Key Takeaways
- Transformational quarter, SKS acquisition closed: The long-awaited 600 MW SKS Power acquisition was completed and amalgamated, with its true financial impact to begin reflecting from Q3.
- Operations deliberately curtailed for power sales: Steel and ferro alloy production was reduced to sell power on commercial terms, while captive thermal generation hit a record high.
- Subdued commodity prices across the board: Steel prices stayed weak on Chinese imports, ferro alloy prices corrected after a brief spike, and merchant power rates were depressed by heavy rainfall.
- Coal mining and renewable pipeline advancing: Shahpur West mine received Stage 2 forest clearance, and both a 25 MW hydro and 50 MW solar project are on track for commissioning this fiscal year.
- What to watch next quarter: Whether the SKS EBITDA contribution lands in the INR1.5–2.5 per unit guided range, the pace of government infrastructure spending resumption, and any concrete import curb measures on Chinese steel.
SKS Power Acquisition: The Quarter's Defining Event
- Deal closed and consolidated: Sarda completed the IBC-route acquisition of SKS Power Generation (Chhattisgarh) Limited on August 21, 2024, and amalgamated it effective September 1, with results included from August 22.
- True impact deferred to Q3: Only a partial quarter of SKS contribution is in these numbers, so the full 600 MW effect on top and bottom line will only become visible from the next quarter onward.
- One unit under shutdown: One of the two generating units at SKS was offline from September 1, 2024, constraining output during the stub period.
- PLF guided at 80–85%: The plant can run at full 600 MW capacity, but management expects to curtail production when merchant power prices on IEX are not remunerative enough.
- EBITDA per unit in INR1.5–2.5 range: Management guided this band, with the wide spread reflecting merchant price volatility, and noted a marginal improvement is possible once own coal from Gare Palma arrives in 2–3 years.
- Legal overhang persists: An appeal challenging the NCLT approval was dismissed by NCLAT but has now been challenged before the Supreme Court, with no hearing date set.
P K Jain: "It is up to the Supreme Court, matter being sub judice. I think the Supreme Court will take into consideration each and every aspect. Ultimately, it is being -- matter being sub judice, I don't think we can give any specific."
Steel & Ferro Alloys: Price Pressure and Import Threat
- Steel production deliberately reduced: The company cut production of steel billets and downstream products during the quarter to divert power to merchant sales on commercial consideration.
- Chinese imports depressing domestic prices: A significant increase in imports, concentrated in electrical steels and flat steels, has kept steel prices subdued, compounded by reduced Indian steel exports.
- Government action anticipated: Management noted the government has taken cognizance of the import surge and is working on curbs, expressing hope that measures will be in place soon.
- Ferro alloy prices corrected sharply: After a sharp jump in June driven by fears of raw material shortage from South 32 mine disruptions in Australia, prices have since corrected back to prior levels.
- One furnace offline for modification: One of five ferro alloy furnaces at Raipur was under shutdown from September 1 for modification work, restarting only on November 1, 2024.
- Demand pickup not expected until January: Management flagged that December is seasonally a lull month, with global demand slow due to geopolitical disturbances, and expects buying activity to resume only after the New Year.
Manish Sarda: "In the last few months, we have seen a lot of imports happening from China. And it's basically on the electrical steels and flat steels that are coming into the country. And the government has taken a note of that and is working on that to curb the imports also. So soon, we'll -- we are very hopeful that soon we'll see that there will be some import curbs in place."
Power Business: Record Captive Generation, Soft Merchant Realizations
- Captive thermal generation at an all-time high: The company recorded its highest ever quarterly generation from captive thermal power plants during Q2.
- Merchant power prices subdued: Above-average rainfall during the quarter dampened merchant power realizations on exchanges.
- Hydropower grew 8% YoY: Generation increased on the back of a better, though delayed, monsoon, and October and November generation is also tracking ahead of the prior year.
- 25 MW Rehar hydro project ready for trial: The project is installed and ready for commissioning, with eligibility confirmed for incentives under Chhattisgarh's new industrial policy for hydropower.
- 50 MW solar project on track: Scheduled to be operational by the end of the current financial year, alongside the hydro addition.
- 30 MW TG set replacement underway: An order has been placed with BHEL, with work progressing on schedule and the plant expected to be operational by mid-FY27.
Coal Mining & Infrastructure Pipeline
- Gare Palma IV/7 capacity increase approved: Consent to operate received for raising mining capacity from 0.14 crore tons to 0.17 crore tons.
- Coal washery expansion cleared: Environmental clearance obtained to increase capacity from 0.1 crore tons to 0.52 crore tons in two phases, with the first step to 0.18 crore tons expected by end-FY25 or early FY26.
- Shahpur West advancing toward production: Stage 2 forest clearance received, mining lease execution is in process, and mine opening permission is expected before the end of the current quarter, with production to start within two years of that permission.
- Bartunga Hill in planning stage: The joint venture mine is in the process of DPR preparation and mining plan approval.
- Kalyani mines at a standstill: While a boundary dispute has been sorted out, the project remains in the evaluation and viability survey stage, with final outcome dependent on approval from South Eastern Coalfields Limited.
- Waste utilization project near Visakhapatnam: Expected to be operational before the end of the current financial year.
Macro & Demand Outlook
- Government capex expected to resume: Management acknowledged that infrastructure spending by the government has been below expectations over the last six months but anticipates a pickup in the next 3–4 months.
- Near-term demand subdued: The next 2–3 months are expected to remain a little subdued, with December holidays creating a seasonal lull before activity resumes in January.
- Global ferro alloy demand waiting on geopolitical clarity: Management pointed to low steel production in Japan and the EU, and is watching for the impact of incoming US trade policy on China before calling a demand recovery.
- Broader macro tailwinds cited: A reversal of the interest rate cycle, falling fiscal deficit creating room for government capex, healthy credit offtake, strong capital markets indicating a private capex revival, and robust real estate bookings were all listed as supportive factors.
Manish Sarda: "And we are also waiting and watching very quietly as to what will happen when Trump's policy comes into place. What are the impacts that are going to be put in place for China? We have to see what are the policies that he is bringing out for trade. And only then we can expect some demand pickup."
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| SKS Power EBITDA per unit | INR1.5 to INR2.5 range, depending on price volatility | Ongoing from Q3 FY25 |
| Shahpur West coal mine opening | Mine opening permission expected | Before end of current quarter (Q3 FY25) |
| Shahpur West production start | Production to begin within 2 years of mine opening permission | ~FY27 |
| Coal washery capacity expansion (Phase 1) | Increase from 0.17 to 0.18 crore tons | End of FY25 or early FY26 |
| 25 MW Rehar hydropower project | Commissioning | Current financial year (FY25) |
| 50 MW solar power project | Commissioning | Current financial year (FY25) |
| Waste utilization project (Visakhapatnam) | Operational | Before end of FY25 |
| 30 MW TG set replacement | Plant operational | Mid-FY27 |
| SKS own-coal benefit | Marginal EBITDA improvement when Gare Palma coal feeds SKS | 2–3 years |
Key Metrics
| Metric | Q2 FY25 |
|---|---|
| Consolidated revenue | ₹1,159 cr, vs ₹926 cr QoQ and ₹1,001 cr YoY |
| Consolidated profit after tax | ₹195 cr, vs ₹199 cr QoQ and ₹141 cr YoY |
| Consolidated net debt | ~₹1,300 cr, post SKS acquisition, including working capital |
| Cash and liquid investments | >₹1,500 cr, as of Sep 30, 2024, excluding treasury loans |
| Debt to EBITDA | Below 1x, expected to decline further as SKS EBITDA reflects |
| Long-term loans repayable within 1 year | <₹200 cr |
| SKS Power acquisition cost | ₹1,950 cr spent during the quarter, excluding normal capex |
| SKS Power expected annual turnover | ~₹2,000 cr (per management) |
| SKS Power expected annual profit | Above ₹500 cr (per management) |
| SKS Power blended realization | ~₹5 per unit |
| SKS Power EBITDA per unit | ₹1.5–2.5 range |
| SKS Power expected PLF | 80%–85% |
| SKS Power annual generation at 80–85% PLF | >400 cr units |
| Hydropower generation growth | 8% YoY |
| Ferro alloy exports volume | 28,200 MT, vs 32,500 MT QoQ and 25,500 MT YoY |
| Ferro alloy exports value | ₹251 cr, vs ₹273 cr QoQ and ₹189 cr YoY |
| Ferro alloy price stability | $860–$880 per tonne |
| Domestic crude steel production | 3.62 cr tons, <1% QoQ decline, 2.7% YoY growth |
| Domestic finished steel consumption | 3.71 cr tons, 4.2% QoQ growth, 11.6% YoY growth |
| India steel imports growth | 44.5% QoQ and 43.2% YoY |
| India steel exports decline | 14.8% QoQ and 29% YoY |
| India net steel imports | ~0.19 cr tons in the quarter |
| Gare Palma IV/7 coal mining capacity | 0.17 cr tons, increased from 0.14 cr tons |
| Coal washery capacity | 0.52 cr tons in 2 phases, from 0.1 cr tons |
| Captive coal allocation to power plant | >0.1 cr tons of 0.17 cr tons total |
| SKS Power total coal requirement | >0.3 cr tons annually |
| Iron ore mining cost | ₹2,500–₹2,700 per tonne, depending on output |
| Total power capacity post 25 MW hydro | ~1,000 MW |