- Record H1, margin dip in Q2: Revenue and EBITDA grew 76% and 94% YoY in H1, but Q2 EBITDA margin fell sequentially as the rainy season pushed up raw material moisture and costs.
- The pivot to stainless steel is now concrete: Phase-1 capex of Rs. 935 crore is finalized, land and key approvals are in hand, and the HR coil mill is procured, targeting a Q4’27 commissioning for 3,60,000 tons of SS capacity.
- Value-added mix is climbing fast: Value-added sales volume hit 1.7 lakh tons per annum, up 59%, and the company has started producing higher-grade 304 series stainless steel, with 316 and other grades targeted this quarter.
- EBITDA per ton guided at Rs. 7,000–8,000: Management sees Rs. 7,000 as a conservative, maintainable yearly figure, with an aspiration to reach near Rs. 8,000, supported by a shift toward galvanized and stainless steel products.
- What to watch next quarter: Whether pipe galvanizing utilization hits the 95% target, the pace of stainless steel utilization improvement, and any clarity on the brownfield expansion plan and the additional 58,000-ton SS capacity.
Performance & Margin Drivers
- H1 volume and profitability surge: Total sales volume, revenue, EBITDA and PAT grew 51%, 76%, 94% and 109% YoY respectively in H1 FY26, marking the strongest half-year in the company’s history.
- Q2 margin compressed by seasonal factors: The rainy season reduced mine production capacity and increased moisture content in iron ore and coal to 3%-4%, which lowered recovery margins and prevented price corrections; those corrections only arrived in October.
- Financial costs fell sharply: Financial cost dropped 46% QoQ as the company progressed toward repayment of long-term borrowing.
- Employee costs rose on expansion hiring: The QoQ increase came from hiring sales, marketing and technical staff for the stainless steel section ahead of the Kesda plant expansion, plus a one-time bonus of around Rs. 1.5 Cr paid in September.
- No inventory loss this quarter: Major inventory is raw material (coal, pellets, iron ore), while intermediate and finished goods are kept at minimum and consumed consecutively; raw material prices corrected only post-September.
- HR coil vs patra price gap is stable: The gap of Rs. 5–6 is consistent with yearly averages. Since the company produces HR coil through the secondary route, its costing is similar to patra pipe but it sells at the market-equivalent HR coil price, so margins remain healthy.
Management: "Our target itself currently is, we are hoping that we will be near 8,000 EBITDA per ton. But on a conservative basis, we believe 7,000 is what is very much achievable looking at the current set up for MS coil market."
Stainless Steel Expansion: The Kesda Bet
- Phase-1 fully dedicated to stainless steel: The board finalized a Rs. 935 crore capex plan, with Rs. 810 crore for process cost for 3,60,000 tons of stainless steel capacity and Rs. 125 crore for a captive power plant. The earlier MS-SS mix was converted entirely to SS for the first phase to maximize operational efficiency at high volume.
- Key milestones cleared: The expert appraisal committee recommended environmental clearance on 24 October 2025, land acquisition is complete, and the HR coil mill has been procured. Phase-1 is targeted for commissioning by Q4’27, with management trying to achieve it earlier.
- Revenue potential is significant: Phase-1 stainless steel coil production of 2,40,000–2,45,000 tons carries a revenue potential of Rs. 2,400–2,800 crore, depending on market prices.
- Product grade ladder being climbed now: The company previously concentrated on 202 and 204 grades; it started manufacturing 304 series in September 2025 and produced 1,100 tons in two months. 304 commands Rs. 1,85,000 per ton versus Rs. 1,25,000 for 202. 316, 316L, and thermos steel N/SN grades are targeted this quarter.
- Utilization ramp-up expected in 6–9 months: Management expects to achieve 70% utilization of the new SS capacity within 6 to 9 months of commissioning and plans to use the 15-month lead time to connect with the market and pitch the product.
- Sales model may include contractual MOUs: The company may enter into quantity-based (not price-based) MOUs with large cold-rolling mills for SS coil sales going forward.
- Forward integration deferred until grades are mastered: Value-added stainless steel products like pipes will be pursued only after all grades are achieved and full integration manufacturing is in place; management views this as a small, easily executed value-addition step.
Management: "And if we make the same product at a high volume, then our operational efficiency is also better. That's why we thought that we do stainless steel in the first phase."
Product Mix & Capacity Utilization
- Value-added shift is deliberate and measurable: Value-added production capacity reached 2.5 lakh tons per annum, with value-added sales volume at 1.7 lakh tons per annum, higher by 59%. Pre-Galvanized Division utilization improved to 89% and Stainless Steel Division to 86%.
- ERW volume growth is muted by design: ERW volume growth is in single digits because production is being diverted to galvanized products (GP coil and pipes), which carry higher margins. GP coil production increased QoQ.
- Pipe galvanizing utilization target is 95%: Currently at 85%, management targets 95% by next quarter. Stainless steel utilization, also at 85%, has a chance of a 10% increase this quarter.
- CR capacity being expanded in steps: Cold-rolled capacity is being increased to 60,000 tons, then to 1,20,000 tons, with further increases planned as volume is achieved.
- SS product mix targets a 60:40 ratio: Internal thinking favors a 60:40 split between 200-series and 300-series products for optimum EBITDA return and market acceptability; actual numbers will be confirmed once production starts.
- MS vs SS margin dynamics: EBITDA percentage is the same in both at 12%–13%, but per-ton realization differs sharply: MS at Rs. 50,000 yields Rs. 6,000 EBITDA, while SS at Rs. 1,30,000 yields Rs. 15,000 EBITDA. Management notes that scaling SS tonnage is a difficult task compared to MS.
Management: "Yes, there is a difference per ton, but stainless steel per ton, that is, it is a difficult task on tonnage. MS is an easy task."
Raw Material & Cost Outlook
- Coal costs are near a bottom: The government removed the Rs. 400 per ton cess on coal, 18 new mines were auctioned in the fourth tranche, and old-mine coal is now available. Coal is available at digging cost of Rs. 1,200 per ton.
- Iron ore supply is expanding: Private mines were auctioned for the first time in Chhattisgarh (MNS and Rungta acquired mines), and new production is coming online: 0.45 crore tons from Gadchiroli by March, 0.3 crore tons from Raipur already started, and 0.2 crore tons starting this month. Palletization facilities exist in the area.
- Raw material benefit flows to finished-price margins: Management expects that when raw material cost benefits flow through, margins on finished prices will increase rather than decrease.
- No mine ownership planned: The company holds no iron ore or coal mines and has no plan to acquire them, arguing that government policy is bringing iron ore to very low rates and that owning mines would not be workable.
Management: "No, sir. Right now, we don't have any iron ore mines or coal mines. And we don't even have any plan right now because the government's attempt is to bring iron ore at a very low rate."
Market Structure & Demand
- Integrated players will consolidate share: Players like Sambhv who make their own HR coil and pipes are expected to constitute 25%–30% of the market in 3–4 years. Pipe demand is growing at 9% on average, so increased production will be absorbed.
- Stainless steel demand is strong and supply is tight: Demand is growing very fast in India, BIS standards on imports have been implemented and imports have decreased, while domestic production is limited, supporting good margins.
- MS coil price floor appears near: The current landed cost of Chinese material and Indian prices are at equilibrium; management believes prices going down from here looks very difficult.
- Export is opportunistic, not a target: The company has no export target for MS and SS segments. In GP, it is exploring the Middle East market and will export as and when queries or sales requirements arise.
- Government product approvals are broadening the customer base: Product approvals were received from 11 government departments in the last six months, including BMC, MHADA, SIDCO, MP Jal Nigam, Delhi CPWD and BHEL.
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| EBITDA margin range | Operate around 13% | Coming quarter |
| EBITDA per ton | Rs. 7,000 (conservative, maintainable yearly); aspiration near Rs. 8,000 | FY26 |
| Pipe galvanizing utilization | Reach 95% (from 85%) | Next quarter |
| Stainless steel utilization | 10% increase (from 85%) | This quarter |
| Phase-1 SS capacity commissioning | 3,60,000 tons at Kesda | Q4’27 (intimated to exchange); management trying earlier |
| Phase-1 revenue potential | Rs. 2,400–2,800 crore from SS coil production | Upon Phase-1 commissioning |
| New SS capacity utilization ramp | Achieve 70% utilization | Within 6–9 months of commissioning |
| FY28 revenue | Around Rs. 4,500 crore | Once additional capex is in existence |
| FY28 margin | 10%–13% depending on market conditions | FY28 |
| FY28 revenue split | 60%–65% stainless steel, 35%–40% GP and ERW pipes | FY28 |
| Captive power plant savings | Rs. 2 crore per MW per year from 25 MW plant | Upon commissioning |
Key Metrics
| Metric | Q2 FY26 |
|---|---|
| Revenue | ₹580 cr, up 83% YoY |
| EBITDA | ₹60 cr, up 168% YoY |
| EBITDA margin | 10.4% |
| PAT | ₹30 cr, up 446% YoY |
| PAT margin | more than 5% |
| Financial cost | down 46% QoQ |
| H1 FY26 revenue | ₹1,139 cr, up 76% YoY |
| H1 FY26 EBITDA | ₹133 cr, up 94% YoY; margin 11.7% |
| H1 FY26 PAT | ₹63 cr, up 109% YoY; margin 5.6% |
| H1 FY26 total sales volume growth | 51% YoY |
| EBITDA per ton (H1 FY26) | ₹6,950 |
| EBITDA per ton guidance (FY26) | ₹7,000 maintainable on a yearly basis, range ₹6,000-₹8,000 |
| Value-added sales volume (H1 FY26) | 1.7 lakh tons per annum, up 59% |
| Capacity utilization – Pre-Galvanized Division | 89% |
| Capacity utilization – Stainless Steel Division | 86% |
| Phase-1 CAPEX estimate | ₹935 cr, of which ₹200 cr already spent as of 30 Sep 2025; balance ₹735 cr to be funded via debt of up to ₹600 cr and internal accruals |
| Phase-1 stainless steel coil capacity | 3,60,000 tons per annum, targeted commissioning by Q4 FY27 |
| Phase-1 revenue potential | ₹2,400 cr to ₹2,800 cr depending on market price |
| FY28 revenue guidance | around ₹4,500 cr, margin 10%-13% |
| FY28 revenue split (SS vs GP/ERW) | 60-65% stainless steel, 35-40% GP and ERW pipe |
| One-time employee bonus cost in Q2 | around ₹1.5 cr |