Key Takeaways
- Record value-added volume, but margin compressed: Q3 delivered the highest-ever sales volume of value-added products, yet EBITDA per ton fell to INR5,200 from INR6,100 in Q2 as HR coil price drops hit pipe realizations immediately while raw material benefits lagged.
- Q4 recovery is priced in: Management expects EBITDA per ton to rebound to INR7,500 in Q4, driven by a ~10% coil price increase, low-cost Q3 inventory flowing through, and the end of maintenance shutdowns.
- Stainless steel is the growth thesis: Brownfield expansion to 1,16,000 tons completes by March 2026, a 3,50,000-ton greenfield at Kesda is on track for Q4 FY27 commissioning, and China's export tightening from January 2026 reshapes the competitive landscape.
- PLI 2.0 approval secured, but quantum undisclosed: The entire expansion now qualifies under the PLI scheme, yet management declined to quantify the benefit until the government MOU is executed, expected by mid-February.
- What to watch next quarter: Whether the INR7,500 Q4 EBITDA per ton materializes, the pace of stainless steel 300-series ramp-up toward the 50-50 mix target, and any concrete timeline on the seamless pipe and DFT plant entries.
Q3 Margin Compression: What Broke and Why It Reverses
- HR coil price pass-through was immediate, raw material relief was not: When HR coil prices fell ~6% versus Q2, pipe and tube selling prices dropped right away. But iron ore and sponge iron costs did not decline proportionately, and the benefit of lower-cost ore procured in November only reaches the P&L in Q4.
- Government import window added pricing pressure: A 3-month window (October-December) allowed stainless steel imports without BIS billets, creating a 2%-3% pricing headwind during the quarter.
- Maintenance shutdown compounded the hit: A 15-day shutdown to commission the wider-width CR coil mill and coal rolling mill for galvanising expansion reduced production and sales of intermediate products.
- Gross margin fell on high-cost inventory liquidation: Old high-cost stock was sold at lower prices through October-November-December. A price increase was announced in December, took effect in January, and profits from that increase will be visible only in Q4.
- The Q4 reversal has three legs: Coil prices have already risen ~INR4,000 in January with a further increment in February; low-cost raw material procured in Q3 will be consumed in Q4; and the maintenance shutdown is complete.
Vikas Kumar Goyal: "But due to the price of HR coil falling, the price of pipe and tube fell. That came into effect immediately. So, our sales realisation decreased a little. Due to this, the impact of HR coil also fell."
Stainless Steel: The Strategic Pivot
- Brownfield doubling near completion: Capacity is expanding from 58,000 tons to 1,16,000 tons, with implementation targeted by end-March 2026 and benefits flowing from Q1 FY27. Unlike the CR complex expansion, this faces no production disruption during commissioning.
- Greenfield at Kesda anchors the long term: Phase 1 will add 3,50,000 tons of stainless steel capacity, with commissioning expected by Q4 FY27 and commercialization reflecting in Q1 FY28 numbers. The project cost is approximately INR930-940 crores, of which INR250 crores was already incurred by December. Financial closure for Phase 1 is achieved.
- China's export tightening is a tailwind: Effective January 1, 2026, China tightened its export regime for stainless steel to curb underpricing and illegal trade through Dubai, Indonesia and Vietnam routes. This reshapes the competitive environment for domestic producers.
- 300-series ramp-up underway: Good feedback has been received on the 300 series, and management targets a 50-50 mix between 200 and 300 series in Q4.
- Branding whitespace identified: Management sees a large unaddressed market for stainless steel branding in India, noting that incumbents like APL and Jindal did not build brands. The strategy starts with pipes, then moves to kitchenware and water bottles.
- PLI eligibility de-risks the investment: The entire expansion program now qualifies under the PLI 2.0 scheme, with two application files approved and the MOU process with government expected by the second week of February.
Management: "Brand building has a huge space in stainless steel. As you have seen, APL did not do it. Jindal was very old in black, but he did not do much branding. By the way, today we feel that there is a huge market blank of branding in stainless steel."
Product & Capacity Roadmap
- Galvanising capacity already expanded: Production capacity increased from 1,00,000 tons to 1,16,000 tons in Q3, with sales benefits accruing in the last month of the quarter.
- Seamless pipe entry under study: Management is researching stainless steel seamless pipes, not carbon steel, and is exploring tie-ups for market survey and production technology. The rationale is a logical extension after successful execution in carbon and stainless steel welded pipes, moving into higher-value, higher-technology products.
- DFT pipe plant in planning: A 2-lakh-ton DFT pipe and tube plant for sizes above 7 inches to 14 inches is in the planning stage, with an announcement expected soon. Management highlights this as an approval-based, high-margin business that adds value to coil procurement.
- MOU partnerships scaling: Four MOUs were signed for co-branding stainless steel pipes in Raipur, Gwalior, Sambalpur and Jamshedpur, with four more signed in January. Marketing expenditure per MOU holder will increase, and the target is to grow monthly coil sales from the current ~5,000 tons.
- Kesda will shift the coil sourcing mix: When Kesda production comes online, 80%-90% of product will be made from own coil, with coil width increasing from 470mm to 650mm. Above 650mm will still require outside procurement.
Management: "So from that point of view logical extension after our two successful implementation of business model for carbon and stainless steel. So investing in high value product and high technology oriented product is a logical extension."
Margin Structure & Unit Economics
- In-house versus outside coil EBITDA split: Management disclosed that in-house pipe delivers approximately INR7,500 per ton in EBITDA, while pipe made from outside coil yields INR2,200-2,500 per ton at a normal level.
- The 60-40 coil ratio is steady: The proportion of outside coil to internal coil will be maintained at the 60-40 level, a structural feature of the business as galvanised pipe production increased the quantum of outside purchase coil.
- Raw material cost lag is structural: When raw material prices move, the P&L impact is delayed by roughly one quarter. Iron ore procured in November began working through in late December, so the benefit of price declines always trails the selling-price impact of HR coil moves.
- Rainy season creates a recurring Q2 drag: Q2 typically sees lower margins due to the rainy season affecting raw materials (coal, iron, moisture content), causing an approximate 1% difference versus other quarters.
- Financial costs declining: Financial costs fell significantly, driven by repayment of long-term borrowings.
Vikas Kumar Goyal: "Whenever the price of raw material will come down or increase, so I will get the impact later. So it will always be with us that if the price of raw material decreases or increases so the impact will be there for a quarter of the time."
Market Approach & Competitive Positioning
- Carbon steel is a cost-competitive maturity play: Management acknowledges the Indian carbon steel market is at a maturity stage, where the future will be fought on cost competitiveness.
- Stainless steel marketing is ground-up and co-branded: For carbon steel, the focus is on demand from West, Central and North India through on-ground meetings with customers, fabricators and retailers, without advertising or brand ambassadors. For stainless steel, the approach is co-branding with MOU partners and global marketing.
- European and Chinese competitors have structural advantages: Management flagged that European and Chinese players hold technological advantages, scale advantages and local government support. The PLI scheme is positioned as India's counterweight, with the company's entire expansion now eligible.
- Market creation ahead of capacity: With 1 to 1.5 years until greenfield commissioning, sales and marketing teams are being hired now to build demand, so that by Q4 FY27 when production is ready, the market will already exist.
- Working capital will rise with greenfield: Working capital days are expected to increase by 10-15 days initially when the stainless steel greenfield goes live, stabilizing at around 10 days once the product gains market acceptance.
Management: "So, these 2 big countries, European Bloc and Chinese, they are having technological advantage, sale advantage and their own local government support. Similarly, if you look at India, like we just said that we are eligible in PLI scheme. Entire expansion that we are doing is now eligible under PLI scheme."
Unanswered & Deferred
- PLI quantum withheld: Management declined to quantify the PLI benefit, stating the MOU with government must be executed first, expected by mid-February.
- Seamless pipe timeline is open-ended: Entry is described as "research" stage with a possible technological partner and joint venture structure, but no timeline was committed beyond "as soon as possible."
- DFT plant announcement pending: Currently in planning stage; could land in FY27 or FY28, with no firm commitment given.
- Subsidiary land transaction flagged: An advance of INR11.5 crores was paid for land later found to be already mortgaged. Management explained the transaction mechanics but did not address whether it constitutes fraud or outline recovery steps.
- Gross margin decline not fully unpacked: An analyst question on gross margin decline was initially confused with "GP" (galvanised pipes), requiring clarification. The subsequent explanation cited raw material cost increases and the lag effect, but a detailed walk was not provided.
- Northeast/North expansion not addressed: A question about proactive steps to expand in the Northeast and North, given government focus, was deflected into a discussion of price differentials between products and top players.
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Q4 FY26 EBITDA per ton | INR7,500 on a blended basis | Q4 FY26 |
| FY26 full-year EBITDA per ton | ~INR7,000 on a blended basis | FY26 |
| FY26 operating EBITDA | Upward of INR260 crores at enterprise level | FY26 |
| Q4 FY26 volume | Approximately 1 lakh tons blended | Q4 FY26 |
| Stainless steel brownfield completion | 58,000 to 1,16,000 tons; benefit from Q1 FY27 | End-March 2026 |
| Stainless steel 300/200 series mix | 50-50 target | Q4 FY26 |
| Kesda greenfield Phase 1 commissioning | 3,50,000 tons; commercialization in Q1 FY28 | Q4 FY27 |
| PLI MOU execution | MOU with government expected | Second week of February 2026 |
| Working capital impact from greenfield | Increase of 10-15 days initially, stabilizing at ~10 days | At greenfield go-live |
Key Metrics
| Metric | Q3 FY26 |
|---|---|
| Revenue | ₹589 cr, +60% YoY |
| Revenue (9M FY26) | ₹1,728 cr, +70% YoY |
| EBITDA | ₹51 cr, +34% YoY |
| EBITDA (9M FY26) | ₹184 cr, +73% YoY |
| PAT | ₹24 cr, more than doubled YoY |
| PAT (9M FY26) | ₹88 cr, more than doubled YoY |
| EBITDA per ton | ₹5,500+, down from ₹6,100 in Q2 FY26 |
| EBITDA per ton (9M FY26) | over ₹6,800 |
| FY26 EBITDA per ton guidance | around ₹7,000 (blended, full year) |
| Q4 FY26 EBITDA per ton guidance | ₹7,500 (blended) |
| FY26 operating EBITDA guidance | upward of ₹260 cr (enterprise level) |
| Value-added sales volume (9M FY26) | 2.6 lakh tons, +60% YoY |
| Stainless steel sales volume | 13,400 tons |
| Stainless steel 300 series sales volume | ~1,200–1,300 tons |
| Total debt | ₹210 cr (₹40 cr term loans, ₹170 cr working capital) |