Key Takeaways
- Record quarter, revenue doubled: Turnover more than doubled YoY to INR126 crores, driven by a new semiconductor customer ramp and a major space program milestone.
- Profitability swung sharply positive: PBT surged to INR6.7 crores from near-zero a year ago, while H1 PBT hit INR10.7 crores against a loss of INR5.9 crores in the prior period.
- Margins are temporarily compressed: Investments in manpower, technology, and new-customer First Article Inspection processes have lowered margins, with management promising a healthier H2.
- A INR300 crores QIP is imminent: The fundraise, expected to close by end of December, will fund a 150,000 sq ft capacity expansion and working capital to fuel growth from new customers.
- What to watch next quarter: Whether the promised H2 margin recovery materializes, the pace of inventory consumption against the INR286 crores buildup, and any concrete progress on the active Airbus dialogue.
The Quarter's Performance Engine
- Semiconductor ramp: Revenues from a new semiconductor customer surged in its very first quarter post-qualification, delivering a strong contribution that helped double overall turnover.
- Space milestone: A major program completed qualification and source inspection, positioning the segment for accelerated growth with a substantial order expected.
- Existing base also grew: Growth came from both new customers and the existing base of approximately 30 customers, particularly in space and semiconductor industries.
- Tariff risk neutralized: Most customers have availed tariff benefits so recent changes had no impact; the company implemented a robust entitlement number tracking system for all defense shipments to ensure duty-free US entry.
- Localization tailwind: For one contract, all mechanical components previously sourced from US incumbent suppliers are now procured from Indian suppliers at over 20-30% cost savings for foreign OEMs.
Gupta: "This is not just a milestone, it is a clear signal of strength of our strategy and the resilience of our team."
Margins: The Investment Phase
- Current compression explained: Margins are lower this year because of investments in manpower and technology, plus the First Article Inspection process required when onboarding new customers. FAI involves a learning curve, so margins on new work start below those on qualified, repeat components.
- Recovery promised: Management expects margins to improve in Q3 and Q4, which have historically been the strongest quarters, with the EBITDA percentage becoming "much healthier" in H2.
- Long-term range set: EBITDA margin will always be in the 15% to 20% range moving forward, with a wider 15% to 22% band cited for the company's activities.
- Inventory overhang: Inventory rose to INR286.37 crores, up INR32.58 crores QoQ, strategically aligned to fuel FY26 revenue targets. Much of this will be consumed this financial year, with a significant change in inventory days expected by year-end.
- Inventory mix improving: New customers in space, energy, and semiconductors have shorter contract turnaround times of 6-12 months, unlike traditional long-term defense contracts, which should bring significant balance-sheet improvement.
Gupta: "This year itself, in the third and fourth quarter, you should see a change coming in our percentage of EBITDA, and it should get much healthier. And moving forward, very confident it's going to be in the range of 15% to 22%."
Capacity Expansion & Fundraise
- Physical expansion: A major 150,000 sq ft addition within existing premises, taking total capacity from 225,000 to 375,000 sq ft, at an estimated cost of INR70 crores. Construction starts Q4 this financial year, with the facility operational within 18 months.
- QIP fundraise: Actively evaluating a fundraise of up to INR300 crores through QIP, primarily for capex and working capital to fuel growth from new customers. Expected to close within approximately 45 days, by end of December.
- Runway claimed: Management stated the INR300 crores fundraise should be sufficient until financial year 2029, as revenues and profits will grow significantly.
- Split undisclosed: Management declined to provide the split of the INR300 crores between working capital and capex, saying that information will come after necessary clearances.
- Inventory goal: The stated goal is to become a four-turn inventory company, holding roughly three months of inventory, though management acknowledged this will take time.
Customer & Program Deep-Dive
- Lockheed Martin recognition: Received an Outstanding Supplier Recognition Certificate at Lockheed Martin's Annual Supplies Conference 2025, commended for excellence in manufacturing cable harness assemblies across aeronautics, rotary and mission systems, and missile and fire control programs.
- Lockheed Martin contract expected: Management expects to receive another contract from Lockheed Martin by the end of this year.
- Boeing T7 program: Production has started, though there have been delays. Almost all design changes have been implemented, which will speed up output, with numbers expected to start increasing from next financial year.
- Interconnect Systems structure: The end customer for Interconnect Systems work is Lockheed Martin, operating under a tri-party agreement between the three companies.
- Airbus dialogue: Active dialogues are happening; management visited Airbus recently and is meeting them again soon, but nothing has materialized yet. Management is "hoping to start a relationship sooner than later."
- Space and semiconductor customers: Rossell is dealing with "the best of the best space companies," a very limited set. Management declined to name specific customers but indicated names are available in public forums.
- Semiconductor application: The harnesses supplied go to tools and machines that help produce or process wafers for semiconductors.
Gupta: "So we haven't even scratched the surface yet with these two different companies or three companies that we work with today. So the growth can be very, very significant moving forward."
Certifications & Compliance Milestones
- AS9110 progress: Cleared Stage 1 of the AS9110 audit, moving closer to full certification. The AS9110 MRO license should be secured within the next 30 days.
- DSIR license renewed: Through March 2027.
- CMMC 2.0 compliance: Preparations underway for the November 2026 deadline.
- R&D project: One project, a wiring analyzer used for in-house cable testing needs, has been developed and now needs qualification.
Revenue Mix & Outlook
- Space and semiconductor mix: Approximately 25% of revenue this year comes from space and semiconductor; that share will increase moving forward.
- Growth visibility: Management stated the growth momentum seen this year will continue for at least the next six to eight quarters.
- Strategic contract profile: Average life of strategic agreements is approximately three to five years, with some fixed-price and some carrying equitable price adjustment clauses.
- Localization push: Active dialogue with customers to keep increasing India content and localization, though management declined to put a specific number on the current level.
- Order book question unanswered: An analyst attempted to ask why the order book remained at INR700 crores from Q1 to Q2, but the question was not answered due to poor audio connection before the call was terminated.
Gupta: "Historically, the third and fourth quarter are the strongest periods for our sector and with a robust order book, sectoral diversification, new customer wins and a clear road map for expansion, we believe the best is yet to come."
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| EBITDA margin recovery | EBITDA percentage to become "much healthier" in H2 | Q3 and Q4 FY26 |
| Long-term EBITDA range | 15% to 20% (or 15% to 22%) | Ongoing |
| Lockheed Martin contract | Expecting another contract award | By end of this year |
| AS9110 MRO license | Full certification secured | Within next 30 days |
| QIP fundraise close | INR300 crores raised | Within approximately 45 days, by end of December |
| Capacity expansion operational | 150,000 sq ft addition complete | Within 18 months of Q4 FY26 construction start |
| Boeing T7 program ramp | Production numbers to start increasing | Starting next financial year |
| Revenue momentum | Growth momentum to continue | At least next six to eight quarters |
| Inventory days improvement | Significant change in inventory days | By end of this year and starting next year |
| Fundraise sufficiency | INR300 crores to cover needs | Until financial year 2029 |
Key Metrics
| Metric | Q2 FY26 |
|---|---|
| Revenue | ₹126 cr, more than double ₹51.35 cr in Q2 FY25 |
| H1 FY26 revenue | ₹212 cr, more than double ₹95.9 cr in H1 FY25 |
| Profit before tax | ₹6.7 cr, compared to ₹0.06 cr in Q2 FY25 |
| H1 FY26 profit before tax | ₹10.7 cr, compared to a loss of ₹5.9 cr in H1 FY25 |
| H1 FY26 EBITDA | ₹27.1 cr, nearly five-fold from ₹5.7 cr in H1 FY25 |
| EBITDA margin target | 15% to 22%, expected range; margins lower this year due to new-contract learning curves and FAIs |
| Gross margin | 37%–38% (per an analyst's math), historically around 50% |
| Closing inventory | ₹286.37 cr, increase of ₹32.58 cr over previous quarter |
| Inventory target | four turns, equivalent to three-month inventory |
| Confirmed purchase orders on hand | over ₹720 cr, with average execution time of two to three years |
| Strategic agreements | ₹2,500 cr, long-term agreements from which POs are placed six to 12 months before deliveries |
| Bids submitted in Q2 | ₹920 cr to ₹990 cr, weighted decisions expected through the year |
| Win rate on proposals | slightly over 50% |
| Revenue from semiconductor and space | ~25% of total revenue expected by end of FY26, increasing to closer to 40% next year |
| Workforce | 1,092 total, with 856 on-role employees |
| Capacity expansion | 150,000 sq ft within existing premises, estimated cost ₹70 cr for land and building, construction starting Q4 FY26, operational within 18 months |
| Fundraise planned | up to ₹300 cr through QIP, expected to close by end of December 2025, sufficient through FY2029 |
| Cost savings from localization | over 20% to 30% for foreign OEMs |