the year going forward"
Bihar Plant: The Growth Engine That Drags First
- Phase 2 on track: The Bihar plant expansion is progressing on schedule with expected completion by Q2 FY26, and capacity will reach close to 60,000 tons by 30th September.
- Utilization ramp is back-half loaded: Q1 and Q2 are mostly capacity buildup with overheads not fully absorbed; effective utilization begins from mid-Q2, and once utilization crosses 40%+, the expense drag neutralizes. The plant starts contributing positively at the EBITDA level from Q3/Q4.
- FY26 volume from Bihar: Management expects 20,000 to 25,000 tons from the Bihar plant for the full year.
- Cannibalization is a first-year reality: Haridwar previously served the East; putting up a new plant in a new geography means part cannibalization from other plants in the first year, with net volume addition only in the second or third year.
- Breakeven is a five-year journey: Bihar will take around 5 years to break even if operating at close to 70% capacity, making it a long-duration return proposition.
Nihar Chheda: "It's not that as and when I put up capacity, then the market will grow as per my capacity. So if we put up a new plant in a new geography, it is bound that from the other plants, there is going to be a part cannibalization in the first year."
Margin Path: Normalization, Not Expansion Yet
- The recovery staircase: Q2 will be better than Q1, H2 significantly better than H1, and normalized EBITDA margin of 12% should be reached by Q4, if not by Q3, as inventory losses reduce and product mix improves.
- Volume is the operating leverage lever: Management’s stated focus is on volume growth and capacity utilization to drive cost absorption, while maintaining profitable growth and avoiding predatory pricing. The trade-off is explicit: the organization is prioritizing volume over near-term margin expansion.
- Inventory days are being rebalanced: Raw material days reduced from 45 to 35, while finished goods days increased from 35 to 40 as the company geared up for better demand. The target is 70–75 total inventory days.
- Return ratios under pressure, recovery promised: Profitability hits in recent quarters plus a two-year capex cycle (Jaipur, Telangana, Bihar, debottlenecking) have compressed return ratios. As capacity utilization improves and profitability normalizes, return ratios are expected to improve back to 10–15% and then eventually more than 15%.
Nihar Chheda: "we need to find the right balance between, of course, improving margins. But today, main focus of the organization is on improving volume growth and capacity utilization"
Bathware & Other Bets
- Aquel Bathware expanded geographically: After successful launches in North and West, the brand expanded into the South region with dedicated teams also set up in the East.
- Losses persist, breakeven distant: The segment lost ~₹5 crores in Q1 and is expected to reach breakeven only in 4–6 quarters, by mid-FY27. The FY26 revenue target is a modest ₹50–60 crores.
- Indian Railways branding collaboration: The company is investing in branding on premium trains to strengthen visibility on transport networks, a marketing rather than revenue initiative.
- Ad spend steady: Full-year advertising spend is expected around 2% of revenue.
- Capex for the rest of FY26: ₹160–170 crores, covering Bihar expansion completion, Aquel commitments, and operational capex.
Antidumping Duty: A Potential Catalyst, Not Yet Priced
- Timing expected by September/October: Management indicated the antidumping duty on PVC is likely around September/October but declined to speculate on the magnitude of any resulting price hike, calling it extremely speculative.
- Realizations will track raw materials plus mix: Beyond any duty impact, realizations will move in line with raw material prices, with product mix improvement from a higher CPVC share providing an additional tailwind.
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Volume growth | High single-digit to low double-digit for the full year | FY26 |
| EBITDA margin normalization | 12% normalized margin | By Q4 FY26, if not by Q3 |
| Bihar plant capacity | Close to 60,000 tons | By 30th September 2025 |
| Bihar plant EBITDA contribution | Positive at EBITDA level | From Q3/Q4 FY26 |
| Bihar plant volume | 20,000 to 25,000 tons | Full year FY26 |
| Bihar plant breakeven | ~5 years at close to 70% utilization | ~FY30 |
| Bathware breakeven | Breakeven in 4–6 quarters | By mid-FY27 |
| Bathware revenue | ₹50–60 crores | FY26 |
| Capex (remainder of FY26) | ₹160–170 crores | Rest of FY26 |
| Return ratios | Improve back to 10–15%, then eventually >15% | As utilization and profitability normalize |
Key Metrics
| Metric | Q1 FY26 |
|---|---|
| Revenue from operations | ₹580 cr, -4% YoY |
| Volume | 43,735 metric tons, +4% YoY |
| EBITDA | ₹40 cr; margin at 7% |
| Profit after tax | ₹5 cr |
| Inventory loss | ₹15–20 cr, compressed margins in the quarter |
| Bathware segment loss | ~₹5 cr, translating to 0.8%–1% margin impact |
| Bathware net revenue | ₹11 cr |
| CPVC revenue contribution | 25% plus, up from ~15% over the past 5 years |
| Working capital days | 93 days, improved from 98 days in Q4 FY25 |
| Receivable days | 55 days, improved from 61 days in Q4 FY25 |
| Inventory days | 83 days as on 30 June 2025 |
| Raw material inventory days | 35 days, reduced from 45 days in March 2025 |
| Finished goods inventory days | 40 days, increased from 35 days in March 2025 |
| Capex incurred in Q1 | ~₹75 cr |
| Full-year capex guidance (remainder) | ₹160–170 cr, including Bihar Phase 2 and Aquel commitments |
| Net debt | ₹100 cr debt as at end of June 2025 |
| Bihar plant capacity | Progressed to close to 58,000 tons; target 60,000 tons by 30 September 2025 |
| Bihar plant FY26 volume guidance | 20,000–25,000 tons |
| Ad spend | 1.7%–1.8% of revenue; full-year target ~2% |
| Bathware FY26 revenue target | ~₹50–60 cr |
| Agriculture revenue mix | 30%–35% of revenue on an annual basis |
| Infrastructure revenue mix | 3%–4% of revenue |
| Volume growth guidance (rest of FY26) | High single-digit to low double-digit |
| EBITDA margin normalization expectation | By Q3 or Q4 FY26 |
| Bathware breakeven expectation | By mid-FY27, in 4–6 quarters |
| Long-term PVC industry growth expectation | 6%–7% per annum over the next 2–3 years |