Key Takeaways
- Steady quarter, recovery building: Revenue grew 5% QoQ and ~9.5% YoY, helped by new customer additions and the early stages of a European market recovery.
- Margins improved despite gross headwinds: EBITDA margin rose to 23.1% from 21.6% in Q4, even as gross margin compressed; steel prices have stabilized with only a 2–3% incremental increase.
- The EV/hybrid pivot is accelerating: EV and hybrid supply started aggressively in Q1, with one European and one domestic customer pushing PPAP orders for 12–14 components, shifting the mix away from traditional passenger vehicles.
- Balance sheet is nearly debt-free: Net debt fell below ₹20 crore, with a net debt-to-equity ratio of just 0.025%, giving the company a clean platform for the growth cycle ahead.
- What to watch next quarter: Whether the European recovery sustains its QoQ pace, the ramp-up of the new US-based EV program toward its November/December SOP, and the resolution of the solar plant dispute that has delayed the 11.5 MW installation.
Demand Environment & Regional Mix
- Europe is the swing factor: Revenue from Europe dropped from 20–23% of the total to less than 15%, a ~30% decline from peak, but a slight recovery began in the June quarter and management expects QoQ improvement of a couple of percentage points, reaching 17–18% of business by fiscal year-end rather than the prior 22–23%.
- Domestic market is the steady engine: Existing customers increased volumes and added new products, customers added in FY23 are now fully ramped, and new components from existing customers continue to flow in.
- July run rate signals momentum: Monthly revenue hit ₹110 crore in July 2023, a 4–6% increase over the prior quarter's average, and management expects to maintain a similar average through the current quarter despite September festival holidays.
- New customer pipeline is filling: The company added 4–5 new customers in the last 12–15 months; two domestic customers are yet to fully ramp, two overseas customers were added in the last year, and a couple more are in progress.
- A new territory opens mid-FY25: Management disclosed a program award in a territory where the company has never operated before, with SOP expected in mid-FY24–25.
Doshi: "Let me tell you, we are also starting business or we are going to start the supply SOP somewhere in mid of 24, 25 of in the territory where at present, we were not at all there till in the history of the company."
EV & Hybrid: The Mix Shift
- EV/hybrid supply started aggressively in Q1: One European customer supplying a US plant and one domestic customer placed significant PPAP orders for 12–14 components, pushing the EV/hybrid share higher and making the passenger vehicle share appear lower on a comparative basis.
- The PV share decline is a mix effect, not a loss: Dispatches of traditional IC components grew less than EV/hybrid, so the passenger vehicle percentage fell from 42% to 38.5%; no business was lost, and the classification did not change.
- A major US-based EV program is nearing SOP: A large US auto component manufacturer awarded a program for EV and hybrid vehicles supplying its Brazil and Mexico plants; samples are approved, SOP is expected November/December 2023, with a first ramp-up in June 2024 and final ramp-up by December 2024, carrying a business value of ₹60–80 crore.
- A domestic OEM Gen-3 bearing ring win: A domestic four-wheeler OEM awarded a program for generation-three bearing rings and wheel hubs covering both EV and existing sedan/SUV vehicles. [2–3]
- EV contribution target for FY25: Management expects EV to reach 12–14% of total revenue, with the European EV business starting from mid or the last quarter of FY25 and domestic EV starting from the end of FY24.
- Hybrid order ramp-up underway: Current monthly run rate of ₹2.5–3 crore is expected to reach approximately ₹5 crore per month by the last quarter of this fiscal.
Operational Capacity & Capex
- Capacity utilization sits at ~65%: Sufficient capacity exists for programs with SOP in this fiscal and next, with no significant capex needed beyond certain value-added equipment.
- A new forging line is on the way: One forging line ordered from Japan will be dispatched by end of this month, arrive in October 2023, and enter commercial production from January 2024.
- Capex is modest relative to the growth outlook: ₹40–50 crore is planned for FY24 and FY25 combined for value-added process equipment and maintenance; total FY24 capex including amounts already incurred through July is approximately ₹70 crore.
- Future capex decisions are order-dependent: Management noted that FY25–26 capex will depend on the type of orders received, and since it takes a minimum of one year to start SOP, there is sufficient time to add capital; no equipment decisions for FY25 can be made now.
- A large domestic customer is scouting capacity in Gujarat: Another very big domestic customer is starting a new plant in Gujarat, and Rolex's facility is the most suitable for their sourcing; inquiries have been received to spare capacity for supply in FY25.
Margins & Cost Structure
- EBITDA margin improved 150 bps QoQ to 23.1%: The improvement came despite gross margin compression, helped by operating leverage and stable steel prices, which have seen only a 2–3% incremental increase versus six months ago.
- Gross margin guidance is 48–50%: Management expects gross margins to remain in this range going forward.
- The domestic/overseas mix is stable: The ratio of approximately 60% overseas and 40% domestic is expected to vary by only a couple of percentage points.
- A tube-to-forging shift adds incremental revenue: One major Indian customer shifted bearing production from the tube route to the forging route; the company was awarded 40–45 components, samples are in process, and bulk supply starts in 2–3 months, adding over ₹35 crore in annual revenue once all ranges are covered.
New Program Wins & Pipeline
| Program | Details |
|---|---|
| US-based EV/hybrid (Brazil & Mexico) | Large US auto component manufacturer; samples approved, SOP Nov/Dec 2023, first ramp-up Jun 2024, final ramp-up Dec 2024; business value ₹60–80 crore. |
| Indian Tier-2 EV/hybrid (US OEM) | Indian auto component manufacturer supplying a US OEM; SOP from Jun 2024; PPAPs to be submitted by end of Sep/Oct 2023. |
| Domestic OEM Gen-3 bearing rings | Four-wheeler OEM; program for EV and existing sedan/SUV wheel hubs. [2–3] |
| Tube-to-forging replacement | Major Indian customer; 40–45 components awarded; bulk supply in 2–3 months; additional annual revenue >₹35 crore. |
| New territory customer | Program awarded in a territory where the company has never operated; SOP mid-FY24–25. |
| European customer (different from above) | Another customer with Europe plants; ramp-up to ~₹155 crore by FY25–26. |
- Ramp-up cadence is well-defined: From the date of SOP, it generally takes 8–12 months to reach peak supply levels.
- A Russian customer award is stalled: A program was awarded but is facing issues, and the PPAP order has not yet been released.
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| FY24 revenue growth | 12–14% vs FY23 | FY24 |
| FY24 EBITDA margin | 22–24% range | FY24 |
| FY25 revenue growth | Conservative estimate of 16–18% | FY25 |
| European market recovery | Reach 17–18% of business (not prior 22–23%) | By end of FY24 |
| US EV program ramp-up | Fully ramped, business value ₹60–80 crore | By last quarter of FY25 (Mar 2025) |
| Second customer ramp-up (Europe plants) | ~₹155 crore | By FY25–26 |
| New forging line | Commercial production start | January 2024 |
| Gross margin | 48–50% range | Ongoing |
| EV contribution to total revenue | 12–14% | FY25 |
| Q2 FY24 growth | 2–3% vs June 2023 quarter | Q2 FY24 |
| Solar plant (11.5 MW) | Start generation | Expected October 2023 |
| Capex (value-added equipment + maintenance) | ₹40–50 crore | FY24 and FY25 combined |
| Capex (FY24 including incurred through July) | ~₹70 crore | FY24 |
Key Metrics
| Metric | Q1 FY24 |
|---|---|
| Revenue | ₹311 crore, +5% QoQ vs ₹299 crore in Q4 FY23 and +9.1% YoY vs ₹285 crore in Q1 FY23 |
| Operational revenue growth | +9.5% YoY |
| EBITDA | ₹72 crore, 23.1% margin vs 21.6% in Q4 FY23 |
| PBT | ₹65 crore, vs ₹57 crore in Q4 FY23 and ₹61 crore in Q1 FY23 |
| PAT | ₹48 crore, vs ₹46 crore in Q4 FY23 and ₹50 crore in Q1 FY23 |
| Gross margin | ~48%, vs ~45% in Q4 FY23 and 52% in Q1 FY23; FY23 full year ~49% |
| FY24 revenue growth guidance | 12–14% vs FY23 |
| FY25 revenue growth guidance | 16–18%, conservative estimate |
| EBITDA margin guidance | 22–24% |
| Monthly order book run rate | ₹118–122 crore |
| Net debt | Less than ₹20 crore, net debt equity 0.025% vs 0.06% in March 2023 |
| ROE | 25–27% |
| Capacity utilization | ~65% |
| Revenue mix: bearing rings vs auto components | 56% bearing rings, 44% automotive components |
| Revenue mix: exports vs domestic | 57% exports, 43% domestic |
| Passenger vehicle segment contribution | 38.5%, down from 42% in FY23 |
| Industrial segment contribution | 24.3% |
| Commercial vehicle and heavy commercial contribution | 28% |
| Europe revenue share | Less than 15%, down from 20–23% at peak; ~30% decline |
| EV and hybrid contribution expected in FY25 | 12–14% of total revenue |
| CAPEX for FY24 and FY25 combined | ₹40–50 crore for value-added process equipment and maintenance |
| CAPEX for FY24 including incurred till July | ~₹70 crore |
| July 2023 monthly revenue | ₹110 crore, monthly run rate up 4–6% from Q1 average |
| Q2 FY24 revenue growth guidance | 2–3% QoQ vs Q1 FY24 |
| New US-based customer (Brazil, Mexico, US) peak annual revenue | ₹60–80 crore, full ramp-up by Q4 FY25 |
| Another customer (Europe plants) peak annual revenue | ~₹155 crore by FY25-26 |
| Tube-to-forging replacement order additional annual revenue | More than ₹35 crore |
| EV order (eight parts) peak annual revenue | ₹150 crore, revenue starting Q4 FY24 |
| Hybrid order monthly run rate | ₹2.5–3 crore, started May 2023; expected to reach ~₹5 crore per month by Q4 FY24 |
| Railways contribution | 3–4% of overall business, expected to increase by another 1% in FY24 |
| Solar plant: 4 MW | Operational, power generation for last three months |
| Solar plant: 11.5 MW | Expected to start by October 2023 |
| New forging line from Japan | Commercial production from January 2024 |