Key Takeaways
- Best-ever Q1 sales, profit jumps 2.7x: Saleable steel production rose 12% YoY and sales volume 15% YoY, driving PBT to INR890 crores despite a one-time INR1,050 crores stock valuation hit.
- The stock valuation drag masks underlying strength: A INR950 crores negative impact from falling coal prices depressed reported EBITDA per ton; this non-cash headwind will not repeat in Q2.
- Borrowings fell INR1,100 crores in a single quarter: Debt reduction from INR29,811 crores to INR28,741 crores signals improving cash generation, even as capex is set to rise.
- Steel prices are stabilizing after a soft July: NSR improved QoQ (long products INR54,500 vs INR53,300), and management sees early signs of recovery in both flat and long products after the rainy season trough.
- What to watch next quarter: Whether the promised stock valuation reversal materializes, the trajectory of steel prices through the seasonally stronger H2, and any quantification of the NMDC marketing margin contribution.
Quarterly Performance: The Stock Valuation Distortion
- Topline growth was solid but unspectacular: Turnover grew 8% YoY, lagging the 15% volume jump, because NSR gains were partly offset by the product mix and the one-time stock valuation charge.
- The INR1,050 crores stock valuation hit is a non-cash, one-time event: Imported coal prices fell INR5,000-6,000 per ton, reducing the cost of production and thus the rate at which finished steel and in-process inventory is valued. This charge will not repeat in Q2.
- Underlying profitability was stronger than reported: Excluding the stock valuation impact, sales price/NSR actually contributed a positive INR650-700 crores to the QoQ bridge, offset by the INR950 crores negative from stock valuation.
- EBITDA per ton dipped on paper only: At INR6,400 vs INR6,000 in Q1 last year, the metric was weighed down by stock valuation rates, not by operational deterioration.
- Q1 technical parameters are seasonally weaker than Q4: Q4 is the best producing quarter; Q1 includes planned capital repairs and shutdowns, so production consistency and technological parameters like fuel rate and coke rate are not directly comparable.
- Other expenses rose on iron ore royalty: Higher other expenses vs Q4 stem from iron ore royalty linked to IBM price movements, a variable that may fluctuate quarter-to-quarter but is now flat.
Panda: "Because the imported coal prices come down around INR5,000 to INR6,000 per ton. That is why the cost of production is also down in quarter 1 as compared to quarter 4 as well as previous year quarter 1. That is why the stock valuation rate, which is equal to the stock valuation cost, so it has come down."
Steel Prices & Demand Outlook
- NSR improved sequentially across both product categories: Long product NSR rose to INR54,500 from INR53,300 in Q4; flat product NSR rose to INR50,400 from INR47,300, reflecting a better product mix and some price firmness early in the quarter.
- July brought the seasonal monsoon softness: Steel prices dipped in July, consistent with the rainy season pattern, but management noted stabilization and early improvement in the last 1-2 weeks across both flat and long products.
- The H2 bet is on seasonality and government spending: Management expects prices to improve in the next quarters, which have traditionally remained the strongest for steel producers, supported by government infrastructure spending, residential sector demand, capital goods, automotive and consumer durables.
- Indian steel demand remains structurally supported: The World Steel Association forecasts India steel demand growth in excess of 8%, and the Indian economy is projected to grow 6.3%-6.7% over the next two years.
- Rail price revision provided a one-time INR173 crores benefit: The Joint Pricing Committee finalized prices for FY23-24, and the amount was booked in Q1. No further revision benefit is expected this year.
- Provisional rail price set lower for FY25-26: At INR74,000 per ton, down from INR78,000, reflecting the softening of imported coal prices that feed into the pricing formula.
Costs & Raw Materials
- Imported coal prices are the swing factor: The INR5,000-6,000 per ton decline in Q1 cut both ways: it reduced the cost of production (a real cash gain) but also triggered the stock valuation write-down (a non-cash charge). Going forward, if coal prices rise, stock valuation rates will increase, creating a positive P&L impact.
- Coking coal prices expected flat to slightly up in Q2: Management guided that Q2 coking coal prices will be almost flat versus Q1, possibly a little higher, but not on the downside.
- Coking coal inventory is at normal levels: 25-30 days of inventory at ports and approximately 5 days at plants, providing a stable buffer.
- Iron ore royalty remains a variable cost: The higher other expenses in Q1 were driven by IBM price-linked royalty on iron ore. Management indicated IBM prices are now flat, so this headwind may not repeat in Q2.
- Operational efficiencies are delivering real cost advantage: Improved fuel rate, coal-to-hot-metal ratio, increased CDI, reduced coke rates, and reduced basic energy consumption in Q1 versus the prior-year quarter all contributed to the 2.7x PBT growth.
Capex & Expansion
- FY26 capex target set at INR7,500 crores: The Board has approved the plan, up from INR6,000 crores last year, and management is confident of achieving it.
- A larger capex jump is coming in FY27: Management expects a "good jump" from the INR7,500 crores base, with actual numbers to be crystallized once packages are finalized.
- IISCO expansion is moving toward order placement: The plan envisions 0.45 crore tons of expansion (0.4 crore tons new capacity plus 0.05 crore tons from debottlenecking). Tendering activities are ongoing.
- IISCO timeline points to spending from FY27 onward: Order placements are scheduled for Q3/Q4 of FY26 (December-January), with execution spanning approximately 36 months and expenditure generally starting next year.
Panda: "As per the scheduled dates given by them actually, order placements will take place in '25, '26... end of third quarter and fourth quarter, all of fourth quarter. I mean, the schedule is December, January like that."
NMDC Steel Marketing: A Breakeven-Plus Contributor
- SAIL is marketing NMDC steel under a third-party agreement: In Q1, SAIL sold approximately 0.04 crore tons of NMDC steel, generating revenue of around INR1,800 crores with a purchase cost on stock-in-trade of approximately INR2,000 crores.
- The arrangement is breakeven-plus at the EBITDA level: Management described the margin contribution as "breakeven plus positive" but declined to quantify it, citing the agreement's terms.
- Volume trajectory is uncertain: The NMDC plant is still ramping up, and management said exact sales volumes for the rest of the year are difficult to forecast because the quantity cannot be frozen at this stage.
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Stock valuation reversal | INR1,050 crores one-time negative impact will not repeat; Q2 will have an advantage on stock valuation rates | Q2 FY26 |
| Full-year sales volume | Around 1.85 crore tons, excluding NMDC volumes | FY26 |
| Capex spend | INR7,500 crores, higher than FY26's INR6,000 crores | FY26 |
| IISCO expansion order placement | Orders expected December-January; expenditure starts FY27 | Q3/Q4 FY26 |
| Coking coal price direction | Flat to slightly up vs Q1; not on the downside | Q2 FY26 |
| Capex jump in FY27 | "Good jump" from INR7,500 crores, quantum TBD when packages crystallized | FY27 |
Key Metrics
| Metric | Q1 FY26 |
|---|---|
| Saleable steel production | 0.47 crore tons, +12% YoY |
| Sales volume | 0.46 crore tons, +15% YoY, best ever first quarter |
| Revenue growth | +8% YoY, lower growth due to impact of lower prices |
| Profit before tax (before exceptional items) | ₹890 cr, more than 2.7x vs ₹326 cr in Q1 FY25 |
| EBITDA per ton of saleable steel | ₹6,400, vs ₹6,000 in Q1 FY25 |
| Blended NSR | ₹51,700 per ton, vs ₹50,100 in Q4 FY25 |
| Long products NSR | ₹54,500 per ton, vs ₹53,300 in Q4 FY25 |
| Flat products NSR | ₹50,400 per ton, vs ₹47,300 in Q4 FY25 |
| Blended coking coal cost | ₹16,918 per ton, vs ₹17,653 in Q4 FY25, improvement of ~₹600-700 per ton |
| Imported coking coal cost | ₹17,600 per ton, vs ₹18,500 in Q4 FY25 |
| Borrowings | ₹28,741 cr as on 30 June 2025, reduced by ~₹1,100 cr in Q1 vs ₹29,811 cr as on 31 March 2025 |
| Stock valuation impact (Q1 vs Q4) | ₹950 cr adverse, primarily due to lower imported coal prices reducing cost of production |
| Iron ore royalty impact (Q1 vs Q4) | ₹173 cr adverse, due to IBM price movement |
| Full year sales volume target (SAIL products) | ~1.85 crore tons, excluding NMDC volumes |
| Full year capex target | ₹7,500 cr, approved by Board, vs ~₹6,000 cr in FY25 |
| IISCO expansion total capex | ~₹36,000 cr ballpark, spread over 3-4 years |
| NMDC Steel marketing volume | 0.04 crore tons, revenue of ~₹1,800 cr in Q1 |
| Finished goods inventory | 0.17 crore tons saleable steel, 0.13 crore tons in-process stock as on 30 June 2025 |
| Coking coal inventory | 25-30 days at ports, ~5 days in plants |
| July expected blended NSR | ~₹50,000 per ton, longs ~₹51,500, flats ~₹48,600 |