Key Takeaways
- Earnings turnaround accelerating: EBITDA grew 37% YoY to INR1,699 crores, with margin expanding 3.5pp to 19.1%, driven by a 9% drop in operational cost per ton and a 12% revenue increase.
- Cost transformation is the core story: Total cost per ton has fallen 20% since the September 2022 takeover, from nearly INR5,300 to INR4,170, with management targeting a further INR530/ton reduction by FY28.
- Capacity expansion fully funded and underway: Promoters infused INR8,339 crores via warrants in April, taking the stake to 70.3%; the company targets nearly doubling capacity to 14 crore tons while remaining debt-free.
- Sanghi integration progressing, with one-offs aiding the quarter: Sanghi's 20.5% EBITDA margin included roughly INR33 cr in provision write-backs; management plans to run both refurbished kilns flat out in H2 FY25.
- What to watch next quarter: The pace of cost reduction excluding one-offs at Sanghi, progress on environmental clearances for three new kiln lines, and whether the 17% volume growth rate is sustained as the base normalizes.
Cost Leadership & Margin Expansion
- Operational cost fell 9% YoY to INR4,345 per ton, led by a 13% decline in energy cost from better fuel management; kiln-in-fuel cost dropped to INR1.84 from INR2.21 per 1,000 kcal.
- Power and fuel cost per ton decreased 13% to INR1,219, supported by structural initiatives: AFR share rose to 10.6% from 8.7%, and WHRS share increased to 13.5% from 9%.
- Logistics cost declined 8% to INR1,280 per ton through footprint optimization; secondary lead distance reduced by 4 km to 48 km, and direct dispatch to customers was maintained at 54%.
- End-state cost target is INR3,650 per ton, a further INR530 reduction from current levels by FY28, driven by captive coal, railway wagons, green power, and logistics re-engineering.
- Power cost roadmap: Current cost of about INR6.75 per unit is expected to fall to INR4.50 over five years, delivering roughly INR150 per ton in cement cost savings alone.
- Green energy scale-up: 200 MW solar commissioning this quarter; targeting 1,000 MW of renewable energy by FY26, which would meet 60% of power requirements and contribute INR90 per ton in power cost reduction by FY28.
- Captive coal security: The company won bids for two new coal mines this quarter (Dahegaon Gowari, Maharashtra and Lama Tola, Madhya Pradesh); together with the existing Gare Palma IV mine, these will cover about 50% of current coal requirements, with a target of 80-90% captive coverage within 12 months.
- Management declined to provide a year-by-year breakdown of the INR530 cost reduction, citing over 100 underlying line items, and offered only high-level heads (coal mines, railway wagons, power cost, logistics).
Ajay Kapur: "I highlighted the pillars of that journey. And I'm 110 percent confident that that journey will be made before time."
Capacity Expansion & Capital Allocation
- Current capacity stands at 7.89 crore tons of grinding capacity after the Tuticorin acquisition; the target is 14 crore tons, met through internal accruals and opening cash flows while remaining debt-free.
- Bhattapara clinker facility (0.4 crore tons clinkering, 0.48 crore tons cement) is 67% civil complete with major equipment receipt started; expected completion by Q4 FY25.
- Sankarel and Farakka grinding units are at 52% and 40% civil completion respectively; both expected by Q3 FY25.
- Maratha Chandrapur clinker line: EPC contract awarded, execution started; expected completion by Q2 FY26.
- Three additional kiln lines (one each in West, North, and South, 0.4 crore tons each) are ready for order placement as soon as environmental clearances are received, which management expects within a quarter or two at most; land and leases are already in possession.
- 35 new grinding units are targeted by FY28; units at Salai Banwa, Sindhari, Marwar, and Mundra expected by end of FY26; Hoshiarpur and Pune by FY27.
- Growth capex for the current year is INR7,500 cr, funded entirely from operating cash flows; the INR20,000 cr from the warrant subscription is reserved for strategic initiatives.
- Clinker capacity target: 8.2 crore tons by end of FY28 to support 14 crore tons of cement, with an 80% brownfield, 20% greenfield mix.
Ajay Kapur: "Three locations, one in West, one in North and one in South, 0.4 crore, 3 kilns we are ready to place orders as soon as we have the EC. And this is not so far in distant future. I'm talking of only a quarter or two at the most."
Sanghi Integration & Turnaround
- Sanghi MSA volumes increased 42% to 0.34 crore tons; of this, 4.2 lakh tons went to Ambuja and 2.5 lakh tons to ACC, with the MSA leaving a 9% EBITDA margin at Sanghi while brand margins are retained in Ambuja and ACC.
- Sanghi's Q4 EBITDA margin of 20.5% included roughly INR33 cr in one-offs: write-back of discount provisions, lower fuel cost, lower fixed cost, and provision write-backs; the MFA formula price was much lower than cost of production versus the upcoming quarter.
- Kiln refurbishment: Both kilns (rated capacity 0.66 crore tons) are undergoing refurbishment, expected to complete by H1 FY25; management plans to run both flat out at 100% in H2, targeting a minimum of 0.5 crore tons of clinker from Sanghi in FY25 and 0.7 crore-plus post-refurbishment.
- Debottlenecking progress: Jetty draft improved from 2 meters to 4.5 meters, enabling larger vessels (targeting 10,000+ DWT); the first clinker ship from Sanghi to Tuticorin carrying 50,000+ tons is being readied.
- Sanghi's credit rating was upgraded to AA from D; management's stated journey is to reach AAA.
- An analyst asked about an environment clearance document referencing 1 crore ton clinker and 1 crore ton cement capacity at Sanghi; management described the kiln refurbishment plan but did not confirm or address the specific EC document or those capacity figures.
Market Position & Volume Growth
- Volume growth of 17% last quarter significantly outpaced industry growth, achieved without disturbing markets because the company operates within premium segments.
- Premium products as a percentage of trade sales increased to 24%, and the blended cement mix was maintained at 86%, insulating the company from day-to-day commodity price wars.
- Market share ambition: Targeting 20% market share from the current ~14% through organic expansion, supported by the 14 crore ton capacity program.
- The company is under-supplied in several markets including Tamil Nadu, South, Uttar Pradesh, and parts of central India, providing a runway for volume growth as new capacity comes online.
- Management declined to comment on which competitors are losing market share, or on the relevance of smaller players, offering only general strategy commentary when asked.
Ajay Kapur: "That is an area which keeps us a little away from day to day commodity wars. But yes as more capacity comes in and if the sentiment is a little down it can have an impact on..."
Logistics & Fuel Strategy
- Rail logistics investment: 11 GPWIS rakes ordered with 8 delivered and the rest expected by end of Q1 FY25; 26 DCFC rakes ordered with 10 expected in the current financial year; an additional 10 rakes being brought in for fly ash transportation.
- Primary lead distance target is to reduce the average to about 100 km from current levels (276 km primary, 48 km secondary).
- Sea freight is expected to reach around 10% of logistics within 24 months; a different logistics model on the west coast is being developed, expected to take about 18 months to play out, with a sizable impact on freight cost.
- Coal sourcing advantage: The company leverages the Adani group's coal mining ecosystem; future mines will target G5, G6, G7 quality coal for kilns and lower quality for captive power plants, with no washing to avoid wastage.
- Fuel cost is expected to see another INR4-5 paisa per unit improvement.
- An analyst asked about the strategic disadvantage of not owning a port at Tuticorin versus Kochi and what cost can be achieved using third-party ports; management described historical coastal expertise and current arrangements but did not address the cost comparison or port ownership question.
Ajay Kapur: "We are part of an ecosystem, a platform called Adani, where we have some of the smartest guys who are running coal mines, who understand coal."
ESG & Operational Efficiency
- Net zero commitment by 2050 for Ambuja and ACC, with near-term targets validated by SBTi; 60% of power from green sources targeted by FY28.
- WHRS capacity has grown to 134 MW from 40 MW at takeover; targeting 186 MW by March 2025.
- AFR share increased to 10.6% from 8.7%, contributing to the kiln fuel cost reduction.
- Clinker factor is currently around 0.6, with ACC slightly lower (uses slag in the east) and Ambuja slightly higher; the target range is 0.55-0.6, though movement into large infrastructure markets requiring OPC may shift the factor.
- Tree planting pledge: 0.83 crore trees by 2030.
- All new capacities are being built with in-built WHRS, AFR infrastructure, and railway connectivity.
- Calcined clay is being studied in partnership with institutions, with one or two industrial trials done by others, but the company has not yet done this on a commercial scale and offered no timeline.
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Capacity exit | Exit FY25 with almost 8.6 crore tons of cement capacity | FY25 end |
| Bhattapara clinker facility | 0.4 crore tons clinkering, 0.48 crore tons cement commissioned | Q4 FY25 |
| Sankarel and Farakka grinding units | Both units commissioned | Q3 FY25 |
| Maratha Chandrapur clinker line | Clinker line commissioned | Q2 FY26 |
| Three new kiln lines (West, North, South) | Orders placed for 0.4 crore tons each | Within 1-2 quarters of receiving EC |
| Sanghi kilns | Both kilns running flat out at 100% | H2 FY25 |
| Sanghi clinker volume | Minimum 0.5 crore tons clinker from Sanghi | FY25 |
| Captive coal coverage | 80-90% of coal requirement from captive sources | Within 12 months |
| Renewable energy capacity | 1,000 MW commissioned, 60% of power from green sources | FY26 |
| WHRS capacity | 186 MW commissioned | March 2025 |
| Cost reduction | INR530/ton further reduction from FY24 baseline | By FY28 |
| Power cost | Reduction from ~INR6.75/unit to ~INR4.50/unit | Over 5 years |
| End-state cost per ton | INR3,650 per ton | By FY28 (management confident of beating timeline) |
| Market share | 20% market share through organic expansion | No date (linked to 14 crore ton capacity) |
| Grinding units | 35 new grinding units commissioned | By FY28 |
| Clinker capacity | 8.2 crore tons | By FY28 |
| Sea freight share | ~10% of logistics | Within 24 months |
| Net zero | Ambuja and ACC net zero | By 2050 |
| Tree planting | 0.83 crore trees planted | By 2030 |
Key Metrics
| Metric | Q4 FY24 |
|---|---|
| Consolidated revenue | ₹8,894 cr, up 12% YoY |
| Full-year FY24 revenue | ₹33,160 cr, up 7% YoY |
| EBITDA | ₹1,699 cr, up 37% YoY |
| EBITDA per ton | ₹1,026, up 17% YoY |
| EBITDA margin | 19.1%, expanded 3.5 ppt YoY |
| Full-year FY24 EBITDA | ₹6,400 cr, up 73% YoY |
| Full-year FY24 EBITDA margin | 19.3%, expanded 7.4 ppt YoY |
| Full-year FY24 PAT (Ambuja) | ₹4,738 cr, highest ever |
| Operational cost per ton | ₹4,345, down 9% YoY |
| Power and fuel cost per ton | ₹1,219, down 13% YoY from ₹1,404 |
| Kiln-in-fuel cost | ₹1.84 per 1000 kcal, down 17% from ₹2.21 |
| Logistics cost per ton | ₹1,280, down 8% YoY from ₹1,389 |
| Consolidated cash and cash equivalents | ₹24,338 cr (including ₹8,339 cr warrant proceeds received in April) |
| Net worth | ~₹60,000 cr (including warrant proceeds) |
| Total grinding capacity | 7.89 cr tons (post Tuticorin acquisition) |
| Master Supply Agreement volume | 0.34 cr tons, up 42% from 0.24 cr tons |
| Sanghi MSA volume to Ambuja | 4.2 lakh tons |
| Sanghi MSA volume to ACC | 2.5 lakh tons |
| Sanghi clinker production | 0.07 cr tons (Q4); kiln 2 non-operational |
| Sanghi cement production | 0.08 cr tons (Q4) |
| Sanghi EBITDA margin | 20.5% (Q4); included ~₹33 cr of one-off provision write-backs |
| Blended cement mix of total sales | 86% |
| Premium products as a percentage of trade sales | 24% |
| Share of AFR in fuel mix | 10.6%, improved from 8.7% |
| Share of WHRS in power mix | 13.5%, improved from 9% |
| WHRS capacity | 134 MW currently; targeting 186 MW by March '25 |
| Secondary lead distance | 48 km, reduced by 4 km |
| Direct dispatch to customers | 54% |
| Volume growth (Q4) | ~17%, ahead of industry growth |
| FY25 exit capacity target | ~8.6 cr tons |
| FY28 clinker capacity target | 8.2 cr tons |
| FY28 cost reduction target | ₹530 per ton further reduction |
| End-state cost target | ₹3,650 per ton |
| Power cost | ₹6.75 per unit currently; targeting ~₹4.50 over next 5 years |
| Captive coal mine coverage target | 50% of current requirement from three mines; 80-90% within 12 months |
| Limestone reserves | 780 cr tons total |
| Rail coefficient | ~27% |
| Sea freight share target | ~10% within 24 months |
| Channel partners | Over 1 lakh |