Key Takeaways
- Margin quality improved, but headline EBITDA understates it: Gross margin rose to 47.2% on group procurement scale, while a ₹7.82 crore non-cash hyperinflation loss from Turkey dragged reported EBITDA margin to 25.2% versus 28.3% excluding it.
- The order book is the story: Every factory sits on close to two years of orders at last capacities, and every executable order is booked above guided margins. Management says getting orders is "not a worry."
- Sangli is the swing factor: Trial production is targeted this month, but ~60 customer audits mean full volume transfer takes about six months, and fixed costs will temporarily moderate standalone margins before the facility's ₹1,500–1,800 crore asset turnover potential kicks in.
- Winwin Insulators is a strategic, not just financial, acquisition: It removes an insulator supply bottleneck, adds 765 kV DC HVDC credentials, and management expects to recover its ~₹50–60 crore outlay within two years.
- What to watch next quarter: Whether Sangli trial production actually starts, the pace of Winwin order intake toward its ₹200 crore nine-month target, and any revision to the 20% FY27 growth guidance at Q3.
Margin Walk & Quality
- Gross margin up 260 bps QoQ: 47.2% versus 44.6%, driven by group-level procurement consolidation and approximately ₹3 crores of volume discounts as materials are increasingly bought at group scale.
- Ind AS 29 distortion: Reported EBITDA of ₹64.7 crores includes a ₹7.82 crore non-cash net monetary loss from hyperinflation accounting on Turkish operations. Excluding it, EBITDA would have been ₹72.5 crores at 28.3% margin.
- Forex was neutral excluding hyperinflation: The company had a ₹7.5 crore loss from the hyperinflation accounting entry, not a gain; excluding that, forex gain/loss was zero.
- Raw material lag cuts both ways: Mehru's eight-week manufacturing cycle means input prices flow through quickly, which is why its Q1 EBITDA came in at ~18% versus a 22–23% internal target after April copper and oil spikes. Quality Power's coil products have a longer cycle, so current raw material movements hit standalone financials mainly in Q2 and Q3.
- Standalone gross margin caution: Standalone gross margins increased significantly this quarter, but management attributes this partly to sharp price increases and dollar depreciation, and explicitly warned not to extrapolate. Traditional factory margin is about 25% over the last six quarters.
Pandyan: "Please don't build your castle based on these numbers, please build your castle based on the numbers we've guided. We will always try to do better."
Order Book & Pricing Discipline
- Two years of visibility: Each factory is sitting on close to two years of order book at last capacities, with the current book slated for completion in the next 15 months.
- Pricing discipline intact: Every executable order currently in the order book has been booked above the margin guidance communicated to the market. Management has not compromised pricing to build volume.
- Coil products booked above guidance: Stable guidance for the coil products business is about 20%, but most orders booked are in excess of 25%.
- Order intake timing is deliberate: In about three months, once the new Sangli facility is taken over and stabilized, the company will take in more orders. Management declined to commit to maintaining the current order book-to-bill ratio for one to two years, saying only "we would try our best."
- Mehru is capacity-constrained, not demand-constrained: Already full with orders, supplying one in two high voltage instrument transformers in India, with customers writing framework orders rather than small packages. Current facilities will reach 100% very soon.
Pandyan: "Getting orders is not a worry at this moment for us."
Sangli Facility: The Execution Test
- Trial production targeted this month: August 2026, subject to remaining approvals including a building completion certificate from authorities. A Vastu Shanti pooja is scheduled for the 13th and 14th of this month.
- The audit gauntlet: About 60 audits on the facility are needed before it can take over full volume from the existing factory, taking about six months from the day the facility opens. First priority is Hitachi global approval (five or six audits), then Adani and Power Grid HVDC audits, about eight audits before shifting to the next project.
- Margin drag before payoff: Fixed costs such as depreciation, manpower, power and factory overheads will come into the P&L before utilization ramps up, with some temporary moderation in standalone margins expected, particularly in Q3. As utilization increases over the next 15 months, costs should be progressively absorbed.
- Revenue timeline: Management expects some revenue trickling in from Q3, with Q4 being when turnarounds would be seen.
- Asset turnover potential: The facility is expected to deliver ₹1,500 crores to ₹1,800 crores.
- Order intake opens up later: The company will start opening up for more orders maybe at Q3 this year once comfortable with the facility.
Winwin Insulators: The Strategic Bolt-On
- Due diligence complete: Confirmatory due diligence on Winwin Speciality Insulators Limited has been completed without adverse findings, with progress toward definitive agreements.
- The rationale is supply leverage: Insulators are a bottleneck for the industry, and management frames the acquisition as removing a constraint on its own growth. "Insulators is something that we cannot live without."
- Credentials already in place: Winwin finished type tests up to 220 kV in the last month, with 400 kV and 765 kV slated in the next few months, and already has 800 kV / 765 kV DC insulator orders for HVDC projects in India. It also has a 400 kV composite insulator type test from KEMA Netherlands.
- Order target: Management is targeting about ₹200 crores of orders in the next nine months, with the factory good for at least ₹300–400 crores per year initially.
- Margin profile: Currently seeing anywhere between 15% and 25%, expected to stabilize in about four quarters from the acquisition date.
- Consolidation timing: Will happen out of Q4, not before, because the SEZ property requires bureaucratic sign-offs in Delhi.
- Payback expectation: Management expects to collect its cheque back in the next two years, noting the amount paid for the business per se is about ₹50–60 crores.
Pandyan: "The amount of money I paid for the business per se is about INR50 crores, INR60 crores... I think in the next two years I should be able to collect my cheque back."
WS Insulators: The US Entry Vehicle
- Lockbox protection: The acquisition has a lockbox agreement in place, meaning any losses until the day of acquisition are to the owners' account.
- Already supplying 765 kV class insulators in America under a different brand through white labelling. The company will stop white labelling very soon and enter markets itself.
- Branding transition: The Vizag plant is rebranded as Winwin, with ability to use the WS logo perpetually for insulators, to be changed to Quality Power sooner. All approvals, type tests and credentials are inherited.
- Management continuity: WS management and directors are absorbed into Quality Power, retain shares, and will continue running the business.
- Indian market orders already in hand: Including Power Grid for 765 kV and 400 kV, with approvals being pursued.
- Capital raise purpose: The company intends to raise close to ₹500 crores, with road shows starting the 20th of this month before the AGM. Proceeds are for closing the WS acquisition, ₹50 crores capex at the WS location, a US sales team and sales office, and next-generation technologies in US markets.
Growth Engines: BESS, HVDC, GIS
- BESS demand is the fastest growth engine: Demand for power conversion systems globally is very high, with most governments focused on battery cells while power electronics, software and hardware are often missed. Very few players exist, and IGBTs remain a bottleneck across the world.
- Endoks timeline: Civil construction of the power conversion system facility in Turkey is complete, with operations expected to begin during Q3 this year. Management declined to give FY28 contribution guidance, saying the factory is not operational and a number now would be "shooting in the dark."
- HVDC magnet wire facility: Machinery installation is commencing, with machines already on and power in place. Another three months of trial run is anticipated, with full production by Q4 of this year, plus three to five months for stabilization as a new product.
- HVDC orders: Two HVDC programs targeted, one old part already awarded with Q3/Q4 execution expected, and the Barmer tender complete and should be awarded anytime soon.
- STATCOM pipeline: A couple of STATCOMs already secured in the US, with about half a dozen projects across US, Europe and Australia in talks.
- GIS plant: New plant for GIS manufacturing is being installed and should be ready this quarter with all clean rooms. First product to be tested is 220 kV GIS components, switching to 400 and 765 kV in the next year.
- Data center opportunities: USD 10 crore bids are ongoing, with delivery periods of about 12 months that the company is still struggling with.
- BESS India entry: Management would like to start BESS in India for Indian and Asian markets by end of next year, once the business is stabilized in India.
Pandyan: "At this moment, I will be shooting in the dark when I give you a number."
Competitive Landscape & Supply Chain
- Chinese HVDC entrants face a long road back: The government has allowed four Chinese companies to bid for HVDC contracts, but management notes most of their factories were de-rated in the last seven years and shut down for a long time with no teams. It will take a couple of years for them to return to where they were six to seven years back. Local sourcing norms still require 60–70% domestic content.
- Component shortages rotate across products: CTC cables, IGBTs for BESS, aluminium casting for Mehru, and springs for Sukrut have all been pinch points. Management says it is effectively managing rather than blaming one or two components.
- High voltage substation growth is supply-constrained: The global growth rate for high voltage substations is much lower compared to BESS because of component shortages. Even if equipment is made faster, customers won't take delivery until large power transformers and other equipment arrive at site.
- Insulator supply as leverage: As the company increases its product scope, it can leverage or barter customer growth with the supply of insulators to them.
- Ancillary business is understated: A lot of internal consumption is not treated as sales due to accounting standards, so the company does not take credit for it, limiting reported ancillary revenue despite building considerable capacity. Over the next two to three years, ancillary should do at least ₹500 crores in aluminium wire, equal to about ₹1,500–1,800 crores in copper wires as CTC business.
Pandyan: "We are not one product, we are making about 12 or 13 products and every factory has its own set of worries. And that set of worries changes every quarter."
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Sangli trial production | Begin trial production, subject to approvals | August 2026 |
| Sangli full volume transfer | ~60 customer audits completed | ~6 months from facility opening |
| Sangli revenue contribution | Revenue trickling in from Q3, turnarounds visible in Q4 | Q3–Q4 FY27 |
| Sangli asset turnover | ₹1,500–1,800 crores | No date (post-ramp) |
| Endoks operations | Operations begin | Q3 FY27 |
| HVDC magnet wire production | Full production after 3 months trial run | Q4 FY27 |
| Winwin order intake | ₹200 crores of orders | Next 9 months |
| Winwin margin stabilization | Stabilize at 15–25% range | ~4 quarters from acquisition |
| Winwin consolidation | Consolidate into group financials | Q4 FY27 |
| FY27 revenue growth | 20% growth, possible revision at Q3 | FY27 |
| EBITDA margin | Model at 20% or high teens | FY27 |
| Mehru EBITDA margin | ~18% going forward | Forward guidance |
| Capital raise | Close to ₹500 crores, road shows from 20th | Before AGM |
| WS Insulators white labelling exit | Stop white labelling, enter markets directly | "Very soon" |
| BESS India entry | Start PCS for Indian and Asian markets | End of next year |
| Ancillary revenue | At least ₹500 crores in aluminium wire | Next 2–3 years |
Key Metrics
| Metric | Q1 FY27 |
|---|---|
| Revenue | ₹256.4 crores |
| Gross profit | ₹121 crores, gross margin improved to 47.2% from 44.6% |
| Reported EBITDA | ₹64.7 crores, margin of 25.2% |
| Adjusted EBITDA | ₹72.5 crores, margin of 28.3%, excluding ₹7.82 crores non-cash Ind AS 29 hyperinflation loss |
| Profit before tax | ₹59.4 crores; adjusted PBT ₹67.2 crores excluding Ind AS 29 |
| Profit after tax | ₹46.7 crores; adjusted PAT ₹54.5 crores excluding Ind AS 29 |
| EPS | ₹4.66, up from ₹3.12 |
| Finance costs | ₹1.4 crores |
| Depreciation | ₹3.9 crores, expected to rise as new facilities are capitalized |
| Interim dividend | ₹0.25 per share |
| Consolidated order book | ₹1,945 crores, approximately 1.9x last year's revenue |
| Order book breakdown | Endoks ₹801 crores, Mehru ₹585 crores, Quality Power standalone ₹553 crores |
| FY27 revenue growth guidance | 20%, management sticking to guidance, possible revision at Q3 |
| EBITDA margin guidance | 20% or high teens, management will try to deliver better |
| Mehru Q1 EBITDA margin | About 18%, impacted by copper and oil prices in April; revised guidance raised to around 18% from above 15% |
| Endoks existing product lines margin | Normally around 25% for STATCOM, SVCs, automations |
| BESS pipeline | About $6 crore in PCS orders, anticipating another $4 crore in next 12 months |
| BESS execution cycle | Six to nine months for most orders |
| Sangli facility peak revenue potential | ₹1,500 crores to ₹1,800 crores |
| Order book execution timeline | Next 15 months |
| Winwin Insulators enterprise value | Approximately ₹315 crores |
| Winwin Insulators revenue potential | ₹250–300 crores without capex, ₹450–500 crores with capex |
| Winwin Insulators margin expectation | 15% to 25%, stabilizing in about four quarters from acquisition |
| Total group debt | About ₹23 crores, mostly working capital at subsidiary level |
| Proposed capital raise | Less than ₹500 crores, road shows starting 20th of this month |
| Proposed capex at Winwin location | ₹50 crores for capacity enhancement |
| Endoks facility peak revenue potential | At least $70–80 million, facility costing about $2 million with $1 million more expected |
| Standalone business traditional margin | About 25%, consistent over last six quarters |
| Ancillary business CTC revenue potential | At least ₹500 crores in aluminium wire over next two-three years, equal to ₹1,500–1,800 crores in copper wire equivalent |