Key Takeaways
- Volume-led revenue, margin squeeze: Revenue rose 5% YoY on ~13% volume growth, but EBITDA per tonne fell to ₹451 as a ₹100/tonne cost increase outpaced modest price gains.
- Full-year EBITDA guidance held at ₹500–₹550: Management calls the range "definitely doable," betting on stable prices and H2 cost savings from three initiatives to more than offset the ₹100/tonne inflation.
- Andhra Cements is the margin lever: The acquired unit still carries a ₹100–₹125/tonne variable-cost penalty versus Mattampally, but utilisation is climbing toward 60% and a new mill arrives this quarter.
- Balance-sheet repair is the stated priority: No growth CapEx for at least two years; the plan hinges on ₹150 crore from the Vizag land sale this year and another ₹200 crore next year to cut net debt from ₹1,565 crore.
- What to watch next quarter: Whether the Q2 maintenance shutdowns and seasonal demand softness push the H2 catch-up burden higher, and whether the generic GO for the Vizag land sale actually materialises.
Volume & Demand
- Broad-based volume growth: Q1 volumes rose ~13% YoY, with Andhra Pradesh and Telangana leading at ~11% growth, Kerala at 12%, and Tamil Nadu at ~4% despite an election-hit April. Karnataka was flat.
- Government spending is the prime mover: Amaravati capital development is driving Andhra demand, while Telangana's Indiramma Pathakam low-cost housing scheme has started six lakh houses. Private demand was also described as very strong.
- Near-term headwinds are seasonal, not structural: Heat waves and election-related labour shortages in Eastern and Southern India temporarily disrupted Q1; the first six months post-election in Kerala and Tamil Nadu tend to be slower. Labour has since returned.
- July demand looks like June: Management expects AP and Telangana to keep growing, and a delayed monsoon is keeping construction activity going in some pockets.
- Full-year South demand seen accelerating: From ~6%–6.5% currently to 8%–10% for the full year, with AP, Telangana, Tamil Nadu and Madhya Pradesh expected to contribute to 15% volume growth in H2.
Sreekanth Reddy: "Prices have to move up because if you look at last 10 year, the inflation on cement pricing, I think it is flat. So that should also push, whereas the cost inflation has been quite substantial. So even from that perspective, prices have to move up. Prices did go up, but unfortunately, they could not hold up because of the volatility in demand on a month-to-month."
Pricing & Realisations
- Early-quarter gains faded: Price hikes lifted realisations at the start of Q1, but competitive intensity and regional dynamics eroded momentum by quarter-end, leaving realisations broadly stable to marginally improved sequentially.
- Flat from March to July: Prices were unchanged from the March exit through July, and from June to July. The ₹50–₹60 overall realisation improvement likely came from product mix or small sustained increases rather than broad price traction.
- Competitive intensity is the ceiling: Management argues prices are bound to rise because cement pricing has been flat for a decade while costs have climbed substantially, but concedes that industry players are "losing patience" and competitive flare-ups keep breaking the momentum.
Sreekanth Reddy: "Unfortunately, most of the industry players are losing patience. Competitive intensity sometimes flares up, but prices are bound to go up. It's a question of when and by how much."
Costs & Margins
- ₹100/tonne cost inflation pencilled in for FY27: Roughly half from fuel, half from miscellaneous items. Clinker costs are at their peak now, with some moderation expected by October.
- Q1 power & fuel cost rose to ₹1,484/tonne from ₹1,450/tonne a year ago, while freight was marginally lower at ₹858/tonne. The sequential cost increase was limited to ~₹100/tonne because the company carried inventory, cushioning the blow versus peers who saw ₹150–₹200/tonne jumps.
- Q2 will carry extra cost weight: Maintenance shutdowns at Mattampally and Jeerabad will elevate costs and trigger an inventory adjustment from clinker stockpiled ahead of the shutdowns. Management expects no volume impact but warns Q2 operational metrics will be below par.
- Three cost-saving initiatives land in H2: The newly commissioned 1.55 MW waste heat recovery at Gudipadu, the 0.05 crore tonne expansion at Jeerabad, and the new cement mill at Andhra Cements (due end of September) are together expected to more than offset the ₹100/tonne inflation and still deliver net savings.
- Plant utilisation is highly uneven: Jeerabad ran at 96% while Dachepalli was at just 42% and Jajpur at 50%, leaving significant fixed-cost absorption headroom.
Sreekanth Reddy: "I don't think we have ability to control the inflation. We only have ability to control the quantity of usage."
Andhra Cements: The Turnaround Bet
- The cost gap is structural but narrowing: Andhra's variable cost runs ₹100–₹125/tonne above Mattampally because it lacks waste heat recovery and draws substantial grid power at higher cost. Fixed costs are also higher because the bulk of the group's debt sits at Andhra while Mattampally is debt-free.
- Utilisation is climbing: From sub-30% at acquisition three years ago to close to 50% now, with a target of ~60% by end of this year. Management expects Andhra to operate at 60%–70% for the coming years despite high competitive intensity in the neighbourhood.
- New mill is the next catalyst: A 0.08 crore tonne cement capacity expansion is likely to be completed before the end of Q2 FY27, contributing to cost savings from H2 onward.
- WHRS is on the roadmap: Management plans to install waste heat recovery at Andhra in the next couple of years, targeting savings similar to those achieved at other plants.
- Merger is a matter of timing: Management stated the consolidation of Andhra Cements into Sagar is "only a matter of time," though no timeline was given.
Sreekanth Reddy: "It's only a matter of time when Andhra would get consolidated into, I mean, rather merged into Sagar."
Balance Sheet & Capital Allocation
- Net debt stood at ₹1,565 crore: The plan is to reduce it to ₹1,159 crore this year, factoring in ₹150 crore from the Vizag land sale. Another ₹200 crore is expected from land monetisation in FY28.
- The Vizag land sale is stuck on a government GO: The state government now intends to issue a generic GO covering multiple similar assets rather than a case-specific one, following a precedent set in Telangana a few months ago. Management still expects the ₹150 crore to land this year but has no control over the timeline.
- No growth CapEx for at least two years: Beyond the ₹240 crore of ongoing spend spread across this year and next, the only planned outlay is ~₹30–₹40 crore per year for operational maintenance, a posture management says holds "up to end of 2028 for sure."
- The stated focus is debt reduction and land monetisation: Management explicitly framed these as the key priorities for the next two years.
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| FY27 volume | Approximately 0.7 crore tonnes (excluding clinker sales) | FY27 full year |
| FY27 EBITDA per tonne | ₹500 to ₹550, assuming stable prices | FY27 full year |
| Cost savings vs inflation | Three initiatives (Gudipadu WHRS, Jeerabad expansion, Andhra mill) to more than offset ₹100/tonne cost inflation | H2 FY27 |
| Andhra Cements utilisation | Reach close to 60% | By end of CY2025 |
| Andhra Cements mill | 0.08 crore tonne expansion commissioned | Before end of Q2 FY27 |
| Vizag land sale realisation | ₹150 crore | FY27 (pending GO) |
| Vizag land sale realisation | ₹200 crore | FY28 |
| Net debt reduction | From ₹1,565 crore to ₹1,159 crore (including ₹150 crore land proceeds) | FY27 |
| Growth CapEx | None beyond ongoing ₹240 crore and ~₹30–₹40 crore/year maintenance | Through end of FY28 |
| Super fine building material | Operational plan shared | By end of Q2 FY27 |
Key Metrics
| Metric | Q1 FY27 |
|---|---|
| Revenue | +5% YoY, driven primarily by higher volumes |
| Volume growth | ~13% YoY |
| EBITDA per tonne | ₹451 |
| Loss after tax | ₹28 crore |
| Full-year EBITDA per tonne guidance | ₹500 to ₹550, assuming stable prices |
| Full-year volume target | ~0.7 crore tonnes, excluding clinker sales |
| Power and fuel cost per tonne | ₹1,484, vs ₹1,450 in Q1 FY26 |
| Freight cost per tonne | ₹858, vs ₹860 in Q1 FY26 |
| Gross debt | ₹1,704 crore as on 30th June 2026, of which ₹1,434 crore long-term |
| Net worth (consolidated) | ₹1,833 crore as on 30th June 2026 |
| Debt equity ratio | 0.78:1 |
| Cash and bank balances | ₹105 crore as on 30th June 2026 |
| Mattampally plant utilisation | 65% |
| Gudipadu plant utilisation | 79% |
| Bayyavaram plant utilisation | 67% |
| Jeerabad plant utilisation | 96% |
| Jajpur plant utilisation | 50% |
| Dachepalli plant utilisation | 42% |