Key Takeaways
- Margin reset, not structural: EBITDA fell to ~9% for FY23, driven entirely by ~₹20 crore of one-time commissioning costs from new projects; stripping those out, EBT margin was 4.32%, in line with historical profitability.
- The capex cycle is done: Management declared no further investments for a considerable period, with all major projects fully mature and throwing out cash from day one; the focus now shifts to debt repayment.
- Sheet Metal is the FY24 growth engine: Three plants enter mass production from April '23, targeting over ₹400 crore in FY24 revenue at ~10% EBITDA, alongside a new machining facility that opens export doors at higher value-add.
- JV drag is ending: All joint ventures are now EBITDA-positive or better, with the helmet JV expected to be full-year PAT positive by March '23; management stated JVs "will not be eating away money going forward" operationally, with two JVs still dependent on exchange rate fluctuations.
- What to watch next quarter: Whether the Mysore plant commissioning in Q4 adds another layer of one-time costs, the pace of Sheet Metal revenue ramp from April '23, and any forex-driven slippage in the Kwangsung and Jinyoung-Sandhar JVs.
Margin Bridge: The One-Time Cost Story
- The ₹20 crore drag: H1 FY23 included an additional loss of ₹20.25 crore from new projects due to significant initial costs that are not part of the capitalization; eliminating this, EBT would have been ₹61.71 crore (4.32% of income), matching past profitability.
- Why costs hit now: Capitalization stops when job work or internal sampling begins, but volumes and revenue only kick in after a lag; the quarter absorbed license costs, sampling, testing, and QAV expenses across multiple new plants.
- RM cost impact: One-off initial costs (component buildup, inventory, testing) added around 4% to RM cost in the quarter; barring that, no other negative impact on the raw material line.
- Romania specifically: A ₹5 crore one-time cost hit from Romania as job work started, covering license costs and other startup expenses; a ₹24 crore cash subsidy from the Romanian government is confirmed and expected in March.
- Recovery path: These one-time expenses are not expected to recur in succeeding quarters; management targets 200 to 250 bps of margin improvement in the coming year as new-project activities finish and operations streamline from April '23 onwards.
Yashpal Jain: "So, if we have to eliminate this then I mean our EBT comes to INR61.71 crore, which is roughly 4.32% of our income, which used to be our profit in the past also. So, more or less, we are on the track, sir."
Capex Cycle: Done, Now Harvest
- H1 capex vs cash flow: ₹133 crore of capex against ₹106 crore of operating cash, resulting in only ₹23 crore of incremental borrowing; the heavy-lifting phase is behind the company.
- All plants commissioned except one: Every new plant is now live except Mysore, which comes online in Q4 FY23; Mysore samples have already been tested in the existing Hosur facility.
- No further capex: Management sees no further investments for a considerable period; ₹296 crore is required to complete the remaining seven or eight projects in the pipeline, and after that, the capex cycle ends.
- Fully mature from day one: All new investments are described as fully mature, with 100% capacity utilization from the start; there is no ramp-up lag of growing from 10% to 50% utilization.
- Debt repayment priority: Targeting close to ₹200 crore of free cash flow next year for debt repayment; at least ₹200 crore of debt reduction in the next financial year, with term loan dropping to around ₹100 crore domestically.
- Debt composition: Total debt expected to land around ₹690–700 crore by March '23, split ₹300 crore overseas and ₹400 crore domestic; overseas borrowing costs average just 2–2.5%, so the carrying cost is minimal.
Jayant Davar: "I am very happy to say that from our perspective, at our given snapshot time, we see no further investments for a considerable period of time going forward. So, we have no more CapEx's that are in line to be spent in the next year... we look at debt to be paid off very, very quickly before we move into any other segments."
Sheet Metal & Machining: The FY24 Growth Pillars
- Sheet Metal ramp-up: Three plants (Hosur, Nalagarh, Halol) are in testing; mass production begins from April '23, with major footfall expected in Q4 FY23. H2 FY23 revenue target from these new businesses is ₹132–135 crore.
- FY24 Sheet Metal ambition: Revenue plans exceed ₹400 crore, with EBITDA margin expectations of 9–10% in the first year.
- Machining facility: A new facility with 35 lines and 300 new machines is going live; the machining business from TVS moves to commercial production by January '23, and the relocation into Sandhar's own facility makes it a substantial forerunner for both India and exports.
- Machining economics: The contract with the customer carries an 8% margin on total turnover value; EBITDA from day one is expected to be in double digits.
- Export angle: Management noted that most exports from India happen in machined form, and companies in that space carry large valuation multiples; the machining facility is positioned to open those export doors with much higher value-add.
- New projects combined: Sheet Metal and Romania together are expected to deliver around ₹500 crore in turnover in the first year; machining adds roughly ₹77 crore, per customer estimates. The condition: no major incidents in the economy or geopolitical conditions.
Yashpal Jain: "So, all these Sheet Metal plants will be coming into mass production from April' 23. So, in the current financial year, I would say in the current half year there is not much of the sales value from the Sheet Metal business."
Aluminium Die Casting: The Outperformer
- Top vertical in H1: ADC outperformed all other verticals in H1 FY23, with regular orders flowing from Honda, TVS, Hero, and Royal Enfield; a new order from Denso is also growing.
- Margin impacted by commissioning: H1 EBITDA margin was 8.5%, weighed down by commissioning of new projects and lines; management expects ADC to cross into double-digit EBITDA margins, and with machining, margins beyond 11–11.5%.
- Capacity sufficient: No major capex is needed for a demand surge; existing capacity can handle volume increases, with at most one incremental machine required, not a new plant. Management declined to disclose exact capacity utilization, citing part-to-part variability.
- Four-wheeler push: Sandhar is targeting new markets and new customers in four-wheelers and commercial vehicles for the ADC segment, broadening beyond its traditional two-wheeler base.
Jayant Davar: "We have also just received the order from Denso and that is growing. So, in all, we are very, very bullish on the ADC business including the Casting business and the Machining business."
Joint Ventures: The Drag Becomes a Tailwind
- Turnaround in motion: Sandhar Amkin (helmets) turned EBITDA positive and monthly PAT positive, expected to be full-year PAT positive by March '23. Winnercom-Sandhar and Sandhar-Hanshin are already PAT positive with sales over ₹35 crore each. Sandhar Hanshin Technologies registered sales of ₹27 crore and PAT of ₹1 crore.
- Others stabilizing: Sandhar Whetron is EBITDA positive and expected to grow in FY24. Jinyoung-Sandhar registered half-year sales of ₹24 crore. Kwangsung turned EBITDA positive but was hit by forex fluctuations.
- Forex fix in progress: Management has reached out to JV partners to convert imports in Jinyoung-Sandhar and Kwangsung from USD to KRW, aiming to reduce exchange-rate volatility; positive responses are expected.
- No further JV capex: No further capital expenditure is planned in any of the joint ventures.
- Breakeven trajectory: Per an analyst's math, the overall JV run rate should see no negative drag by Q4; management did not directly confirm the timeline but expressed happiness with the turnaround trajectory across all JVs.
Jayant Davar: "I'm very, very happy to say that where the joint ventures were eating away a lot of money, that will not be the case going forward."
Product & Customer Diversification
- Smart locks: Orders received from major customers; will deliver five times the revenue stake versus traditional locks; supply starts in the next quarter with some EVs, and a major line from Suzuki begins in FY24. Investments are already in place.
- Four-wheeler locking: Already secured business from Tata; close to closing deals with two other OEMs, expanding beyond the two-wheeler locking base.
- New Honda motorcycle order: Won a sole-supplier order for locks on Honda's new 100 CC motorcycle launching from Bangalore, with mass production beginning next financial year.
- EV product pipeline: Currently supplying EV-compatible products (electronic steering column lock, foldable keys, TPMS, USBs, foldable mirrors, keyless smart locks, and more) to Ather, Ampere, TVS, Mahindra & Mahindra, Tata Ace, and others.
- In-house EV development: Hub motor proto is ready with ICAT approval expected July '23; mid-drive motor ICAT approval expected April '23; motor controller and DC controller approvals expected by March–April '23; EV charger approval expected May '23. Battery management system is on hold, with approval expected February '24.
- Portfolio stance: Management is "not too taken in" by dependence on two-wheelers or four-wheelers specifically; diversification across segments, products, and customers is now largely complete.
Jayant Davar: "If you look at our smart locks, for where we've already got the orders for some of the major customers, and some of them should be coming in shortly, this will deliver us a five times stake on the revenue that comes from our traditional locks."
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Revenue growth | FY23: ~24% growth, closing ₹2,800–2,900 crore; FY24: 30% jump driven by new projects | FY23 / FY24 |
| EBITDA margin | FY23: ~9% (with Q4 upside possible); FY24: double-digit EBITDA | FY23 / FY24 |
| Margin improvement | 200–250 bps improvement as one-time new-project costs do not recur | Coming year (FY24) |
| Sheet Metal mass production | Three plants (Hosur, Nalagarh, Halol) enter mass production | April '23 |
| Sheet Metal FY24 revenue | Exceeding ₹400 crore | FY24 |
| Sheet Metal EBITDA margin | 9–10% in first year | FY24 |
| Machining commercial production | 35 lines from TVS relocated, commercial production begins | January '23 |
| Machining revenue | ~₹77 crore as per customer estimate | FY24 |
| New projects combined revenue | Sheet Metal + Romania: ~₹500 crore turnover in first year | FY24 (conditional on no major economic/geopolitical incidents) |
| Debt | Land at ₹690–700 crore | March '23 |
| Debt repayment | At least ₹200 crore repayment; free cash flow close to ₹200 crore | Next financial year (FY24) |
| No further capex | No further investments for a considerable period | Going forward |
| Helmet JV (Sandhar Amkin) | Full-year PAT positive | March '23 |
| Romania cash subsidy | ₹24 crore received | March '23 |
| Hub motor ICAT approval | Performance validation by Feb '23, ICAT approval expected | July '23 |
| Mid-drive motor ICAT approval | Proto done, ICAT approval expected | April '23 |
| Motor controller ICAT approval | Proto readiness next month, ICAT approval expected | March–April '23 |
| DC controller ICAT approval | Working since Nov '22, ICAT approval expected | In a month or two |
| EV charger ICAT approval | ICAT approval expected | May '23 |
| Smart locks major supply | Major line from Suzuki begins | FY24 |
Key Metrics
| Metric | Q2 FY23 |
|---|---|
| Revenue | ₹2,800–2,900 cr (FY23 target), 24% above FY22 |
| EBITDA margin | ~9% (FY23 target), impacted by ~₹20 cr one-time new-project losses in H1 |
| EBT (excl. new-project losses) | ₹61.71 cr in H1, 4.32% of income |
| New-project losses (one-time) | ₹20.25 cr in H1, from commissioning, sampling, and startup costs |
| Aluminium Die Casting EBITDA margin | 8.5% in H1, expected to cross double-digits with machining |
| Cabin & Fabrication EBITDA margin | ~8% in H1, expected to improve in H2 |
| Sheet Metal revenue | ₹189 cr in H1 (per an analyst's math) |
| Sheet Metal H2 FY23 revenue target | ~₹300 cr, including existing and new plants |
| Sheet Metal FY24 revenue target | Exceeding ₹400 cr from new projects |
| Capex | ₹133 cr in H1; ₹296 cr required to complete all major projects |
| Net debt | ₹567 cr current; target ₹690–700 cr by March '23 |
| Overseas EBITDA margin | ~14%, with net profit margin of 5–5.5% |
| EV revenue (overseas) | ₹400 cr expected turnover, supplying four-wheelers including EVs |
| Two-wheeler revenue share | 57–58% of total business |
| Smart-lock order book | ~₹500 cr over 2.5 years from Suzuki, starting FY24 |