Key Takeaways
- Demand slump hit the top line: Rural roofing demand stayed sluggish through nine months, and a monsoon that stretched from May to October wiped out the seasonally strong Q1, dragging capacity utilization to 66% for the 9M period.
- Cost pressures compounded the pain: Elevated raw material costs, an 8–9% forex-driven rise in imported fibre prices, and stabilization spend at the new Perundurai plant all weighed on EBITDA, with only partial cost pass-through achieved.
- A capex cycle is underway despite the soft patch: Two new plants are in the pipeline: a 72,000 MT non-asbestos board unit in Maharashtra and a 120,000 MT asbestos sheet unit in Odisha, signaling a bet on geographic expansion and next-generation products.
- Management is unhedged and unapologetic about it: Forex exposure on imports is deliberately left open as a matter of policy, a stance that amplifies raw material volatility in a year when the rupee slid from ~₹76 to ₹80–82.
- What to watch next quarter: Whether the promised Q4 utilization bounce to 77–80% materializes, any follow-through on the Odisha land acquisition, and the trajectory of ocean freight costs now that they have started to ease.
Demand & Volume
- Rural roofing drove the weakness: Demand for roofing services slowed materially, concentrated in rural India where construction activity is tightly linked to the agricultural calendar and monsoon patterns.
- Monsoon overstayed its welcome: Continuous rainfall from May through October prevented house construction and renovation during Q1, which is normally the strongest quarter. The lost Q1 volume cascaded into lower full-year capacity utilization.
- January offers a tentative turn: Business sentiment in January improved over December, aligning with management's expectation that Q4 and the next year's Q1 would be better after a sluggish nine months.
- The monsoon link is weakening but not broken: Government support and incentives now cushion the impact of a poor monsoon, but the seasonal pattern still matters for on-ground construction activity.
Maheshwari: "Earlier the dependability or the impact of the monsoon was much more. Now if the monsoon is not there then government starts giving a lot of incentives or those things. So the impact is not, but we cannot ignore the monsoon."
Cost Structure & Margin Pressure
- Fibre costs are a monopoly game: Asbestos fibre is supplied by only two global suppliers, leaving Sahyadri with negligible pricing power on its largest raw material input. Prices have been reduced 4–5% for the next year, but a forex fluctuation of 4–5% would erase that benefit entirely.
- Forex amplified the import bill: The rupee's move from ~₹76 to ₹80–82 created a straight 8–9% impact on imported raw material costs, and the company passes only a portion of cost increases to customers.
- Freight dynamics are mixed: Fibre is imported on a CIF basis, so ocean freight changes are borne by the supplier and embedded in the price, meaning Sahyadri does not capture the benefit of falling freight on imports. On exports, the company has shifted to FOB terms after being burned by steep freight hikes, insulating itself from that risk going forward.
- Other expenditure swelled: Nine-month other expenditure rose to ₹114 crores from ₹95 crores, driven by shipping freight and brand-building and marketing activities, particularly in the South region. Marketing spend was budgeted at ₹6 crores but curtailed to ₹5 crores for FY '23 based on results.
- Power and fuel are immaterial: These costs are very low as a percentage of sales; fibre is the dominant cost driver.
Maheshwari: "See fibre there is a monopoly. There are only two suppliers. So you don't have say much. Whatever as I said, we have to take it."
Forex & Hedging
- Unhedged by design: Management does not hedge forex exposure as a matter of policy, believing that hedging costs exceed rupee depreciation over the long run. The entire import exposure remains open.
- The stance is absolute: When pressed, management declined to engage on hedging as a strategy, stating flatly that the position is always unhedged and they do not believe in the practice.
Maheshwari: "We don't hedge it. It is unhedged always. We don't believe into that."
Plant Operations & Capacity
- Perundurai stabilization weighed on EBITDA: The new plant has started contributing but is working at only 50% capacity due to teething issues, and the stabilization phase increased expenditure.
- Utilization split tells the story: Flagship products ran at higher utilization than roofing products, where the rural demand slowdown hit hardest. Overall 9M utilization stood at 66%.
- Q4 utilization targeted at 77–80%: Management expects capacity utilization to improve in Q4, which is seasonally a better quarter, with the new plant also expected to pick up.
- Chennai facility ramp-up: Utilization at the Chennai value-added products facility is expected to cross 50% in FY24–25.
Capex & Expansion
- Maharashtra non-asbestos board plant: Capacity of 72,000 metric tons; land identified and acquisition in process; project loan tied up but no drawdown yet; ₹22 crores spent from internal accruals so far. Timeline: Q4 FY25.
- Odisha asbestos sheet plant: Capacity of 120,000 metric tons; land identification work still in progress with no timeline committed.
- Funding approach: Management aims to fund maximum capex from internal accruals, with the balance via loans. The Maharashtra project loan is MCLR-linked and expected to rise with RBI policy rate changes.
- Non-asbestos positioned as the future: Management sees the non-asbestos cement board as a replacement for plywood and wood, with demand increasing and the product positioned for long-term growth.
Maheshwari: "I feel that is going to be the product for future."
Balance Sheet & Working Capital
- Working capital strain from fibre sourcing: The company shifted from LC-based fibre purchasing to advance payments, with advances remaining with suppliers for 30–60 days. This created an additional working capital requirement of approximately ₹100 crores, layered on top of the normal ₹60–70 crores.
- Finance costs rose on two fronts: The new unit added to borrowing, and the shift to advance payments for fibre drove up working capital debt.
- Absolute debt undisclosed: When asked for the current absolute debt number, management did not have it at hand and said it would be provided later.
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Capacity utilization | Improve to 77–80% in Q4 | Q4 FY23 |
| Full-year revenue | ₹575–600 crores | FY23 |
| New plant utilization | Improve from current 50% | Q4 FY23 |
| Maharashtra non-asbestos plant | Commission 72,000 MT capacity | Q4 FY25 |
| Chennai facility utilization | Cross 50% utilization | FY24–25 |
| Ocean freight benefit | Positive impact from reduced freight costs | Q4 FY23 |
Key Metrics
| Metric | Q3 FY23 |
|---|---|
| Consolidated total income | ₹123.7 cr, vs ₹111.2 cr in Q3 FY22 |
| EBITDA | ₹16.2 cr, vs ₹15.3 cr in Q3 FY22 |
| PAT | ₹4.7 cr |
| EBITDA margin | vs 13.8% in Q3 FY22 |
| 9M FY23 consolidated total income | ₹429.5 cr, vs ₹413.5 cr in 9M FY22 |
| 9M FY23 EBITDA | ₹69 cr |
| 9M FY23 PAT | ₹32.4 cr |
| 9M FY23 capacity utilization | 66%, vs 79% in 9M FY22; excluding new capacity would be 70–71% |
| Revenue mix (asbestos : non-asbestos) | 74:26 in Q3; 78:22 in 9M FY23 |
| Export share | ~14% of total sale in Q3; ~12% in 9M FY23 |
| Flat sheet sales split | 50% domestic, 50% export |
| Raw material cost increase | ~15–16% total (forex impact 8–9%, asbestos fibre pricing increase due to Ukraine war); 60–70% passed to market |
| Perundurai plant overhead impact on EBITDA | ₹1.5–2 cr |
| Debt-to-equity ratio | 0.4:1 |
| Interim dividend | ₹2.5 per equity share (face value ₹10) for FY23 |
| FY23 revenue guidance | ₹575–600 cr, on track |
| Maharashtra capex spent so far | ~₹22 cr, from internal accruals |
| Marketing expenses budget FY23 | ₹5 cr, curtailed from ₹6 cr |
| Fibre price reduction for next year | 4–5%, but may be offset by forex fluctuation |